If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-115-20178 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.733761,"lon":-75.940618,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Dimock Township | |
| Operator Name: CABOT OIL & GAS CORP | |
| Well Pad ID: 147684 | |
| Farm/Lease Name: A HUNSINGER 3H NW | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2009-06-24 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.733761 | |
| Longitude: -75.940618 |
| Date | Event |
|---|---|
| 2009-06-24 | New Permit Application |
| 2009-07-23 | Performed Spud Operation |
| 2009-10-11 | Drilling Completion |
| 2010-02-25 | Perforation |
| 2010-02-25 | Performed Stimulation |
| 2010-10-01 | DEVIATED |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2010-02-25 | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | CABOT OIL & GAS CORP | 617,110.50 | 220 | 0.00 | 0 | 0.00 | 0 |
| 2011 | CABOT OIL & GAS CORP | 646,234.06 | 347 | 0.00 | 0 | 0.00 | 0 |
| 2012 | CABOT OIL & GAS CORP | 537,686.89 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2013 | CABOT OIL & GAS CORP | 387,278.42 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | CABOT OIL & GAS CORP | 410,891.89 | 328 | 0.00 | 0 | 0.00 | 0 |
| 2015 | CABOT OIL & GAS CORP | 252,024.80 | 362 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CABOT OIL & GAS CORP | 303,542.39 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | CABOT OIL & GAS CORP | 252,903.76 | 362 | 0.00 | 0 | 0.00 | 0 |
| 2018 | CABOT OIL & GAS CORP | 234,880.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | CABOT OIL & GAS CORP | 216,268.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.59 Bbl | LANDFILL | 101534 |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 61.70 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 207.10 Tons | LANDFILL | THR029 |
| 2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 203.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2010 | CABOT OIL & GAS CORP | Produced Fluid | 489.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 17.50 Tons | LANDFILL | NY # 50S08 |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 100.40 Tons | LANDFILL | NY # 02S17 |
| 2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 122.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.30 Tons | LANDFILL | 100955 |
| 2010 | CABOT OIL & GAS CORP | Drill Cuttings | 100.40 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
| 2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 2,928.57 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2011 | CABOT OIL & GAS CORP | Drill Cuttings | 855.29 Tons | LANDFILL | 101247 |
| 2011 | CABOT OIL & GAS CORP | Basic Sediment | 2.38 Bbl | LANDFILL | 101534 |
| 2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 198.02 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
| 2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 344.01 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2011 | CABOT OIL & GAS CORP | Produced Fluid | 461.37 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2011 | CABOT OIL & GAS CORP | Drill Cuttings | 590.36 Tons | LANDFILL | THR029 |
| 2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 571.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000524041 |
| 2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.63 Bbl | LANDFILL | 100081 |
| 2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.37 Bbl | LANDFILL | THR029 |
| 2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.63 Bbl | LANDFILL | 100081 |
| 2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.66 Bbl | LANDFILL | 101534 |
| 2012 | CABOT OIL & GAS CORP | Produced Fluid | 12.98 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
| 2012 | CABOT OIL & GAS CORP | Produced Fluid | 315.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013 | CABOT OIL & GAS CORP | Produced Fluid | 141.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2013 | CABOT OIL & GAS CORP | Produced Fluid | 29.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
| 2014 | CABOT OIL & GAS CORP | Produced Fluid | 247.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2014 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
| 2015 | CABOT OIL & GAS CORP | Produced Fluid | 161.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
| 2016 | CABOT OIL & GAS CORP | Produced Fluid | 134.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2016 | CABOT OIL & GAS CORP | Produced Fluid | 114.54 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 0.70 Tons | REUSE (AT WELL PAD) | |
| 2017 | CABOT OIL & GAS CORP | Produced Fluid | 141.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.93 Tons | LANDFILL | 101247 |
| 2017 | CABOT OIL & GAS CORP | Produced Fluid | 91.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
| 2018 | CABOT OIL & GAS CORP | Produced Fluid | 102.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2018 | CABOT OIL & GAS CORP | Produced Fluid | 97.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
| 2019 | CABOT OIL & GAS CORP | Produced Fluid | 213.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1841120 | Primary Facility | 2009-10-08 | Drilling/Alteration | No Violations Noted | At time of inspection, I met with Scott Cheeseman (Company Man). Rig on site is Patterson ¿UTI Rig 252. Depth of drilling was at TD -9167¿. Operator installing 5-1/2¿ production casing. At time of inspection, Operator was reaming and cleaning out the hole in order to run packers. Once production string is in place, a service rig is planned to come on site and cement section of hole between packers and surface casing. |
| 1851909 | Primary Facility | 2009-11-12 | Routine/Complete Inspection | No Violations Noted | |
| 1851919 | Primary Facility | 2009-11-12 | Routine/Complete Inspection | No Violations Noted | |
| 1866293 | Primary Facility | 2010-02-25 | Routine/Complete Inspection | No Violations Noted | |
| 1890393 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | |
| 1902092 | Primary Facility | 2010-07-27 | Follow-up Inspection | No Violations Noted | |
| 1964141 | Primary Facility | 2011-03-28 | Follow-up Inspection | No Violations Noted | |
| 1964142 | Primary Facility | 2011-04-01 | Follow-up Inspection | No Violations Noted | |
| 1966868 | Primary Facility | 2011-04-06 | Follow-up Inspection | Violation(s) Noted | |
| 1972961 | Primary Facility | 2011-05-12 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
| 2394110 | Primary Facility | 2015-07-30 | Routine/Complete Inspection | No Violations Noted | |
| 2440387 | Primary Facility | 2015-12-22 | Site Restoration | No Violations Noted | Inspection of the Hunsinger A P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
| 2487580 | Primary Facility | 2016-05-19 | Routine/Partial Inspection | No Violations Noted |
The Department was on site at the A Hunsinger 1&3 Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that a Post Rain Event Inspection was completed on 5/13/16 by Sam Wiernusz (TEC). During the course of the inspection, it was noted that there are two areas that do not meet temporary stabilization requirements. One of the areas appears to have been used by the landowner. Operator, please review these areas and make any necessary changes. Also, a tracked road was noted to have been originating from the site. This appears to have been created by the landowner to access their property. |
| 2496258 | Primary Facility | 2016-06-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:50a.m., the cellar was full of water with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was 561psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 10:35a.m. |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 1966868 | 609179 | 04/06/2011 | 2011-04-06 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
| 1966868 | 609180 | 04/06/2011 | 2011-04-06 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative |
For data sources see[8]