37-115-20841

Well Details

Well ID: 37-115-20841
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: BKV OPR LLC
Well Pad ID: 145321
Farm/Lease Name: FRYSTAK CENTRAL 4H
License Status: INACTIVE
Spud Date:
Permit Date: 2011-12-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.866172
Longitude: -75.919681

For data sources see[1][2][3]

Well History

Date Event
2011-12-16 New Permit Application
2012-01-05 Performed Spud Operation
2012-05-10 New Permit Application
2012-12-09 Drilling Completion
2015-04-07 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2019 BKV OPR LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 471.28 Tons LANDFILL 301626
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 270.26 Tons LANDFILL THR029
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 209.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 70.37 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2018 BKV OPR LLC Synthetic Liner Materials 1.25 Tons LANDFILL 101247

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2125247 Primary Facility 2012-12-05 Drilling/Alteration No Violations Noted Nabors Rig M61. Drilling ahead 8 1/2" hole @ 8194'. Walked site with Co. Man. Secondary containment in place and in good condition. Solids handling area appears clean. Using pug mill to process cuttings. No violations observed at this time. Cement reports for 13 3/8" and 9 5/8" show good returns on both jobs. No violations observed.
2344172 Primary Facility 2015-02-13 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:
2352801 Primary Facility 2015-02-02 Routine/Complete Inspection No Violations Noted Performed inspection for inactive status. Well is a natural gas well with a TD of 11675. The casing lengths and depths are documented on hard copy inspection form. The well is currently shut-in with gauges on all annuli reading 0 psi. The cellar is frozen with ice and several inches of snow. No visible bubbling witnessed. Carrizo is awaiting Regional Infrastructure and plan to put the well into production on or around 2/2020. Inactive status submitted for approval. Approval granted 2/25/2015.
2352803 Primary Facility 2015-02-02 Routine/Complete Inspection No Violations Noted Performed inspection for inactive status. Well is a natural gas well with a TD of 11675. The casing lengths and depths are documented on hard copy inspection form. The well is currently shut-in with gauges on all annuli reading 0 psi. The cellar is frozen with ice and several inches of snow. No visible bubbling witnessed. Carrizo is awaiting Regional Infrastructure and plan to put the well into production on or around 2/2020. Inactive status submitted for approval. Approval granted 2/25/2015.
2369785 Primary Facility 2015-05-14 Routine/Complete Inspection No Violations Noted
2433854 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00 a.m., the cellar had water at the bottom, the (9x5) vent pipe was open and venting to a tank, there was about 460psi on the tree top. I took a walk around the location and everything looked OK.
2528481 Primary Facility 2016-10-13 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination Inspection of the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:

4H (115-20841)


The Frystak site had all temporary BMPs removed and complied with PCSM and Restoration Plan Option 1. The site was stable and well vegetated with no apparent erosional issues.

I recommend APPROVAL of this Notice of Termination for the Frystak Pad.

There were no violations.

If there are any issues please feel free to contact me.

2535789 Primary Facility 2016-11-10 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:15a.m., the cellar had water at the bottom with no bubbling noticed, the (9x5) vent pipe was open and venting into a tank. I took a walk around the location and there were no obvious concerns noticed.

The well was granted inactive status on 2/25/15. I left the site at 12:20p.m.

2568066 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted The Department arrived on site to conduct a Routine Complete Inspection. At the time of the inspection, I reviewed the Inspection Checklist. The checklist showed that the most recent inspection was conducted on December 9, 2016 by Bruce Bonnice. He indicated that the filter sock had been removed.
2624170 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:15a.m.

The cellar was full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. The valve on the production line and at the GPU were closed. The well is drilled to TD but hasn’t been stimulated. It was granted inactive status on 2/25/15. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:10a.m.

2732552 Primary Facility 2018-05-17 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was granted regulatory inactive status on 2/25/15. There was water 5' below grade in the cellar and there was no bubbling noticed, there was no gas detected in the remainder of the cellar. The well hasn't been stimulated but the Department received a pressure test notification on 3/29/18. There were three 500bbl tanks on containment and the containment appeared to be in good condition. The main valve on the production line was closed. I took a walk around the location and there were no obvious concerns noticed.

2784079 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site at 12:13 to conduct an inspection. The weather conditions are mostly cloudy skies, breezy, warm and humid with temperatures in the mid to upper 70's. Representing BKV at the site is Tom Mattern, Vice President of Operations and Dale Bennett, Site Safety Man. BKV consultants included Kevin Brady of Whitetail Environmental Services and Larry Gerard, Site Company Man. Halliburton is the BKV subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. BKV personnel provided me with following information regarding operations. “Wireline is on the 2H well. Frac is on the 3H well. Perforation casing is on the 2H well. Zipper frac is in progress. Frac operations started on 8/17/18. Frac operations on the 6H and 8H wells have been completed. The 5H and 7H wells were in production, but are currently are shut in. Frac on the 1H well is also in progress. The 4H well has been drilled to total depth but not yet stimulated. We are
2786940 Primary Facility 2018-09-11 Follow-up Inspection No Violations Noted I arrived at the site at 13:11. The weather conditions are mostly cloudy skies, calm winds, and humid with temps in the upper 60's to low 70's. I met with Jesse Bonnice, Senior Production Foreman of BKV, and Kevin Brady, Hydrologist, Environmental Scientist and Wetland Delineator of Whitetail Environmental Services, LLC. The main intent of the follow-up inspection is to evaluate the pad surface and secondary containment on the back side of the pad adjacent to site perimeter berm at the top of the fill slope, due to elevated specific conductance (conductivity) readings measured during the Department's 9/4/18 inspection. Refer to the Department's 9/4/18 inspection report, Inspection ID # 2782158 for additional details.

Frac operations have been recently completed. The next phase of operations to take place at the site is the drilling out of hydraulic fracturing plugs in the he recently stimulated wells, the Frystak 1H-3H, 6H and 8H wells. This will take place in the near future according to Mr. Bonnice

2808738 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At time of inspection.

There was water 1' below grade in the cellar and there was no bubbling noticed. The well was drilled to TD at 11,675' but hasn't been stimulated. It was granted regulatory inactive status on 2/25/15. There were twenty eight 500bbl tanks on containment from a recent frac of the 1H, 2H, 3H, 6H and 8H wells. I spoke with Nick Cona of (J P Reilly) and he said 8 of the tanks were being used for production fluid and the rest were empty. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]

References