X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20938

Well Details

Well ID: 37-115-20938
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: BKV OPR LLC
Well Pad ID: 145321
Farm/Lease Name: FRYSTAK EAST 7H
License Status:
Spud Date:
Permit Date: 2012-08-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.866331
Longitude: -75.919492

For data sources see[1][2][3]

Well History

Date Event
2012-08-16 New Permit Application
2012-09-20 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-20 2013-07-02 6,423 3,609,690 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Alpha 1427 Baker Hughes Biocide Glutaraldehyde 111-30-8 30 0.0065426 2262.75
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0021809 754.25
Quaternary Ammonium Compound 68424-85-1 5 0.0010904 377.125
Ethanol 64-17-5 5 0.0010904 377.125
Sand, White, 30/50 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 6.38433 2,208,000.0
Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 0.806137 278800
Sand, White, 40/70 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 4.89436 1,692,700.0
HCl, 5.1 - 7.5% Baker Hughes Acidizing Water 7732-18-5 92.5 0.620556 214617
Hydrochloric Acid 7647-01-0 7.5 0.0503154 17401.4
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0044755 1547.83
Calcium Chloride 10043-52-4 5 0.0007459 257.971
Other Chemicals Salt Trade Secret 0 0.0025988 898.791
Sodium Chloride 7647-14-5 0 0.00000450 1.5478
Modified Thiorea Polymer 68527-49-1 0 0.00004700 16.24
Sorbitan Monooleate Trade Secret 0 0.0025988 898.791
Poly (acrylamide-co-acrylic acid) Trade Secret 0 0.0155929 5392.75
Hydrochloric Acid 7647-01-0 0 0.00000670 2.32
Potassium Chloride 7447-40-7 0 0.00000750 2.5797
Polyacrylate Trade Secret 0 0.0029836 1031.89
Water 7732-18-5 0 0.0485376 16786.6
Formaldehyde 50-00-0 0 0.00000670 2.32
Ethoxylated Alcohol Trade Secret 0 0.0010395 359.516
Water Operator Carrier Water 7732-18-5 100 87.0237 30,096,900.0
Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60 0.00175 605.216
CI-14 Baker Hughes Corrosion Inhibitor Polyoxyalkylenes Trade Secret 30 0.0002012 69.6
Olefin Trade Secret 5 0.00003350 11.6
Fatty Acids Trade Secret 10 0.00006710 23.2
Propargyl Alcohol 107-19-7 5 0.00003350 11.6
Methanol 67-56-1 100 0.0006708 232
FRW-18 Baker Hughes Friction Reducer Petroleum Distillates 64742-47-8 30 0.0155929 5392.75
InFlo 250W Baker Hughes Surfactant Surfactants Trade Secret 80 0.0006172 213.448
Methanol 67-56-1 30 0.0002314 80.0429
2-Butoxyethanol 111-76-2 5 0.00003860 13.3405
HCl, 10.1 - 15% Baker Hughes Acidizing Water 7732-18-5 85 0.0950401 32869.3
Hydrochloric Acid 7647-01-0 15 0.0167718 5800.47

