If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21534 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.732842,"lon":-75.773797,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Brooklyn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 150542 | |
Farm/Lease Name: FOLTZ J 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-12-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.732842 | |
Longitude: -75.773797 |
Date | Event |
---|---|
2013-12-09 | New Permit Application |
2014-01-29 | Performed Spud Operation |
2014-09-24 | Drilling Completion |
2015-01-24 | Perforation |
2015-03-10 | Performed Stimulation |
2015-08-18 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-09 | 2015-04-16 | 7,094 | 11,347,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Chemplex 4-N-1 | Chemplex | Combination/Iron Control | Alcohol Ethoxylate Surfactants | Proprietary | 2 | 0.00003551 | 38.075 |
n-olefins | Proprietary | 1 | 0.00001775 | 19.037 | ||||
thiourea-formaldehyde copolymer | 68527-49-1 | 2 | 0.00003551 | 38.075 | ||||
Cocamide Diethanolamine Salt | 68603-42-9 | 2 | 0.00003551 | 38.075 | ||||
Diethanolamine | 111-42-2 | 2 | 0.00003551 | 38.075 | ||||
Propargyl Alcohol | 107-19-7 | 1 | 0.00001775 | 19.037 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00017753 | 190.374 | ||||
Methyl Alcohol | 67-56-1 | 10 | 0.00017753 | 190.374 | ||||
Acetic Acid | 64-19-7 | 85 | 0.001509 | 1618.18 | ||||
Plexslick 957 | Chemplex | Friction Reducer | Paraffinic, Naphtehenic Solvent | 64742-47-8 | 30 | 0.029574 | 31713.7 | |
Ammonium Chloride | 12125-02-9 | 5 | 0.004929 | 5285.61 | ||||
Nonionic Surfactants | Proprietary | 1.5 | 0.0014787 | 1585.68 | ||||
Poly (acrylamide-co-acrylic acid), partial sodium salt | 62649-23-4 | 35 | 0.034503 | 36999.3 | ||||
Hydrochloric Acid (15%) | Reagent | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0458486 | 49165.7 | |
Plexcide 15G | Chemplex | Biocide | Glutaraldehyde | 111-30-8 | 14 | 0.00301431 | 3232.39 | |
Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.000645924 | 692.656 | ||||
Ethanol | 64-17-5 | 3 | 0.000645924 | 692.656 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.000645924 | 692.656 | ||||
Sand (Proppant) | TSS | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.9257 | 11,716,200.0 | |
Water | Rockwater | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.623 | 95,034,800.0 | |
Greenhib 679 | Chemplex | Friction Reducer | Proprietary | Proprietary | 35 | 0.00831576 | 8917.4 | |
Glycerine | 56-81-5 | 20 | 0.00475186 | 5095.66 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-03-10 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 3,666,091.37 | 216 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 3,374,897.47 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,896,487.95 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 1,771,908.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 1,508,811.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 37.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | CABOT OIL & GAS CORP | Drill Cuttings | 1,679.93 Tons | LANDFILL | 101247 |
2014 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 130.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 127.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 4.46 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,097.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 13.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 8,812.97 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 469.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 0.94 Tons | LANDFILL | 301358 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 906.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 164.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 10.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 307.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 595.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 179.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 685.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 124.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2240440 | Primary Facility | 2014-01-29 | Preoperation Inspection | No Violations Noted | |
2254510 | Primary Facility | 2014-03-18 | Drilling/Alteration | No Violations Noted | |
2303578 | Primary Facility | 2014-09-10 | Drilling/Alteration | No Violations Noted | |
2308607 | Primary Facility | 2014-09-25 | Drilling/Alteration | No Violations Noted | |
2322406 | Primary Facility | 2014-11-13 | Drilling/Alteration | No Violations Noted | |
2377427 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | |
2477988 | Primary Facility | 2016-04-25 | Routine/Complete Inspection | Pending | At time of inspection, arrived on site at 12:45 p.m., the cellar had water at the bottom with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 736psi on the production casing. I took a walk around the location and notice a numerous number of stains on the site. I contacted Andy Mehalko of Cabot Oil and Gas to have the stains checked out and contact the department with their plans. I also let DEP WQS Scott Kuchta know about the stains on the ground.
I left the site at 13:40 p.m. |
2531976 | Primary Facility | 2016-10-26 | Routine/Complete Inspection | No Violations Noted | Inspection of the Foltz J. P1 well pad in conjunction with the Maplewood Pipeline notice of termination inspection. No E&S issues observed on the pad at the time of the inspection. |
2631383 | Primary Facility | 2017-08-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. I took a walk around the location and there were no obvious concerns noticed. |
For data sources see[9]