X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22175

Well Details

Well ID: 37-115-22175
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 153516
Farm/Lease Name: HOWELL G 8
License Status:
Spud Date:
Permit Date: 2016-03-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.737997
Longitude: -75.987439

For data sources see[1][2][3]

Well History

Date Event
2016-03-07 New Permit Application
2016-10-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-03 2017-03-25 6,870 18,979,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, KAI-13 Keane Acid Inhibitor formic acid 64-18-6 10 0.00007609 137.859
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015218 275.719
Ethoxylated alcohol 68131-39-5 10 0.00007609 137.859
Cinnamaldehyde 104-55-2 10 0.00007609 137.859
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007609 137.859
isoproyl alcohol 67-63-0 5 0.00003804 68.93
Ethylene glycol 107-21-1 40 0.00030436 551.438
Friction Reducer, KFR-20 Keane Friction Reducer Petroleum distillate 64742-47-8 1 0.000924841 1675.62
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00462421 8378.11
ammonium chloride 12125-02-9 30 0.0277452 50268.7
Water 7732-18-5 30 0.0277452 50268.7
oleic acid diethanolamide 93-83-4 1 0.000924841 1675.62
Copolymer of 2-propenamide 69418-26-4 5 0.00462421 8378.11
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000107042 193.938
Citric acid 77-92-9 30 0.000642251 1163.63
Scale Inhibitor, KLSI-20 Keane Scale Inhibitor organic phosphonic acids salts 15827-60-8 17 0.00316442 5733.27
Methyl Alcohol 67-56-1 10 0.00186142 3372.51
Sodium Chloride 7647-14-5 3 0.000558426 1011.75
Water 7732-18-5 70 0.01303 23607.6
Other Chemical(s) Listed Above See Trade Name(s) List Copolymer of 2-propenamide 69418-26-4 5 0.00462421 8378.11
isoproyl alcohol 67-63-0 5 0.00003804 68.93
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015218 275.719
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00462421 8378.11
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007609 137.859
Glutaral 111-30-8 26.7 0.00244309 4426.37
ammonium chloride 12125-02-9 30 0.0277452 50268.7
didecyldimethylammonium chloride 7173-51-5 8 0.000729266 1321.28
Methyl Alcohol 67-56-1 10 0.00186142 3372.51
Sodium Chloride 7647-14-5 3 0.000558426 1011.75
Citric acid 77-92-9 30 0.000642251 1163.63
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000485872 880.301
Water 7732-18-5 7.5 0.00192969 3496.2
Cinnamaldehyde 104-55-2 10 0.00007609 137.859
organic phosphonic acids salts 15827-60-8 17 0.00316442 5733.27
Ethoxylated alcohol 68131-39-5 10 0.00007609 137.859
Petroleum distillate 64742-47-8 1 0.000924841 1675.62
oleic acid diethanolamide 93-83-4 1 0.000924841 1675.62
formic acid 64-18-6 10 0.00007609 137.859
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00518996 9403.14
Glutaral 111-30-8 26.7 0.00244309 4426.37
didecyldimethylammonium chloride 7173-51-5 8 0.000729266 1321.28
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000485872 880.301
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.4317 22,523,700.0
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.4194 158,386,000.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00385938 6992.4
Water 7732-18-5 7.5 0.00192969 3496.2