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 323,652.31 152 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 533,627.89 337 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 252,181.27 174 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 186,178.24 144 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 417,274.72 332 0.00 0 0.00 0
2018 BKV OPR LLC 202,867.93 231 0.00 0 0.00 0
2019 BKV OPR LLC 266,485.12 240 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 569.08 Tons LANDFILL 301626
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 5,302.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 554.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 19.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 214.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 31,600.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 4,445.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 275.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 386.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 137.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 850.49 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 2,061.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 398.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 47.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 201.97 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 121.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 179.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 135.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 951.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 214.20 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 653.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 347.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 10,051.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 BKV OPR LLC Waste Water Treatment Sludge 17.65 Tons LANDFILL 301358
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 158.99 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Filter Socks 0.36 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Synthetic Liner Materials 5.65 Tons LANDFILL 101247
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 5,901.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Other Oil & Gas Wastes 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Produced Fluid 195.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 BKV OPR LLC Produced Fluid 30.00 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 900.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Produced Fluid 2,449.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2107040 Primary Facility 2012-10-02 Drilling/Alteration No Violations Noted notified of no cement returns aftrer pumping 189 bbls.
2110052 Primary Facility 2012-10-04 Drilling/Alteration No Violations Noted CEMENT 9 5/8" 1520' GOOD RETURNS
2344175 Primary Facility 2015-02-13 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:
2369781 Primary Facility 2015-05-14 Routine/Complete Inspection No Violations Noted
2433860 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00 a.m., the cellar was full of water, the (9x5) vent pipe was open and venting to a tank, there was about 875psi on the tree top. I took a walk around the location and everything looked OK.
2528484 Primary Facility 2016-10-13 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination Inspection of the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:

7H (115-20938)


The Frystak site had all temporary BMPs removed and complied with PCSM and Restoration Plan Option 1. The site was stable and well vegetated with no apparent erosional issues.

I recommend APPROVAL of this Notice of Termination for the Frystak Pad.

There were no violations.

If there are any issues please feel free to contact me.

2535794 Primary Facility 2016-11-10 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:15a.m., the cellar was about a quarter full of water with no bubbling noticed, the (13x9) annulus was venting into the atmosphere with no gas detected, the (9x5) vent pipe was open and venting into a tank. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 12:20p.m.

2624176 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:15a.m.

The cellar was full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. There was 374psi on the production casing and 211psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:10a.m.

2732559 Primary Facility 2018-05-17 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 5' below grade in the cellar and there was no bubbling noticed, there was no gas detected in the remainder of the cellar. There were three 500bbl tanks on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed.

2784096 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site at 12:13 to conduct an inspection. The weather conditions are mostly cloudy skies, breezy, warm and humid with temperatures in the mid to upper 70's. Representing BKV at the site is Tom Mattern, Vice President of Operations and Dale Bennett, Site Safety Man. BKV consultants included Kevin Brady of Whitetail Environmental Services and Larry Gerard, Site Company Man. Halliburton is the BKV subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. BKV personnel provided me with following information regarding operations. “Wireline is on the 2H well. Frac is on the 3H well. Perforation casing is on the 2H well. Zipper frac is in progress. Frac operations started on 8/17/18. Frac operations on the 6H and 8H wells have been completed. The 5H and 7H wells were in production, but are currently are shut in. Frac on the 1H well is also in progress. The 4H well has been drilled to total depth but not yet stimulated. We are
2786942 Primary Facility 2018-09-11 Follow-up Inspection No Violations Noted I arrived at the site at 13:11. The weather conditions are mostly cloudy skies, calm winds, and humid with temps in the upper 60's to low 70's. I met with Jesse Bonnice, Senior Production Foreman of BKV, and Kevin Brady, Hydrologist, Environmental Scientist and Wetland Delineator of Whitetail Environmental Services, LLC. The main intent of the follow-up inspection is to evaluate the pad surface and secondary containment on the back side of the pad adjacent to site perimeter berm at the top of the fill slope, due to elevated specific conductance (conductivity) readings measured during the Department's 9/4/18 inspection. Refer to the Department's 9/4/18 inspection report, Inspection ID # 2782158 for additional details.

Frac operations have been recently completed. The next phase of operations to take place at the site is the drilling out of hydraulic fracturing plugs in the he recently stimulated wells, the Frystak 1H-3H, 6H and 8H wells. This will take place in the near future according to Mr. Bonnice

2808736 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At time of inspection.

The well in production. There was water .5' below grade in the cellar and there was no bubbling noticed. There were twenty eight 500bbl tanks on containment from a recent frac of the 1H, 2H, 3H, 6H and 8H wells. I spoke with Nick Cona of (J P Reilly) and he said 8 of the tanks were being used for production fluid and the rest were empty. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References