If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20481 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.682514,"lon":-75.936428,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148593 | |
Farm/Lease Name: J LYMAN 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.682514 | |
Longitude: -75.936428 |
Date | Event |
---|---|
2010-12-20 | New Permit Application |
2011-05-17 | Performed Spud Operation |
2011-06-18 | Drilling Completion |
2011-11-01 | DEVIATED |
2012-07-04 | Perforation |
2012-08-03 | Performed Stimulation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-08-02 | 2012-08-02 | 7,411 | 3,900,960 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Carrier/Base Fluid | 100.00 | 88.20 | ||||
PA Specific 40/70 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Quartz | 14808-60-7 | 99.90 | 10.20 | ||
Ferric oxide | 1309-37-1 | 0.10 | 0.01 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.01 | |||||
Alumina | 1344-28-1 | 1.10 | 0.11 | |||||
Acid Inhibitor 2 (AI-2) | Superior Well Services | Acid Corrosion Inhibitor | Isopropanol | 67-63-0 | 15.00 | 0.00015100 | ||
Glycol Ethers | 20.00 | 0.00020100 | ||||||
Propargyl alcohol | 107-19-7 | 20.00 | 0.00020100 | |||||
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-
, |
68412-54-4 | 13.00 | 0.00013100 | |||||
Water | 7732-18-5 | 40.00 | 0.00040200 | |||||
Tar bases, quinoline derivatives, benzyl chloride-quaternized |
72480-70-7 | 10.00 | 0.00010100 | |||||
PA Specific 100 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Alumina | 1344-28-1 | 1.10 | 0.00674500 | ||
Titanium dioxide | 13463-67-7 | 0.10 | 0.00061300 | |||||
Quartz | 14808-60-7 | 99.90 | 0.61 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.00061300 | |||||
Super TSC LT | Superior Well Services | Paraffin & Scale Additive | Proprietary | 15.00 | ||||
Proprietary | 15.00 | 0.00371500 | ||||||
0.00371500 | ||||||||
Water | 7732-18-5 | 60.00 | 0.01 | |||||
Proprietary | 50.00 | 0.01 | ||||||
KR-153SL | Superior Well Services | Biocide | Water | 7732-18-5 | 80.00 | 0.02 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00535800 | |||||
Iron Acid 10M (12.6-18.0) | Superior Well Services | Acid Blend | Water | 7732-18-5 | 84.10 | 0.50 | ||
Hydrochloric acid | 7647-01-0 | 15.80 | 0.09 | |||||
Proprietary | 1.20 | 0.00718100 | ||||||
WFR-3B | Superior Well Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.04 | ||
Water | 7732-18-5 | 40.00 | 0.03 | |||||
Microparticle | 1.00 | 0.00097100 | ||||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 15.00 | 0.01 | |||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.03 | |||||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00485700 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-08-03 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 585,511.07 | 61 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 2,200,512.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,357,943.42 | 359 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 858,163.64 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 804,962.15 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 621,345.50 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 474,858.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 349,723.00 | 261 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,466.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 3.61 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 124.31 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,215.62 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 186.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 2.27 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 51.49 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 3.58 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 30.00 Tons | LANDFILL | 101571 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 2,057.95 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 17.62 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 1.87 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 8,546.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 17.08 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 8.04 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 991.47 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 796.76 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 320.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 455.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 857.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 177.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 290.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 130.84 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 156.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 97.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 10.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 155.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 2,096.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.44 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 50.49 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1972126 | Primary Facility | 2011-05-04 | Routine/Complete Inspection | No Violations Noted | |
