Well Details

Well ID: 37-115-20170
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148385
Farm/Lease Name: G SHIELDS 5H NW
License Status:
Spud Date:
Permit Date: 2009-05-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.712797
Longitude: -75.946714

For data sources see[1][2][3]

Well History

Date Event
2009-05-06 New Permit Application
2009-08-14 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 2,280,626.50 211 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,603,545.70 354 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 1,102,222.24 361 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 676,074.08 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 710,796.67 344 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 375,802.94 320 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 589,012.76 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 539,922.79 361 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 396,519.00 302 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 365,029.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CABOT OIL & GAS CORP Drilling 1,500.00 Bbl Brine or Industrial Waste Treatment Plt PA0027057
2009 CABOT OIL & GAS CORP Drilling 3,630.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 957.00 Bbl Brine or Industrial Waste Treatment Plt PAR9000009
2010 CABOT OIL & GAS CORP Basic Sediment 2.59 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 65.80 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 217.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 271.10 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 18.60 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 1,815.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 CABOT OIL & GAS CORP Drill Cuttings 107.00 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 130.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.40 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 478.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD085690592
2010 CABOT OIL & GAS CORP Drill Cuttings 107.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 750.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drill Cuttings 4.03 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Basic Sediment 1.30 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Produced Fluid 299.71 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 54.57 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 0.37 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2012 CABOT OIL & GAS CORP Basic Sediment 1.02 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 0.40 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 0.81 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 181.83 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 52.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 7.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 109.31 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 274.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 5.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 89.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 79.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 75.93 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 124.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 63.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 30.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 79.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 107.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1851918 Primary Facility 2009-11-12 Routine/Complete Inspection No Violations Noted
1860507 Primary Facility 2010-01-22 Drilling/Alteration No Violations Noted At time of inspection I met with Company Man Jesus Villasana. Depth of drilling was at 7982¿. BOP¿s were in place and tested. Tophole down to kickoff point was predrilled. Pioneer is the drilling contractor on site. During the site walk I observed a large tear in the reserve pit liner which limited the available freeboard to approximately 3¿. I notified the Company man of the tear. I also observed a portion of the liner located underneath the boiler unit was melted through, exposing the bare ground below. I showed this to the Company Man and discussed installing some type of protective shield underneath the pipes to prevent future melting of the liner in this area. It was also noted that the crew was cleaning up a substantial amount of drilling mud from a hose failure located near the boiler unit. Based on my inspection, the drilling mud was contained on plastic, and not spilled onto the pad. The crew was in the process of cleaning the mud with squeegees and a vac-truck.
1890400 Primary Facility 2010-05-24 Routine/Complete Inspection No Violations Noted
2405549 Primary Facility 2015-09-09 Routine/Complete Inspection No Violations Noted
2496280 Primary Facility 2016-06-27 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:35a.m., the cellar was about a quarter full of water with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was 576psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 11:10a.m.

2691062 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted The Well Site Restoration Report required by 78.65 was accepted. No violations were noted. If you have any questions, please contact me.
2705254 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted Arrived at location at 08 30. Weather: Overcast, cold, ~ 25 degs. (2) wells were present on location, the Shields, G. 1V and 5H. Both wells were producing at time of inspection. Both wells production pressures were being monitored by remote monitors sending data to Total Flow Control Units "TFCU"s with LED readouts located by production units. Each well had (1) annular vent plumbed to a shared poly vent tank. The 1V wells annular vent was labeled (9 5/8" x 4 1/2") and the 5H wells annular vent was labeled (9 5/8" x 5 1/2"). Both wells annular vents were open and venting to vent tank. A gas check performed at the shared vent tank opening showed: 100% LEL, 100% CH4. Gas check performed 3' away from vent tank showed 0% LEL, 0% CH4.

- Review of well history showed that previous 72 hr. pressure build up tests "PBUT" had been performed on these wells on (10/29 - 11/1/11) and (12/28 - 12/31/11). The initial PBUT showed the 1V, (9x4) press. build to 550 psi. and the 5H, (9x5) built to 8 psi. Subsequently, Cabot perf

2709962 Primary Facility 2018-03-19 Routine/Complete Inspection No Violations Noted Arrived at location at 08:45. Weather: Clear, cold, ~ 30 degs. (2) wells were present on location, the Shields, G. 1V and 5H. Both wells were producing at time of inspection. Onsite to witness start of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. Upon arrival met with Cabot O&G Reps., Adam Vogt, Aaron Onks, Brody Webster and Steve Catalfamo onsite. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. Adam confirmed communication with loggers through cynet system. These annuli were shut in at 09:00. We will return to site on Thursday, March 22 at 09:00 for conclusion of the 72 hr. PBUT.

Wells pressures were taken off LED readouts mounted at production units. (Prod. Casing Press. = CP, Static Press. = SP, Differential Press. = DP.) Shields, G. 1V: CP = 466.8 psi., SP = 491.4 psi., DP = 9.0 psi. Shields, G. 5H: CP = 490.7 psi., SP = 493.8 psi., DP = 61.8 psi.

No obvious c

2709998 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted Arrived at location at 09:00. Weather: Clear, cold, ~ 30 degs. Onsite for the conclusion of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. The PBUT was started on 3/19/18 at 09:00. Upon arrival met with Cabot O&G Reps., Adam Vogt & Aaron Onks and (3) Selman & Assoc. Reps. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. The PBUT ending pressures were:

- 1V: (9 5/8"x 4 1/2") = 212 psi. - 5H: (9 5/8"x 5 1/2") = 42 psi. Gas checks performed by the Dept. and Selman showed: 100% CH4. The Dept. and Selman collected gas samples off both these annuli at approx. 09:30. Both wells annuli were bleed down and opened back up to poly vent tank. Post PBUT, water samples were collected at area resident by Eric Rooney, D.E.P. Geologist and Moody & Associates prior to bleeding pressures off of gas wells. - Review of well record for the 5H well showed the 5 1/2" prod. casing cement top wa