37-113-20122

Well Details

Well ID: 37-113-20122
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Cherry Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 147987
Farm/Lease Name: CONNELL SUL 2H
License Status: INACTIVE
Spud Date: 2011-10-28
Permit Date: 2011-09-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.522339
Longitude: -76.370442

For data sources see[1][2][3]

Well History

Date Event
2011-09-29 New Permit Application
2011-10-26 Performed Spud Operation
2011-12-05 Drilling Completion
2012-03-08 DEVIATED
2013-09-30 Perforation
2018-08-29 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-05 2013-10-19 8,049 5,077,630 232,874

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.2653 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 18.4913 0
Northern White Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 11.9639 0
SFR-470 X CHEM Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.00411 0
Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 5 0.00059 0
Quaternary Ammonium Chloride (Ammonium Chloride) 012125-02-9 15 0.00176 0
Ethoxylated Alcohol 068439-50-9 5 0.00059 0
Alcohols ethoxylated C12-16 068551-12-2 5 0.00059 0
SC30 X CHEM Scale Inhibitor Sodium Polyacrylate 009003-04-7 100 0.00892 0
B84 X CHEM Anti-Bacterial Agent Ethanol 000064-17-5 4 0.00108 0
Quaternary Ammonium Compound 068424-85-1 6 0.00149 0
Didecyl Dimethyl Ammonium Chloride 007173-51-5 8 0.00217 0
Glutaraldehyde (Pentanediol) 000111-30-8 27 0.00731 0
Plexbreak 145 PUMPCO Non-Emulsifier Coconut oil, Diethanolamide 068603-42-9 10 0.00006000 0
Water 007732-18-5 65 0.00041 0
Diethanolamine 000111-42-2 2 0.00001000 0
Methanol (Methyl Alcohol) 000067-56-1 15 0.00009000 0
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) 000111-76-2 15 0.00009000 0
Acid HCL PUMPCO Acid Water 007732-18-5 85 0.3204 0
Hydrochloric Acid 007647-01-0 15 0.05654 0
Ferriplex 40 PUMPCO Iron Control Agent Trisodium Nitrilotriacetate 005064-31-3 40 0.0009 0
Water 007732-18-5 60 0.00135 0
Sodium Hydroxide 001310-73-2 1 0.00002000 0
Sodium Sulfate 007757-82-6 2 0.00005000 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 67.7665 0
SFR-451 X CHEM Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.0297 0
Ammonium Acetate 000631-61-8 6 0.00509 0
B84, SC30, SFR-451, SFR-470 X CHEM Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor Alcohols ethoxylated C12-16 068551-12-2 0 0.07823 0
Sorbitol Tetraoleate 061723-83-9 0 0.00946 0
Polypropenamide 910644-97-2 0 0.07823 0
Sorbitan Monooleate 001338-43-8 0 0.0877 0
Ethoxylated Alcohol 068439-50-9 0 0.07823 0
Proprietary Surfactant TRADE SECRET 0 0.0877 0
Ethoxylated Oleylamine 026635-93-8 0 0.07823 0
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) 026100-47-0 0 0.00946 0
Polyethylene Glycol Monooleate 009004-96-0 0 0.00946 0
Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 0 0.07823 0
Water 007732-18-5 0 0.12918 0
Alcohols, C12-C14-Secondary, Ethoxylated 084133-50-6 0 0.00946 0
Plexhib 256 PUMPCO Corrosion Inhibitor Modified Thiourea Polymer 068527-49-1 30 0.00017 0
Ethoxylated Alcohols^ C14-15 068951-67-7 30 0.00017 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00034 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00006000 0
Alkenes^ C>10 alpha- 064743-02-8 5 0.00003000 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 560,939.00 49 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 4,293,181.00 365 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 3,023,693.00 365 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 2,217,745.00 347 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,688,217.00 331 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,901,503.00 341 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 1,913,464.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 340.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,837.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 569.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 9,498.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracturing Fluid Waste 29.46 Tons LANDFILL THR029
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,542.45 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 554.65 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 641.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 267.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 110.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2001297 Primary Facility 2011-09-06 Routine/Complete Inspection Violation(s) Noted Newly completed pad, inspected at the start of heavy rains
2006521 Primary Facility 2011-09-28 Follow-up Inspection No Violations Noted
2028369 Primary Facility 2011-12-20 Routine/Complete Inspection No Violations Noted
2184618 Primary Facility 2013-07-17 Routine/Complete Inspection No Violations Noted
2379134 Primary Facility 2015-06-12 Routine/Complete Inspection No Violations Noted Arrived on site at 12:45 and departed at 13:00. Weather conditions were sunny and ~85°F. No Chesapeake representatives were present during the inspection.
2493714 Primary Facility 2016-06-16 Routine/Complete Inspection No Violations Noted Overall vegetative cover was greater than 70% perennial vegetation. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

According to the Department's records, the Erosion and Sediment Control General Permit for the site expired on 07/29/2015, and no current well permits exist. A 2-year extension of time for site restoration was granted on 02/24/2016. As part of that approval, post-construction stormwater management (PCSM) features were to be installed by 05/24/2016, unless additional time is requested and approved by the Department. At the time of inspection, no PCSM features have been installed, and no staking or other preparations that would indicate imminent construction were observed. In order to remain in compliance with the 2-year extension of time and Title 58 Pa.C.S. § 3216 (2012 Oil and Gas Act), relating to site restoration, additional time to install the PCSM measures should be requested.

No violations were noted duri

2559328 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted : Arrived @ 13:00. Weather cold, snow. There is one producing well on a 6 slot set-up.

Connell Sul 2H Water and ice in cellar, no bubbling. 13-3/8” x 9-5/8” shut to the dump line, gas check vent – no combustible gas detected Top gaugue: 818 psi (digital) Left @ 13:20.

2560102 Primary Facility 2017-02-08 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions. No Chesapeake representatives were present.

Overall vegetative cover was greater than 70% perennial vegetation. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

According to the Department's records, the Erosion and Sediment Control General Permit for the site expired on 07/29/2015, and no current well permits exist. A 2-year extension of time for site restoration was granted on 02/24/2016. As part of that approval, post-construction stormwater management (PCSM) features were to be installed by 05/24/2016, unless additional time is requested and approved by the Department. At the time of inspection, no PCSM features have been installed, and no staking or other preparations that would indicate imminent construction were observed. In order to remain in compliance with the 2-year extension of time and Title 58 Pa.C.S. § 3216 (2012 Oil and Gas Act), relating to site restoratio

2583163 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted One well in production phase. One each sand and water separator. No leaks detected from production equipment. Site stable. No violations noted.
2680284 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted Arrived at 1418. Weather: sunny with clouds. One producing well on site on a six slot set up.

Top gauge: 773.98 psi (digital) 5 1/2: 1165.1 psi 9 5/8 x 5 1/2: -2.95 psi 13 3/8 x 9 5/8: open to dump line, 2.16 psi. No violations were observed during this inspection.

2766060 Primary Facility 2018-08-22 Routine/Complete Inspection No Violations Noted One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2001297 619685 09/06/2011 2011-09-06 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative Slopes were not stabilized within 4 days of cessation of earth disturbance activites. Particularly western slope back of the pad.
2001297 619689 09/06/2011 2011-09-06 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Slopes were hydroseeded at the same time. Heavy rain washed out the slopes.
2001297 619690 09/06/2011 2011-09-06 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Slopes were hydroseeded at the same time. Heavy rain washed out the slopes.

For data sources see[8]