Well ID: 37-115-21023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.785281,"lon":-75.599933,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Gibson Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147709 | |
Farm/Lease Name: ALDRICH L 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-11-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.785281 | |
Longitude: -75.599933 |
Date | Event |
---|---|
2012-11-07 | New Permit Application |
2012-11-14 | Performed Spud Operation |
2013-02-06 | Drilling Completion |
2013-03-01 | Perforation |
2013-03-19 | Performed Stimulation |
2013-12-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-03 | 2013-04-05 | 7,284 | 4,400,210 | 254,870 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCl, 10.1 - 15% | Baker Hughes | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0899021 | 37703.1 |
Water | 7732-18-5 | 85 | 0.509445 | 213651 | ||||
Other Chemicals | Sodium Chloride | 7647-14-5 | 0 | 0.00000450 | 1.8901 | |||
Formaldehyde | 50-00-0 | 0 | 0.00000900 | 3.77 | ||||
Methanol | 67-56-1 | 0 | 0.0008989 | 377 | ||||
Ethoxylated Alcohol | Trade Secret | 0 | 0.0013773 | 577.63 | ||||
Salt | Trade Secret | 0 | 0.0034434 | 1444.08 | ||||
Potassium Chloride | 7447-40-7 | 0 | 0.00000750 | 3.1502 | ||||
Hydrochloric Acid | 7647-01-0 | 0 | 0.00000900 | 3.77 | ||||
Water | 7732-18-5 | 0 | 0.0552693 | 23178.8 | ||||
Poly (acrylamide-co-acrylic acid) | Trade Secret | 0 | 0.0206602 | 8664.45 | ||||
Polyacrylate | Trade Secret | 0 | 0.0030047 | 1260.09 | ||||
Sorbitan Monooleate | Trade Secret | 0 | 0.0034434 | 1444.08 | ||||
Modified Thiorea Polymer | 68527-49-1 | 0 | 0.00006290 | 26.39 | ||||
Ferrotrol 300L | Baker Hughes | Iron Control | Citric Acid | 77-92-9 | 60 | 0.0007817 | 327.826 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 87.482 | 36,688,100.0 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.004507 | 1890.14 | |
Calcium Chloride | 10043-52-4 | 5 | 0.0007512 | 315.023 | ||||
CI-14 | Baker Hughes | Corrosion Inhibitor | Fatty Acids | Trade Secret | 10 | 0.00008990 | 37.7 | |
Polyoxyalkylenes | Trade Secret | 30 | 0.0002697 | 113.1 | ||||
Olefin | Trade Secret | 5 | 0.00004490 | 18.85 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00004490 | 18.85 | ||||
Sand, White, 100 mesh | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.620441 | 260200 | |
FRW-18 | Baker Hughes | Friction Reducer | Petroleum Distillates | 64742-47-8 | 30 | 0.0206602 | 8664.45 | |
Alpha 1427 | Baker Hughes | Biocide | Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0010662 | 447.125 | |
Glutaraldehyde | 111-30-8 | 30 | 0.006397 | 2682.75 | ||||
Ethanol | 64-17-5 | 5 | 0.0010662 | 447.125 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0021323 | 894.25 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 11.1722 | 4,685,400.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-03-19 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,334,890.79 | 78 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,842,506.94 | 248 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,250,775.25 | 349 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 736,352.31 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 584,081.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 444,051.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 658.92 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,282.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 12,228.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,988.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 564.04 Tons | LANDFILL | THR029 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 3,416.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,807.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 8,989.48 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 124.37 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE004 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 5,626.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 1,306.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 444.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 1,249.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.45 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 1,166.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 19.20 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 82.91 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 1,320.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 365.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 663.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 375.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 1,911.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2125306 | Primary Facility | 2012-12-12 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | WEll spudded. Site ID sign does not have permit # posted. Violation of 58. P.S. 201G. Co. Man corrected violation while I was on site. Precision rig 531 currently drilling ahead on Aldrich L5. |