1976369 | Primary Facility | 2011-05-27 | Follow-up Inspection | Violation(s) Noted | |
1979653 | Primary Facility | 2011-06-09 | Drilling/Alteration | No Violations Noted | Patterson 252. Depth at 9364. Encountered 4034 U of gas and took a kick. Shut in and closed choke at 5:26 am. Monitored pressure. Initial SIP - 400 psi on casing. Stabilized at 1100 psi. Weighted up water-based mud to 12.9 ppg. Pumped down drill pipe and bled off casing to work gas bubble to surface. No spills or loss of fluids reported. Continuing to circulate and stabilize mud wt. before resuming drilling. TD proposed is 10400'. 13 3/8" set at 540. 9 5/8" set at 1322. Had 32 and 15 bbl cement returns , respectively. Gas increased to @ 6500 u. |
1984083 | Primary Facility | 2011-06-27 | Drilling/Alteration | Violation(s) Noted | |
2028186 | Primary Facility | 2011-12-08 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Violations previously cited for improper well construction. Barton chart recorder connected to one of the casing's annular space. (not conclusive which one). It appeared the chart was reading @ 30 psi and was on day 1 of recording. Well is shut in and has not been fracced yet. Cellar full of fluid - no bubbling observed. Vents open. 2" flex hoses vented to poly tanks. |
2041362 | Primary Facility | 2012-02-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection. DEP on site 14:45. Well is shut in. All vents are open. No activity on site at time of inspection. Site ID sign in place. Proper permit # posted. Well tag present. |
2056706 | Primary Facility | 2012-04-02 | Drilling/Alteration | No Violations Noted | Service rig moving on setting up for remidiation work |
2058799 | Primary Facility | 2012-04-11 | Drilling/Alteration | No Violations Noted | Co.Man - Ronnie Wright. SErvice rig on well- rigging up. Tagged bottom at 9887'....however TD of well is 10383'. Possible cement plug at bottom of well. Planning to send bit down hole and drill out to bottom. No pressure on well when arrived. Have annulus vented to poly tank. At this point plan for remediation no determined. Remediation being done involved adding cement. When well drilled - long string was cemented with no centralizers. |
2074511 | Primary Facility | 2012-06-06 | Drilling/Alteration | No Violations Noted | Stone service rig on site. Opened up well - pressure was 0. Plan is to run in hole and drill out squeeze cement. Clean out to 6000'. Run CBL across squeeze interval. Set patch across squeeze perf's. Run caliper log to determine proper placement of patch. Presure test patch to 9500 psi. Currently rigging up. No violations observed at this time. |
2089460 | Primary Facility | 2012-08-04 | Drilling/Alteration | No Violations Noted | while frcking second stage top hole pressures were accomplished rating 9,600# down hole |
2095401 | Primary Facility | 2012-08-13 | Drilling/Alteration | No Violations Noted | |
2097278 | Primary Facility | 2012-09-04 | Drilling/Alteration | No Violations Noted | pressure test 5000# for 25 min test graph sent to file |
2099625 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | At the time of arrival - crew on site. Service Rig over well. In the process of setting cement retainer. Once set, will cement over affected section of casing. Operator will Keep DEP updated on progress of work. Secondary containment in place and in good condition. No violations observed at time of inspection. |
2099654 | Primary Facility | 2012-09-06 | Drilling/Alteration | No Violations Noted | Follow up on status of well. Drilling plugs currently. Have 2 plugs drilled out. 10 left to be drilled. Once complete will flow back well. Requested to install gauge on backside when begin flowing back. Currently annulus vented to poly tank. No evidence of gas or pressure. Expect to be done drilling out plugs next week. No violations observed. |
2113777 | Primary Facility | 2012-11-06 | Follow-up Inspection | No Violations Noted | |
2250584 | Primary Facility | 2014-02-22 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1976369 | 612272 | 05/27/2011 | 2011-05-27 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | See Insp ID 2113777. |
1976369 | 612273 | 05/27/2011 | 2011-05-27 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | See Insp ID 2113777. |
1984083 | 614425 | 06/27/2011 | 2011-06-27 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | See Insp ID 2074511 6/6/12, remediated gas well. violation cited for 78.83 (c) (c)..production ran with no centralizers. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
614425 | 272877 | NOV - Notice of Violation | Administrative Close Out | 2012-06-06 |
For data sources see[9]