X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21878

Well Details

Well ID: 37-105-21878
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Ulysses Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153961
Farm/Lease Name: HEADWATERS 145 4HU
License Status: Active
Spud Date: 2017-02-18
Permit Date: 2016-10-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.837170
Longitude: -77.731833

For data sources see[1][2][3]

Well History

Date Event
2016-10-18 New Permit Application
2017-02-11 Performed Spud Operation
2017-10-17 Drilling Completion
2018-02-11 Perforation
2018-02-12 Perforation
2018-02-14 Perforation
2018-02-15 Perforation
2018-02-16 Perforation
2018-02-17 Perforation
2018-02-18 Perforation
2018-02-19 Perforation
2018-02-20 Perforation
2018-02-21 Perforation
2018-02-22 Perforation
2018-02-24 Perforation
2018-02-25 Perforation
2018-02-26 Perforation
2018-02-27 Perforation
2018-02-28 Perforation
2018-03-01 Perforation
2019-07-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-11 2018-03-01 11,244 7,830,910 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 In-situcide Promoter Silver Creek Services Biocide Hypochlorous Acid, Sodium Salt 7681-52-9 12.5 0.00158268 1210.44
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.3685 9,459,560.0
SI-117LF Silver Creek Services Scale Inhibitor Phosphino carboxylic acid polymer 71050-62-9 20 0.00130935 1001.4
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) 34690-00-1 20 0.00130935 1001.4
Copolymer of Maleic and Acrylic Acid 52255-49-9 30 0.00196402 1502.1
Ethylene glycol 107-21-1 10 0.000654674 500.7
DETA phosphonate 15827-60-8 20 0.00130935 1001.4
HCL Acid (5% to 7.5%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 95 1.30265 996280
Hydrogen Chloride 7647-01-0 7.5 0.102841 78653.7
Water JKLM Energy Carrier/Base Fluid Water 7732-18-5 100 85.4449 65,349,000.0
Other Chemical(s) Listed Above See Trade Name(s) List DETA phosphonate 15827-60-8 20 0.00130935 1001.4
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) 34690-00-1 20 0.00130935 1001.4
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001560 11.933
Water 7732-18-5 95 1.30265 996280
Cinnamaldehyde 104-55-2 20 0.00006241 47.733
Water 7732-18-5 30 0.000102293 78.234
Butyl cellosolve 111-76-2 20 0.00006241 47.733
Polyethelene glycol 25322-68-3 50 0.000170488 130.391
Formic acid 64-18-6 20 0.00006241 47.733
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00686884 5253.34
Phosphino carboxylic acid polymer 71050-62-9 20 0.00130935 1001.4
Polyether 60828-78-6 10 0.00003121 23.867
Glutaraldehyde 111-30-8 1 0.00658061 5032.9
Copolymer of Maleic and Acrylic Acid 52255-49-9 30 0.00196402 1502.1
K-BAC1020 Silver Creek Services Biocide Water 7732-18-5 30 0.000102293 78.234
Polyethelene glycol 25322-68-3 50 0.000170488 130.391
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.00007161 54.764
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001560 11.933
Cinnamaldehyde 104-55-2 20 0.00006241 47.733
Butyl cellosolve 111-76-2 20 0.00006241 47.733
Ethylene glycol 107-21-1 40 0.000124825 95.467
Polyether 60828-78-6 10 0.00003121 23.867
Formic acid 64-18-6 20 0.00006241 47.733
WFRC 2200 U.S. Well Services, LLC Friction Reducer Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00686884 5253.34
Distillates, petroleum, hydrotreated light 64742-47-8 30 0.0412131 31520.1
CPS 500 U.S. Well Services, LLC Fluid Loss Additive Ceramic Microspheres 66402-68-4 65 0.42774 327139
Glutaraldehyde 111-30-8 1 0.00658061 5032.9

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 JKLM ENERGY LLC 1,342,363.00 179 0.00 0 0.00 0
2019 JKLM ENERGY LLC 938,571.00 331 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 JKLM ENERGY LLC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 110.00 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Synthetic Liner Materials 9.33 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 2,655.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 73.00 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drill Cuttings 4,263.08 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 719.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 44.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid 761.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid 3,822.00 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 20,076.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 JKLM ENERGY LLC Synthetic Liner Materials 46.27 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 66.31 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 22,159.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Drill Cuttings 145.00 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 4,598.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 21.67 Bbl INJECTION DISPOSAL WELL 34-007-23262
2019 JKLM ENERGY LLC Produced Fluid 34.17 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 JKLM ENERGY LLC Produced Fluid 4,950.52 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 3,922.34 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 1,695.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 61.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 JKLM ENERGY LLC Produced Fluid 1,185.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 JKLM ENERGY LLC Soil Contaminated by Oil 1.52 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 1,002.50 Bbl INJECTION DISPOSAL WELL 34-155-24099
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 16.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 197.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Produced Fluid 188.33 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills 1.52 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 5.13 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Synthetic Liner Materials 11.22 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 1,439.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2525112 Primary Facility 2016-10-04 Preoperation Inspection No Violations Noted The Department of Environmental Protection attended a preconstruction meeting for the JKLM Headwaters 145 Pad (ESG29-105-15-0007), located in Ulysses Township, Tioga Co on 10/4/2016 @ 1100 hours. Present for the meeting were myself; Adam Blint, JKLM Land Manager; John Watts, J.L. Watts excavating; Jim Fowler and Al Pence, New Growth Resources. The weather was 65° partly sunny.