2135122 | Primary Facility | 2013-01-29 | Drilling/Alteration | No Violations Noted | Precision Rig #531. Drilling ahead @ 11594'. Drillers log on site and yup to date. Secondary containment in place TD of hole @ 13,900'. Last well on pad at this time. Moving rig to Severcool. Checked cellars on #1 and #2 - no bubling observed. Walked site. Area appears clean with no visible spills. Permit on site. Site ID sign in place with permit #'s posted. No violations observed at this time. |
2215025 | Primary Facility | 2013-10-16 | Incident- Response to Accident or Event | No Violations Noted | Specifics associated with this inspection report can be referred to in the L Aldrich 1 H inspection report. Permit number is 115-21019. E-facts identification number is 2214965. |
2291894 | Primary Facility | 2014-07-23 | Incident- Response to Accident or Event | No Violations Noted | Violations are associated with the L Aldrich I well. Permit number is 115-21019. Specifics associated with the inspection can be referred to in the L Aldrich 1H e-facts entry. |
2341045 | Primary Facility | 2015-02-03 | Incident- Response to Accident or Event | No Violations Noted | On 2/3/15, the Department received a complaint that hydraulic fracturing activities occurring on the Cabot Aldrich L. Pad had caused damage to the complainant’s house via causing a possible mini earthquake. The Department confirmed administratively and through field observations that Cabot is in fact conducting hydraulic fracturing activities on the pad. The site reconnaissance did not reveal any violations at the pad. The complaint investigation ultimately revealed that the damage observed at the complainant’s house was not related to activities at the Aldrich Pad, nor any other Oil and Gas related activity. |
2352465 | Primary Facility | 2015-02-19 | Routine/Complete Inspection | No Violations Noted | On 2/19/15, the Department conducted an inspection of the COG Aldrich L Pad in response to Cabot’s self-reporting of this small spill of recycled blended fluid. Present during this inspection was Jon Sassi, David Schoonover, Joe Gaboff, and Steve Watson of Cabot. Mr. Watson explained that Resource Environmental had determined that further remediation of the impacted area would need to be conducted. Mr. Watson stated that Cabot’s intention is to finish their scheduled hydraulic fracturing activities. |
2377574 | Primary Facility | 2015-06-10 | Administrative/File Review | No Violations Noted | The Department has reviewed and accepts the conclusions reached by Cabot in the attached Remediation Summary Report and associated Addendum relating to a small spill which occurred 2/15/15 on the Cabot Aldrich L. Pad. 2 field visits conducted by the Department on 4/16/15 by Jon Sassi and on 4/20/15 by Gene Rickard support the conclusions reached by Cabot. No further action needs to be taken by Cabot at this time. |
2378732 | Primary Facility | 2015-05-28 | Routine/Complete Inspection | No Violations Noted | Present were Gene Rickard, Jon Sassi, Rick Croll, Steve Watson of Cabot, and representatives of Resource Environmental, who Cabot has contracted to oversee the remediation of this apparent spill. During the inspection, the Department observed continued cleanup of the material in question. Mr. Croll scanned the remaining impacted area which had not been identified the previous day, and again found nothing of significance beyond background levels. The material did have a slight petroleum odor to it. Thus far 11 totes of material have been recovered. Mr. Watson estimates that if the material in question is contaminated, it would probably be around 3 barrels worth of material. |
2378828 | Primary Facility | 2015-06-12 | Administrative/File Review | No Violations Noted | On 6/12/2015 Resource Environmental on behalf of Cabot Oil and Gas submitted analytical results to the Department via e-mail regarding the discovery of a mud-like substance containing a slight petroleum odor on 5/27/2015. Resource indicated in the e-mail that a lubricating oil release had occurred at this location, a visual inspection of the southwest corner of the pad surface identified a brown soil-like material present as blotches on the surface and the material had a petroleum-like odor to it. Diesel Range Organics was measured at a concentration of 56,600 mg/kg. Total Petroleum Hydrocarbons was measured at a concentration of 89,200 mg/kg. The parameters are elevated above background levels indicating oil waste was released to and impacted the southwest corner of the pad surface. |
2440746 | Primary Facility | 2016-01-13 | Routine/Complete Inspection | No Violations Noted | On 1/12/16, Steve Watson, Cabot EH&S Specialist, contacted the Department to report the release of approximately 25 gallons of blended fluid on their Stellitano Pad. The release occurred at 7:40 PM that day when a hose clamp failed during a procedure to dewater a low point on the overland water line being utilized to transport the blended fluid from the COG Aldrich Pad to the fracturing operations being currently conducted on the Stellitano.
