If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-085-24409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.353062,"lon":-80.152448,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Mercer | |
| Municipality: Lake Township | |
| Operator Name: VISTA OPR INC | |
| Well Pad ID: | |
| Farm/Lease Name: SHANNON G 1 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2008-04-28 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 41.353062 | |
| Longitude: -80.152448 |
| Date | Event |
|---|---|
| 2008-04-28 | New Permit Application |
| 2008-06-30 | Performed Spud Operation |
| 2008-07-08 | Drilling Completion |
| 2008-07-21 | Perforation |
| 2008-11-04 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | VISTA OPR INC | 3651.00 | 131 | 0.00 | 0 | 0.00 | 0 |
| 2009 | VISTA OPR INC | 13250.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | VISTA OPR INC | 9,579.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | VISTA OPR INC | 6,448.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | VISTA OPR INC | 10,060.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2013 | VISTA OPR INC | 6,319.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | VISTA OPR INC | 4,530.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | VISTA OPR INC | 3,269.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | VISTA OPR INC | 3,217.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2017 | VISTA OPR INC | 2,552.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | VISTA OPR INC | 2,339.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2008 | VISTA OPR INC | Brine | 420.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2009 | VISTA OPR INC | Brine | 330.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2010 | VISTA OPR INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2012 | VISTA OPR INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2013 | VISTA OPR INC | Produced Fluid | 25.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2013 | VISTA OPR INC | Produced Fluid | 25 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | VISTA OPR INC | Produced Fluid | 31.00 Bbl | ROAD SPREADING | |
| 2019 | VISTA OPR INC | Produced Fluid | 26.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1718477 | Primary Facility | 2008-07-02 | Drilling/Alteration | No Violations Noted | |
| 1718901 | Primary Facility | 2008-07-08 | Drilling/Alteration | No Violations Noted | |
| 1721543 | Primary Facility | 2008-07-17 | Routine/Complete Inspection | No Violations Noted | |
| 1727493 | Primary Facility | 2008-08-12 | Routine/Complete Inspection | No Violations Noted | |
| 1868186 | Primary Facility | 2010-03-04 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]