The Headwaters 145 Pad is an unconventional well site that will be constructed southeast of the existing Headwaters 143 well site. The permit also encompasses a natural gas gathering line that will connect the HW 145 to the HW 143 well site. As of today’s meeting, the 6 unconventional well permits submitted for the HW 145 pad do not show an issuance date in eFACTS. JKLM must have a valid well permit in hand before earth disturbance activities can commence. The start date for the project has not been scheduled at this time. Please contact the WQS when a valid well permit has been issued and a start date for the project has been schedul

2547831 Primary Facility 2016-12-27 Preoperation Inspection No Violations Noted The Department of Environmental Protection conducted a pre-spud inspection at the JKLM Headwaters 145 Pad (ESG29-105-15-0007), located in Ulysses Township, Tioga Co on 12/27/2016 @ 1300 hours. The weather was 35°, sun/clouds, snow and ice on the ground melting rapidly. A site ID sign was observed at the entrance to the access road. A copy of the well permits, E&S plan and E&S inspection log was located in the mailbox onsite. The site was last inspected by company personnel on 12/14/2016 with the following comments “Access road and location being constructed. Signs in place, permits in box, MRP in box. Snow covered. No flowing or standing water. Access and location culverts being installed.”

The Headwaters 145 Pad is an unconventional well site that will be constructed southeast of the existing Headwaters 143 well site. The permit also encompasses a natural gas gathering line that will connect the HW 145 to the HW 143 well site. As of today’s inspection perimeter BMP’s consist of chipped material berms. The

2564371 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted
2573324 Primary Facility 2017-03-20 Routine/Complete Inspection No Violations Noted The DEP inspected the JKLM Headwaters 145 well site on 3/20/2017 @ 1100 hours. Ron Burdick was the company rep onsite for JKLM. The HAD rig is currently onsite to drill the top hole portions of the 1HU-6HU wells. The rig has completed the drilling on the 1HU well and has skidded over onto the 2HU well. They were rigging up and preparing to drill on the 2HU at the time of this inspection. Mr. Burdick stated The HAD rig should be onsite until mid April. JKLM plans to bring the H&P 500 rig on location mid-Sept. to drill the horizontal portions of the wells. No violations are noted at this time. I departed the site at 1345 hours.
2573326 Primary Facility 2017-03-20 Routine/Complete Inspection No Violations Noted The DEP inspected the JKLM Headwaters 145 well site on 3/20/2017 @ 1100 hours. Ron Burdick was the company rep onsite for JKLM. The HAD rig is currently onsite to drill the top hole portions of the 1HU-6HU wells. The rig has completed the drilling on the 1HU well and has skidded over onto the 2HU well. They were rigging up and preparing to drill on the 2HU at the time of this inspection. Mr. Burdick stated The HAD rig should be onsite until mid April. JKLM plans to bring the H&P 500 rig on location mid-Sept. to drill the horizontal portions of the wells. No violations are noted at this time. I departed the site at 1345 hours.
2580108 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted
2590678 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted
2609605 Primary Facility 2017-06-14 Routine/Complete Inspection No Violations Noted
2626454 Primary Facility 2017-08-01 Drilling/Alteration No Violations Noted
2635136 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted I met John Manuel of JKLM when I arrived. H&P Flex Rig 500 on location, drilling at 6500' on the 5HU well. Containments were in good condition, and chemical storage areas were clean. Permit numbers were posted at site entrance.
2658640 Primary Facility 2017-11-07 Routine/Complete Inspection No Violations Noted A routine inspection of the of the JKLM Headwaters 145 well pad was conducted on 11/7/2017 @ 1330 hours. The weather was 32 degrees and snowing. JKLM is in the process of drilling the 3HU well. The rig was at a depth of 11,517' at the time of this inspection. The 4HU, 5HU and 6HU wells were drilled between 9/2/2017 10/19/2017. The 1HU and the 2HU have yet to be drilled. Mr. Joe Huston and Mr. Tyler Regan were present onsite during the inspection.

Fluid with an elevated conductivity was discovered in the NW corner of the rig containment below the rig mats. The field conductivity was measured between 3-4.5 mS/cm using an Oakton Multi-parameter PCSTesr 35. Mr. Huston and Mr. Regan were advised to remove the fluid with a vac truck as soon as possible. No elevated readings were detected outside of containment. The source of the fluid was not determined. No other accumulated fluid was found within the perimeter of the rig containment.