On 1/13/16, the Department met Mr. Watson at the spill site. Two technicians from Resource Environmental were on-site conducting characterization on the impact extent. Thus far it appears that most of the impact occurred on the access road itself. A gross amount of potentially impacted material has been removed and placed on containment. Resource is actively conducting soil conductivity testing as part of the remediation process. |
2446317 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | Due to the transfer of recycled water from the Hibbard Facility to the Aldrich Pad for temporary storage and the transfer of fluid from the Aldrich Pad to the Stellitano Pad for use during hydraulic fracturing, it is apparent that a General Permit WMGR 123 Processing of Oil and Gas Liquid Waste is required and the Aldrich Pad is considered to be a residual waste transfer station. Recycled water is not being solely utilized for the wells on the Aldrich Pad and the frac tanks in the tank farm do not solely contain production fluid from the Aldrich wells. The conductivity was (3) milliSiemens/cm³ on containment in the freshwater section in the tank farm near the SE corner of the pad. Conductivity was (3.5) ms/cm³ in water in frac tank #251755; (5) ms/cm³ in frac tank #251757 and (8) ms/cm in frac tank #251807. These tanks are stage in the freshwater section of the tank farm. Conductivity readings exceeded (10) ms/cm³ on the Hanna meter and read over range on the Oakton meter in water in frac tank #'s 251786 a |
2446885 | Primary Facility | 2016-01-08 | Incident- Response to Accident or Event | No Violations Noted | Steve Watson, Environmental Health and Safety Specialist of Cabot Oil and Gas contacted the Department at 5:46 AM on 1/8/16 to report a spill of (15) gallons of recycled water. I contacted Mr. Watson at 8:30 AM on 1/8/16 to discuss the specifics of the spill. Mr. Watson stated that the spill occurred as a result of a Baker Corporation employee opening a valve on a frac tank not intended to be offloaded with recycled water transported to the site from Cabot's A&M Hibbard Centralized Treatment facility in Dimock, PA. Staining on the pad surface was observed in between a Diaz roll-of container lined with plastic and the corrugated pipe containment berm for the tank farm. The co-ordinates for the spill area are N- 41.78472°; W- 75.60059°. Resource Environmental was in the process of conducting conductivity soil electrical conductivity screening in the impacted area of the pad surface where the spill occurred. The recycled water is a mixture of flowback and production fluid generated from Cabot wells. |
2448711 | Primary Facility | 2016-02-04 | Routine/Complete Inspection | No Violations Noted | On 2/4/16, the Department received a report from Jim Garner, Susquehanna County Conservation District Manager stating that fracking operations being conducted by Cabot on their Aldrich and Stellitano Pads were causing mud to be deposited on State Route 92 at the intersection of SR 92 and the Great Bend Turnpike. During a site visit, a crew was observed monitoring this intersection and actively cleaning the intersection. No soil was observed on SR 92. This intersection is located approximately ½ mile from the access roads of both pads which are located on the Great Bend Turnpike. Mike Pirner, Cabot Construction Foreman was stationed at the Aldrich pad monitoring operations to include monitoring conditions of the unpaved Great Bend Turnpike. The Department finds that the fracking operations are not directly impacting SR 92. Mr. Garner was directed to contact either PENNDOT or the Township in resolving any future perceived issues at this particular intersection. No violations were noted during the inspec |
2488134 | Primary Facility | 2016-05-26 | Routine/Complete Inspection | No Violations Noted | |
2557378 | Primary Facility | 2017-01-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 14:05p.m., the cellar was full of water and ice with no bubbling noticed. The (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 644psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 15:00p.m. |
2650390 | Primary Facility | 2017-10-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. It appears tubing was recently put in the well. The (13x9) and (9x5) annuli were connected together and venting into the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2729707 | Primary Facility | 2018-05-08 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. The conductivity of the standing water was checked with all readings observed less than 200 microsiemens. No E&S issues were observed. No violations noted. |
2754731 | Primary Facility | 2018-07-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2755645 | Primary Facility | 2018-07-18 | Routine/Complete Inspection | No Violations Noted | The Department arrived on site at 1200 hrs to conduct a RTNC inspection. The Department was represented by Jon Sassi (EPS), Frank Hoehle (WQS) and myself.
Upon arrival, we observed that the E&S inspection log was up to date and that the required signage was present at the entrance to the pad's access road. The access road and pad surface were both solid and stable. The cut slope and fill slope were both well-vegetated and stable. All necessary PCSM BMPs were in place and in good condition. The pad had nine producing wells at the time of our inspection: the 1H, 2H, 3H, 4H, 5H, 6H, 7H, 8H, and 10H. All the wells were properly labeled. No bubbling was present in the well cellar, but several of them were almost full to the top with stormwater and should be addressed promptly to prevent overflow, as seen in the pictures attached to this report. There were several cellars that were fairly full, but three of them are very close to overflowing and should be given priority: the 1H, 4H, and 10H. The production flui |
2805730 | Primary Facility | 2018-11-20 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were identified, however as depicted in the photos, the site is covered in snow, hence unable to completely substantiate stability. No spills detected. No violations noted. |
2856210 | Primary Facility | 2019-03-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was ice 4' below grade in the cellar and there was no gas detected in the remainder of the cellar. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 3/4/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2125306 | 656368 | 12/12/2012 | 2012-12-12 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | Administrative |
For data sources see[9]