Well ID: 37-113-20288 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.552019,"lon":-76.737253,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Fox Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: M&M ESTATES SUL 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.552019 | |
Longitude: -76.737253 |
Date | Event |
---|---|
2014-06-03 | New Permit Application |
2015-05-22 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2453201 | Primary Facility | 2016-02-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.
Vegetative cover on site is greater than 70%, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection. |
2502452 | Primary Facility | 2016-07-15 | Routine/Partial Inspection | No Violations Noted | Partial inspection conducted to determine the status of the post construction stormwater management (PCSM) BMPs required by approval of extension of time for site restoration.
The extension of time for site restoration (approved 02/2016), required that the PCSM BMPs be installed within three months. The approved PCSM BMPs have been constructed as approved. Temporary stabilization and erosion and sediment control BMPs are in place. No violations were cited during this inspection. |