X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20939

Well Details

Well ID: 37-115-20939
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: BKV OPR LLC
Well Pad ID: 145321
Farm/Lease Name: FRYSTAK EAST 8H
License Status: INACTIVE
Spud Date:
Permit Date: 2012-08-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.866358
Longitude: -75.919450

For data sources see[1][2][3]

Well History

Date Event
2012-08-16 New Permit Application
2012-09-20 Performed Spud Operation
2012-11-12 Drilling Completion
2015-04-07 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-17 2018-08-25 6,479 6,938,090

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC S-2510T Halliburton Scale Inhibitor Listed Below
SAND-COMMON WHITE-100 MESH Halliburton Proppant Listed Below
HYDROCHLORIC ACID Halliburton Solvent Listed Below
SAND-PREMIUM WHITE-40/70 Halliburton Halliburton Listed Below
FE-2A Halliburton Additive Listed Below
HAI-150E Halliburton Corrosion Inhibitor Listed Below
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 78.6184
Produced Water Operator Base Fluid Produced Water 7732-18-5 10.4198
Quaternary ammonium compound 68424-85-1 7 0.00152 997
Acrylamide acrylate polymer Proprietary 30 0.01893 12393
Non-hazardous food substance Proprietary 100 0.00037 240
Ethylene glycol 107-21-1 60 0.00871 5701
Didecyldimethylammonium chloride 7173-51-5 10 0.00217 1424
Glutaraldehyde 111-30-8 30 0.00652 4271
Inorganic salt Proprietary 30 0.01893 12393
Ethanol 64-17-5 5 0.00109 712
Hydroteated light petroleum distillate 64742-47-8 30 0.01893 12393
Crystalline silica quartz 14808-60-7 100 10.259 6,717,560.0
Neutralized Polyacrylic Emulsion Proprietary 10 0.00145 951
Hydrochloric acid 7647-01-0 15 0.08998 58920
Citric acid 77-92-9 60 0.00189 1240
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below
MC B-8626 Halliburton Biocide Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2018 BKV OPR LLC 497,262.81 97 0.00 0 0.00 0
2019 BKV OPR LLC 1,099,338.62 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 592.29 Tons LANDFILL 301626
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 70.37 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 209.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2018 BKV OPR LLC Waste Water Treatment Sludge 17.65 Tons LANDFILL 301358
2018 BKV OPR LLC Produced Fluid 9,997.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 BKV OPR LLC Synthetic Liner Materials 5.65 Tons LANDFILL 101247
2018 BKV OPR LLC Produced Fluid 4,373.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Other Oil & Gas Wastes 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Filter Socks 0.36 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Produced Fluid 483.57 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 2,233.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Produced Fluid 195.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 BKV OPR LLC Waste Water Treatment Sludge 1.33 Tons LANDFILL 301358
2019 BKV OPR LLC Produced Fluid 5,033.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2143050 Primary Facility 2012-10-04 Drilling/Alteration No Violations Noted On site to follow up on cement job on 9 5/8" on Frystak East 7H. Nabors Rig M 61 rigged up on Frystak East 8H currently to begin drilling tophole. Conductor for 8H has been set at 45'. Should begin drilling surface in a couple days. No violations observed at this time.
2344177 Primary Facility 2015-02-13 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:
2352798 Primary Facility 2015-02-02 Routine/Complete Inspection No Violations Noted Performed inspection for inactive status. Well is a natural gas well with a TD of 11012. The casing lengths and depths are documented on hard copy inspection form. The well is currently shut-in with gauges on all annuli reading 0 psi. The cellar is frozen with ice and several inches of snow. No visible bubbling witnessed. Carrizo is awaiting Regional Infrastructure and plan to put the well into production on or around 2/2020. Inactive status submitted for approval. Approval granted 2/25/2015.
2369780 Primary Facility 2015-05-14 Routine/Complete Inspection No Violations Noted
2528485 Primary Facility 2016-10-13 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination Inspection of the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:

8H (115-20939)

The Frystak site had all temporary BMPs removed and complied with PCSM and Restoration Plan Option 1. The site was stable and well vegetated with no apparent erosional issues.

I recommend APPROVAL of this Notice of Termination for the Frystak Pad.

There were no violations.

If there are any issues please feel free to contact me.

2535798 Primary Facility 2016-11-10 Routine/Complete Inspection Violation(s) Noted At time of inspection, arrived on site at 11:15a.m., the cellar was full of water with no bubbling noticed, the (13x9) annulus was venting into the atmosphere with gas detected at 100% LEL and 19% methane with no measurable flow. The (9x5) vent pipe was open and venting into a tank. I took a walk around the location and there were no obvious concerns noticed.

