If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21719 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.85195,"lon":-78.168275,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Pleasant Valley Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Well Pad ID: | |
Farm/Lease Name: FISK HOLLOW PLEASANT VALLEY PAD B 2484 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.851950 | |
Longitude: -78.168275 |
Date | Event |
---|---|
2010-08-19 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2016283 | Primary Facility | 2011-11-01 | Routine/Complete Inspection | No Violations Noted | An inspection was conducted at the Fisk Hollow Pleasant Valley Pad B on 11/1/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed at the drill pad and water impoundment. The sites were stablized. No wells have been drilled and no conductors have yet been set. No violations were cited during this inspection. - MRN |
2147769 | Primary Facility | 2013-03-13 | Site Restoration | No Violations Noted | An inspection of the Fisk Hollow Pleasant Valley Pad B in Pleasant Valley Township, Potter County was conducted on March 13, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2483, 2484, 2502 and 2503) . The last self-inspection conducted on behalf of PGE was on 3/12/13. The site has been re-graded and temporarily stabilized. The site was determined to not meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization at this time. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed. A follow up inspection will be conducted at a later date to verify the site has been permanently stabilized. The Well Site Restoration Reports will not be approved until that time. No violations were cited during this inspection. |
2212828 | Primary Facility | 2013-10-16 | Site Restoration | No Violations Noted | An inspection of the Fisk Hollow Pleasant Valley Pad B in Pleasant Valley Township, Potter County was conducted on October 16, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2483, 2484, 2454, 2502 and 2503) . The last self-inspection conducted on behalf of PGE was on 10/10/13. There are no conductors/well presently at the site. The site has been regraded and has been determined to meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization at this time. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was observed. The Well Site Restoration Reports have been approved based on this inspection. No violations were cited during this inspection. |
2417868 | Primary Facility | 2015-10-21 | Routine/Complete Inspection | No Violations Noted | Routine inspection. Pad B has been restored, is permanently stabilized and temporary E&S controls have been removed. Four wells were permitted for Pad B, but never drilled. The impoundment area is located separately from the pad. The impoundment has been reclaimed and temporarily stabilized. Vegetation is becoming established. Silt sock was observed around the north and east perimeter of the site. Notice of Termination can be submitted after impoundment area is permanently stabilized and silt sock removed. No issues noted. TLT |
For data sources see[5]