X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20178

Well Details

Well ID: 37-115-20178
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147684
Farm/Lease Name: A HUNSINGER 3H NW
License Status:
Spud Date:
Permit Date: 2009-06-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.733761
Longitude: -75.940618

For data sources see[1][2][3]

Well History

Date Event
2009-06-24 New Permit Application
2009-07-23 Performed Spud Operation
2009-10-11 Drilling Completion
2010-02-25 Perforation
2010-02-25 Performed Stimulation
2010-10-01 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-02-25 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 617,110.50 220 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 646,234.06 347 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 537,686.89 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 387,278.42 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 410,891.89 328 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 252,024.80 362 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 303,542.39 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 252,903.76 362 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 234,880.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 216,268.00 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 2.59 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 61.70 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 207.10 Tons LANDFILL THR029
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 203.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 489.22 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 17.50 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 100.40 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 122.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.30 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drill Cuttings 100.40 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 2,928.57 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drill Cuttings 855.29 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Basic Sediment 2.38 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 198.02 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 344.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 461.37 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 590.36 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 571.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000524041
2011 CABOT OIL & GAS CORP Basic Sediment 0.63 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 0.37 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 1.63 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 1.66 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 12.98 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Produced Fluid 315.21 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 141.45 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 29.81 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 247.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 5.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 161.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 134.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 114.54 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.70 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 141.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 0.93 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 91.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 102.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 97.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 213.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1841120 Primary Facility 2009-10-08 Drilling/Alteration No Violations Noted At time of inspection, I met with Scott Cheeseman (Company Man). Rig on site is Patterson ¿UTI Rig 252. Depth of drilling was at TD -9167¿. Operator installing 5-1/2¿ production casing. At time of inspection, Operator was reaming and cleaning out the hole in order to run packers. Once production string is in place, a service rig is planned to come on site and cement section of hole between packers and surface casing.
1851909 Primary Facility 2009-11-12 Routine/Complete Inspection No Violations Noted
1851919 Primary Facility 2009-11-12 Routine/Complete Inspection No Violations Noted
1866293 Primary Facility 2010-02-25 Routine/Complete Inspection No Violations Noted
1890393 Primary Facility 2010-05-24 Routine/Complete Inspection No Violations Noted
1902092 Primary Facility 2010-07-27 Follow-up Inspection No Violations Noted
1964141 Primary Facility 2011-03-28 Follow-up Inspection No Violations Noted
1964142 Primary Facility 2011-04-01 Follow-up Inspection No Violations Noted
1966868 Primary Facility 2011-04-06 Follow-up Inspection Violation(s) Noted
1972961 Primary Facility 2011-05-12 Follow-up Inspection Outstanding Violations - No Viols Req'd
2394110 Primary Facility 2015-07-30 Routine/Complete Inspection No Violations Noted
2440387 Primary Facility 2015-12-22 Site Restoration No Violations Noted Inspection of the Hunsinger A P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
2487580 Primary Facility 2016-05-19 Routine/Partial Inspection No Violations Noted

The Department was on site at the A Hunsinger 1&3 Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that a Post Rain Event Inspection was completed on 5/13/16 by Sam Wiernusz (TEC). During the course of the inspection, it was noted that there are two areas that do not meet temporary stabilization requirements. One of the areas appears to have been used by the landowner. Operator, please review these areas and make any necessary changes. Also, a tracked road was noted to have been originating from the site. This appears to have been created by the landowner to access their property.

2496258 Primary Facility 2016-06-22 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:50a.m., the cellar was full of water with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was 561psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 10:35a.m.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1966868 609179 04/06/2011 2011-04-06 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1966868 609180 04/06/2011 2011-04-06 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative

For data sources see[8]

References