The well was granted inactive status on 2/25/15. I left the site at 12:20p.m.

2624179 Primary Facility 2017-08-09 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection, arrived on site at 9:15a.m.

The cellar was full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. The valve on the production line and at the GPU were closed. The well is drilled to TD but hasn’t been stimulated. It was granted inactive status on 2/25/15. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:10a.m. Gas was detected during a routine inspection on 12/17/15, it was determined the gas was coming from the (13x9) annulus during a follow up inspection on 12/18/15.

2731178 Primary Facility 2018-05-17 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection.

The well was granted regulatory inactive status on 2/25/15. There was water 3' below grade in the cellar and there was no bubbling noticed, there was no gas detected in the remainder of the cellar. There was gas detected at the (13x9) annulus at 100% LEL and 17% methane. The well hasn't been stimulated but the Department received a pressure test notification on 3/29/18. There were three 500bbl tanks on containment and the containment appeared to be in good condition. The main valve on the production line was closed. I took a walk around the location and there were no obvious concerns noticed.

2772329 Primary Facility 2018-09-07 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Larry Gerard and Tom Mattern. Halliburton was on site to frac the 1H, 2H, 3H, 6H and 8H wells. The were running a plug and perf in the 3H and pressure testing iron to start stage 24 on the 2H when I arrived on location. The 1H was completed with 20 stages. There were 23 out of 25 stages completed on the 2H. There were 22 out of 24 stages completed on the 3H. The 6H was completed with 20 stages. The 8H was completed with 19 stages. The water was be pumped to the site from the Bush fresh water impoundment and production water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2784111 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site at 12:13 to conduct an inspection. The weather conditions are mostly cloudy skies, breezy, warm and humid with temperatures in the mid to upper 70's. Representing BKV at the site is Tom Mattern, Vice President of Operations and Dale Bennett, Site Safety Man. BKV consultants included Kevin Brady of Whitetail Environmental Services and Larry Gerard, Site Company Man. Halliburton is the BKV subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. BKV personnel provided me with following information regarding operations. “Wireline is on the 2H well. Frac is on the 3H well. Perforation casing is on the 2H well. Zipper frac is in progress. Frac operations started on 8/17/18. Frac operations on the 6H and 8H wells have been completed. The 5H and 7H wells were in production, but are currently are shut in. Frac on the 1H well is also in progress. The 4H well has been drilled to total depth but not yet stimulated. We are
2786946 Primary Facility 2018-09-11 Follow-up Inspection No Violations Noted I arrived at the site at 13:11. The weather conditions are mostly cloudy skies, calm winds, and humid with temps in the upper 60's to low 70's. I met with Jesse Bonnice, Senior Production Foreman of BKV, and Kevin Brady, Hydrologist, Environmental Scientist and Wetland Delineator of Whitetail Environmental Services, LLC. The main intent of the follow-up inspection is to evaluate the pad surface and secondary containment on the back side of the pad adjacent to site perimeter berm at the top of the fill slope, due to elevated specific conductance (conductivity) readings measured during the Department's 9/4/18 inspection. Refer to the Department's 9/4/18 inspection report, Inspection ID # 2782158 for additional details.

Frac operations have been recently completed. The next phase of operations to take place at the site is the drilling out of hydraulic fracturing plugs in the he recently stimulated wells, the Frystak 1H-3H, 6H and 8H wells. This will take place in the near future according to Mr. Bonnice

2808724 Primary Facility 2018-11-30 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection.

The well was recently completed and put in production. The permit numbers on the entrance sign were correct. The well tag was on the well and correct. There was water .5' below grade in the cellar and there was no bubbling noticed. There were twenty eight 500bbl tanks on containment from a recent frac of the 1H, 2H, 3H, 6H and 8H wells. I spoke with Nick Cona of (J P Reilly) and he said 8 of the tanks were being used for production fluid and the rest were empty. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2535798 772153 2016-11-10 78a86 Environmental Health & Safety
2535798 772154 2016-11-10 78a85(a)5 Environmental Health & Safety
2624179 793840 2017-08-09 78a85(a)5 Environmental Health & Safety
2624179 793841 2017-08-09 78a86 Environmental Health & Safety
2731178 817238 2016-11-10 78a86 Environmental Health & Safety
2731178 817239 2016-11-10 78a85(a)5 Environmental Health & Safety
2808724 834699 2016-11-10 78a86 Environmental Health & Safety
2808724 834700 2016-11-10 78a85(a)5 Environmental Health & Safety

For data sources see[8]

References