X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-113-20004

Well Details

Well ID: 37-113-20004
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Cherry Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 149609
Farm/Lease Name: YENGO 2H
License Status: Active
Spud Date: 2010-03-19
Permit Date: 2009-12-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.526458
Longitude: -76.349467

For data sources see[1][2][3]

Well History

Date Event
2009-12-30 New Permit Application
2010-03-18 Performed Spud Operation
2011-09-18 Drilling Completion
2011-11-04 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-06-03 2012-06-03 8,591 958,188

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Carrier/Base Fluid 57.43
B-84 000064-17-5
A264 Corrosion Inhibitor Schlumberger Corrosion Inhibitor Aliphatic alcohols, ethoxylated # 1 30.00 0.00015000
Methanol 67-56-1 40.00 0.00020000
Propargyl alcohol 107-19-7 10.00 0.00005000
Aliphatic acid 30.00 0.00015000
L058 Schlumberger Iron Control Agent Sodium erythorbate 6381-77-7 100.00 0.00019000
Ottawa Sand Proppant Quartz 14808-60-7 100.00 10.56
J609 Schlumberger Friction Reducer Aliphatic amine polymer 30.00 0.03
Ammonium sulfate 7783-20-2 30.00 0.03
B-84 X-Chem Antibacterial Agent 4.00
Didecyl dimethyl ammonium chloride 7173-51-5 8.00 0.00217000
Glutaraldehyde 111-30-8 27.00 0.00731000
Acid, Hydrochloric 15pct Schlumberger Acid Hydrochloric acid 7647-01-0 15.00 0.04
Water 7732-18-5 85.00 0.23
100 Mesh Sand Proppant Quartz 14808-60-7 100.00 1.19
SC30W X-Chem Scale Inhibitor Sodium polyacrylate 9003-04-7 100.00 0.00881000
Methanol 67-56-1 100.00 0.00881000
Sodium hydroxide 1310-73-2 100.00 0.00881000
Recycled Produced Water Carrier/Base Fluid 30.38

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 159,283.00 115 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 1,545,626.00 323 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 3,109,835.00 343 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 1,960,942.00 365 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 1,567,710.00 364 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,206,624.00 349 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 985,134.00 342 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 757,372.00 288 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 600.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 107.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,317.50 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 283.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 5,550.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC007
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,089.59 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 52.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 500.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 411.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 53.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 64.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 13.00 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 182.50 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.60 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 146.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 59.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 160.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865585 Primary Facility 2010-02-24 Routine/Complete Inspection No Violations Noted
1872826 Primary Facility 2010-03-24 Drilling/Alteration No Violations Noted nomac rig 247 @ 1492 ft deep drilling all ok.
1893677 Primary Facility 2010-06-01 Routine/Complete Inspection No Violations Noted
1940693 Primary Facility 2011-01-04 Routine/Complete Inspection No Violations Noted
1994976 Primary Facility 2011-08-09 Drilling/Alteration No Violations Noted Patterson 154. Rig moving on location for re-entry.
1996012 Primary Facility 2011-08-15 Drilling/Alteration No Violations Noted Currently at 4397. Set whipstock at 7340, plan on cutting window, will plug back and
2004896 Primary Facility 2011-09-15 Drilling/Alteration No Violations Noted drilling at 13,315
2006539 Primary Facility 2011-09-28 Routine/Complete Inspection No Violations Noted
2018490 Primary Facility 2011-11-10 Routine/Complete Inspection No Violations Noted
2028367 Primary Facility 2011-12-20 Routine/Complete Inspection No Violations Noted
2074616 Primary Facility 2012-06-07 Routine/Complete Inspection No Violations Noted
2196638 Primary Facility 2013-08-19 Routine/Complete Inspection No Violations Noted
2219657 Primary Facility 2013-10-17 Routine/Complete Inspection No Violations Noted
2255769 Primary Facility 2014-03-21 Routine/Complete Inspection No Violations Noted
2367838 Primary Facility 2015-02-22 Complaint Inspection No Violations Noted The complainant alleged that stormwater from the site was impacting her property. CHK agreed to amend the major modification for PCSM (already inhouse) to address this issue. The adjacent pipeline operator (Williams) also agreed to make corrections to the stormwater conveyance.
2426109 Primary Facility 2015-11-18 Routine/Complete Inspection No Violations Noted Arrived @ 13:49. Weather cloudy, cold and windy. There were 2 completed gas wells: Yengo 1H and Yengo 2H. There was also a plugged conductor-only well: the Yengo Sul 5H, and an additional 3 water-filled cellars.
2443197 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted
2542562 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.

Permanent vegetation has been established over most of the site, though extremely rocky areas are not vegetated. Post-construction stormwater management (PCSM) BMPs have been installed; filter sock and temporary stabilization were in place in the PCSM areas. No evidence of accelerated erosion or sedimentation was observed.

A request for an extension of time for site restoration was filed with the Department on May 17, 2016. To date, this extension has not been approved.

No violations were cited during this inspection.

2559430 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted Arrived @ 13:40. Weather cold with snow. This was a 6-slot set up with 2 wells in production.

There were no personnel on site at the time of my inspection. Yengo 2H, frozen cellar Top gauge: 821 psi, Yengo E Sul 1H, water in cellar Top gauge: 867 psi. There were no violations observed at the time of my inspection. Left @ 14:00

2675086 Primary Facility 2017-12-27 Routine/Complete Inspection No Violations Noted Two Wells in production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted.
2763532 Primary Facility 2018-08-14 Site Restoration No Violations Noted Two wells staged for production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted.

The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 8/8/2018. Based on this inspection report the Post Drilling Restoration report was accepted on 5/14/2018.

For data sources see[8]

References