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 6,278,118.73 160 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 6,860,453.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 3,812,266.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 1.75 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Drill Cuttings 1,648.76 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 55.60 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 29.31 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 9,374.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 15.72 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 16,371.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 2,367.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 2,495.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 1,942.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2493918 Primary Facility 2016-06-17 Preoperation Inspection No Violations Noted
2530701 Primary Facility 2016-10-11 Drilling/Alteration No Violations Noted
2539085 Primary Facility 2016-11-23 Drilling/Alteration No Violations Noted
2542986 Primary Facility 2016-12-07 Drilling/Alteration No Violations Noted
2548972 Primary Facility 2016-12-20 Routine/Complete Inspection No Violations Noted I arrived at the site at 13:00. Precision Drilling Rig #548 is at the site currently in the process of drilling the G Howell 2H well at depth of (2,147.17) feet. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department on 11/20/16. The notice indicates that Cabot would resume drilling of the G Howell 2H well on 11/21/16 at 12:00 PM. I met with Joel Franks, site company man of Cabot Oil and Gas. Mr. Franks stated the following. "The intermediate casing for the 2H well has been set at 2,045 feet. The surface casing for the 2H well was set at 950 feet. "The 2H well will be drilled to a total depth of 12,800 feet. The 2H well is being drilled with water based mud. The water mixed with the mud is fresh water from a nearby trout hatchery. The Derrick centrifuges are used to separate the drilling mud from the drill cuttings. The mud returns to the mud pits. The drill cuttings are dried with sawdust and sent to Keystone Landfill for disposal. New Park Rig Mats, Felt on t
2568528 Primary Facility 2017-03-04 Drilling/Alteration No Violations Noted Inspection of Cabot’s Howell G pad in Auburn Twp. Susquehanna County conducted Friday March 4th 2017 at 1:00 pm. Keane was rigged up on the pad to frack 4 wells; the 8H, 6H, 4H, 2H. The crew was tied into the 8H at the time of inspection, the first well of four on the pad, about to come on line for the first stage. I met with the Companyman. He said they began to rig up on Tuesday. At that time, they shut in the (9 5/8” x 5 ½”) annulus for digital monitoring during operations. I went in the frack van to take a look at rate and pressures as they come on-line to pump this first stage. Pressures observed before coming online are as follows; (8H) (current well); 235 PSI casing, -4.93 annulus (6H) 0 PSI casing, -22.88 PSI annulus (4H) 19.29 PSI casing, 19.29 PSI annulus and (2H) 28.34 PSI casing, 3.36 PSI annulus. The crew pressure tested @12K, no issues, open wellhead pressure 632 PSI, came online for first stage and took it up to ~4500PSI, no significant increase in pressure on the annulus just a few PSI attrib
2575926 Primary Facility 2017-03-16 Follow-up Inspection No Violations Noted
2586268 Primary Facility 2017-04-11 Follow-up Inspection Pending
2592165 Primary Facility 2017-04-21 Follow-up Inspection No Violations Noted
2601859 Primary Facility 2017-05-22 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:45. The weather conditions were cloudy skies with light to moderate rain falling with temperatures in the lower 60's. I met with Jim Restly, site company man, consultant of Cabot. Mr. Restly stated the following. "Deep Well Services Rig #4 is in the process of squeezing cement on the 6H well. Hydraulic fracturing and frac plug drill outs have been completed on the 2H, 4H, 6H and 8H wells. This particular rig has been here for about a month squeezing the cement, drilling out the cement and running segmented bond logs on the 4H and 6H wells. Currently, only freshwater is being used to squeeze and drill out cement. There are (2) cast iron bridge plugs set in place in the 4H and 6H wells at around (5,800)and (5,900) feet, to hold gas in place while drilling out cement. It has not yet been determined as to when this project will be completed. Once this project is completed, then flowback of the (4) wells should commence." Prior to departing the site, Resource Environmental informed m
2622938 Primary Facility 2017-08-07 Administrative/File Review No Violations Noted Restoration Extension Request received on 3AUG2017.
2725251 Primary Facility 2018-05-01 Routine/Complete Inspection No Violations Noted I inspected the Howell on May 1, 2018 for a routine complete inspection. The wells associated with this site are as follows: 115-22172, 115-22173, 115-22174, 115-22175. The wells were properly labeled.

The fill slope was stable but repaired with riprap in various locations. It was well vegetated elsewhere. The cut slope was well vegetated. The pad surface and access road were stable and the entrance showed evidence of recent minor repair. There were no erosional issues apparent.

There were no violations

For data sources see[8]

References