If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21967 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.789064,"lon":-75.863192,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Bridgewater Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: | |
Farm/Lease Name: GROOVER S 9 | |
License Status: | |
Spud Date: | |
Permit Date: 2015-03-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.789064 | |
Longitude: -75.863192 |
Date | Event |
---|---|
2015-03-05 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2440777 | Primary Facility | 2015-11-13 | Routine/Complete Inspection | No Violations Noted | Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection. |
2597034 | Primary Facility | 2017-05-16 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection. At the time of my arrival, I met with Ray Peplinski (Chief Inspector-Williams). The E&S Inspection Log stated that the most recent inspection was a post precipitation inspection conducted on. 5/15/17 by Anna Bonczek (TEC). |
For data sources see[5]