Additional E&S control along the access road may be needed to prevent sedime

2663145 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted This well was already drilled at the time of this inspection. Drilling was started on 9/30/17 and completed on 10/19/17. No issues or problems were reported during the drilling of this well.
2667416 Primary Facility 2017-12-05 Routine/Complete Inspection No Violations Noted Weather is 38 Deg. F., rainy and cloudy at time of inspection. Routine inspection of JKLM LLC, Headwaters 145 Pad on December, 5 2017.

There are total of 6 wells on location. Currently advancing 5-1/2" production casing on the 2HU well. The 1HU has not been drilled to completion as of this inspection. Drilled wells on location: 6HU drilling started on 07/25/17 and finished on 09/01/17; 5HU drilling started on 09/02/17 and finished on 09/29/17; 4HU drilling started on 09/30/17 and finished on 10/19/17; 3HU drilling started on 10/20/17 and finished on 11/16/17. We physically inspected the pad and the rig. The pad was looking neat and well organized. At the time of this inspection the 4HU drilling has been completed.

DEP representatives - Ulyana Trynovich and Lester Taylor. JKLM representative - Travis Houston - Drilling Consultant and Joe Ziemba - Drilling Consultant.

2692008 Primary Facility 2018-02-06 Routine/Complete Inspection No Violations Noted At the time of this inspection hydraulic fracturing had not yet started. Prep and set up were ongoing at the time of this inspection.
2704873 Primary Facility 2018-03-13 Routine/Complete Inspection No Violations Noted At the time of this inspection Scott West was present. This well was completed at the time of this inspection
2714876 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted I arrived onsite with Elizabeth Niles, WQS and met Scott West of JKLM. A coil tubing rig was on location; Scott informed us that they had finished drilling out plugs on the 6H and shut it in, and had just moved over to the 5H to begin drilling plugs on that well. Recent heavy rain had accumulated in containments and on the pad surface. Although the water in containment showed varied conductance (.60-11.1 mS/cm), puddles on the pad were consistently in the 2.2-3.1 mS/cm range. We noted a containment near the AST that had 20-40 gallons on fluid with elevated conductance (10.5 mS/cm); although water on the pad in proximity shower low conductance (.5-1.1 mS/cm), we did note that the containment had been constructed without a corner berm, and the liner had sagged into the corner. This created a potential path for this water to leave containment; I strongly recommend that JKLM utilize these corner berms, as it was exactly this type of berm construction that caused a release on the Reese Hollow 115 pad recentl
2715754 Primary Facility 2018-04-03 Routine/Complete Inspection No Violations Noted At the time of this inspection the hydraulic fracturing on this well was complete . A coil tubing company was on location setting up to clean out the wells after the plugs were drilled out.
2720036 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted At the time of this inspection the hydraulic fracturing and the coil tubing has been completed. The well was being set up for production.
2731598 Primary Facility 2018-05-17 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM Headwaters 145 well pad located in Ulysses Twp., Potter Co. on 5/17/18 @1100 hours. The weather was 72 degrees and sunny.

Due to recent rain events the pad surface was muddy with numerous puddles. Field Conductivity on the pad surface was screened and found to vary between 400 µS/cm – 4 mS/cm. The puddles exhibiting elevated conductivity were mostly located on the NE quadrant of the pad (see attached pictures). It is recommended the puddles exhibiting elevated conductivity be removed with a vac truck. The puddles around the AST were with in normal range.

Activity onsite consisted of installation of separators, production tanks and well tags. The site was last inspected by company personnel on 5/10/2018 with no issues noted. Containment around the well heads appeared intact and in good shape. Waste Management containers were located in the eastern corner of the pad and were tarped. Sediment traps appeared dry and not discharging.

Additional silt sock has

2748800 Primary Facility 2018-07-02 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was temporarily shut-in for the flow back process.
2803566 Primary Facility 2018-11-15 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. No annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2838374 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. A gauge on the production/ flow line indicated a psi (pounds per square inch) of 1450. The 9" x 5" (intermediate x production) casing string is connected by a flexible approximate 2" vent line that is connected to the same size annulus on the other 5 wells on this well pad on all 6 vent into a poly vent tank at the end of the row of wells. No violations were noted at this inspection.
2840279 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM Headwaters 145 well pad located in Ulysses Twp, Potter Co. on /2/14/2019 @1145 hours. The weather was mostly sunny, 29 degrees, winds SSW @10mph, humidity 48%. Onsite activity consists of 6 wells that appear to be in production. An Above-ground Storage Tank (AST) was observed ~60% full of impaired fluid.

Poly tanks onsite, in containment, do not appear to be in use and are not labeled.

No violations are noted at this time. I departed the site 1230 hours.

For data sources see[8]

References