If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20215 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.733506,"lon":-76.083233,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 144557 | |
Farm/Lease Name: JAYNE 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.733506 | |
Longitude: -76.083233 |
Date | Event |
---|---|
2009-09-16 | New Permit Application |
2009-11-13 | Performed Spud Operation |
2009-12-02 | Drilling Completion |
2010-06-07 | Perforation |
2010-06-07 | Performed Stimulation |
2011-01-21 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-06-07 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHESAPEAKE APPALACHIA LLC | 1,443,034.50 | 184 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 2,169,848.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 866,120.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 558,788.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 585,340.00 | 340 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 279,329.00 | 297 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 435,745.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 344,144.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 251,238.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 719,732.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 2,956.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 488.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 74.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3,025.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 672.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 17.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 382.49 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 62.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 72.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 34.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 38.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 66.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 87.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 65.40 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 1.00 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 31.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 115.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 61.67 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 0.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1845232 | Primary Facility | 2009-11-16 | Drilling/Alteration | No Violations Noted | At time of inspection I met with Roy Funck (Company Man). In process of nippling up to drill the lateral portion of the well. The conductor and surface casings were previously set. The vertical portion of the hole was drilled and left open to 6100¿. |
1849780 | Primary Facility | 2009-12-11 | Drilling/Alteration | No Violations Noted | At time of inspection, drilling was complete. Production string is set at 11,954 and cemented. Cement was run to approximately 2000¿ above curve to a depth of 4000¿. Surface casing was installed to 1025¿. Floats held during cement job and had good returns to the pit. |
2688662 | Primary Facility | 2018-01-29 | Routine/Complete Inspection | No Violations Noted | I inspected the Jayne SUS well pad on January 29, 2018. The pad surface was slightly soft. The access road was stable and solid. The cut slope and fill slope were adequately vegetated and stable, although past repairs of the cut slope are evident. There did not appear to be any bubbling of the well cellars and the wells associated with this site were properly labeled. The wells associated with this site are the 115-20872, 115-20209 and the 115-20215.
There were no erosional issues apparent. There were no violations noted. |
For data sources see[8]