If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.737997,"lon":-75.987439,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 153516 | |
Farm/Lease Name: HOWELL G 8 | |
License Status: | |
Spud Date: | |
Permit Date: 2016-03-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.737997 | |
Longitude: -75.987439 |
Date | Event |
---|---|
2016-03-07 | New Permit Application |
2016-10-09 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-03 | 2017-03-25 | 6,870 | 18,979,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor, KAI-13 | Keane | Acid Inhibitor | formic acid | 64-18-6 | 10 | 0.00007609 | 137.859 |
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.00015218 | 275.719 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.00007609 | 137.859 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00007609 | 137.859 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00007609 | 137.859 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00003804 | 68.93 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00030436 | 551.438 | ||||
Friction Reducer, KFR-20 | Keane | Friction Reducer | Petroleum distillate | 64742-47-8 | 1 | 0.000924841 | 1675.62 | |
alcohols, C 12-16, ethoxylated | 68551-12-2 | 5 | 0.00462421 | 8378.11 | ||||
ammonium chloride | 12125-02-9 | 30 | 0.0277452 | 50268.7 | ||||
Water | 7732-18-5 | 30 | 0.0277452 | 50268.7 | ||||
oleic acid diethanolamide | 93-83-4 | 1 | 0.000924841 | 1675.62 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 5 | 0.00462421 | 8378.11 | ||||
Iron Control, KFEAC-20/30 | Keane | Iron Control | Acetic acid | 64-19-7 | 5 | 0.000107042 | 193.938 | |
Citric acid | 77-92-9 | 30 | 0.000642251 | 1163.63 | ||||
Scale Inhibitor, KLSI-20 | Keane | Scale Inhibitor | organic phosphonic acids salts | 15827-60-8 | 17 | 0.00316442 | 5733.27 | |
Methyl Alcohol | 67-56-1 | 10 | 0.00186142 | 3372.51 | ||||
Sodium Chloride | 7647-14-5 | 3 | 0.000558426 | 1011.75 | ||||
Water | 7732-18-5 | 70 | 0.01303 | 23607.6 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Copolymer of 2-propenamide | 69418-26-4 | 5 | 0.00462421 | 8378.11 | |
isoproyl alcohol | 67-63-0 | 5 | 0.00003804 | 68.93 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.00015218 | 275.719 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 5 | 0.00462421 | 8378.11 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00007609 | 137.859 | ||||
Glutaral | 111-30-8 | 26.7 | 0.00244309 | 4426.37 | ||||
ammonium chloride | 12125-02-9 | 30 | 0.0277452 | 50268.7 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000729266 | 1321.28 | ||||
Methyl Alcohol | 67-56-1 | 10 | 0.00186142 | 3372.51 | ||||
Sodium Chloride | 7647-14-5 | 3 | 0.000558426 | 1011.75 | ||||
Citric acid | 77-92-9 | 30 | 0.000642251 | 1163.63 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000485872 | 880.301 | ||||
Water | 7732-18-5 | 7.5 | 0.00192969 | 3496.2 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00007609 | 137.859 | ||||
organic phosphonic acids salts | 15827-60-8 | 17 | 0.00316442 | 5733.27 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.00007609 | 137.859 | ||||
Petroleum distillate | 64742-47-8 | 1 | 0.000924841 | 1675.62 | ||||
oleic acid diethanolamide | 93-83-4 | 1 | 0.000924841 | 1675.62 | ||||
formic acid | 64-18-6 | 10 | 0.00007609 | 137.859 | ||||
Biocide, MBC-516 | Keane | Biocide | Water | 7732-18-5 | 56.7 | 0.00518996 | 9403.14 | |
Glutaral | 111-30-8 | 26.7 | 0.00244309 | 4426.37 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000729266 | 1321.28 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000485872 | 880.301 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 12.4317 | 22,523,700.0 | |
Water | Cabot | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.4194 | 158,386,000.0 | |
Hydrochloric Acid (15%) | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00385938 | 6992.4 | |
Water | 7732-18-5 | 7.5 | 0.00192969 | 3496.2 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 6,278,118.73 | 160 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 6,860,453.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 3,812,266.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.75 Tons | LANDFILL | 101247 |
2016 | CABOT OIL & GAS CORP | Drill Cuttings | 1,648.76 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 55.60 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.05 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 29.31 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 9,374.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 15.72 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 16,371.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 2,367.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 2,495.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 1,942.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2493918 | Primary Facility | 2016-06-17 | Preoperation Inspection | No Violations Noted | |
2530701 | Primary Facility | 2016-10-11 | Drilling/Alteration | No Violations Noted | |
2539085 | Primary Facility | 2016-11-23 | Drilling/Alteration | No Violations Noted | |
2542986 | Primary Facility | 2016-12-07 | Drilling/Alteration | No Violations Noted | |
2548972 | Primary Facility | 2016-12-20 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 13:00. Precision Drilling Rig #548 is at the site currently in the process of drilling the G Howell 2H well at depth of (2,147.17) feet. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department on 11/20/16. The notice indicates that Cabot would resume drilling of the G Howell 2H well on 11/21/16 at 12:00 PM. I met with Joel Franks, site company man of Cabot Oil and Gas. Mr. Franks stated the following. "The intermediate casing for the 2H well has been set at 2,045 feet. The surface casing for the 2H well was set at 950 feet. "The 2H well will be drilled to a total depth of 12,800 feet. The 2H well is being drilled with water based mud. The water mixed with the mud is fresh water from a nearby trout hatchery. The Derrick centrifuges are used to separate the drilling mud from the drill cuttings. The mud returns to the mud pits. The drill cuttings are dried with sawdust and sent to Keystone Landfill for disposal. New Park Rig Mats, Felt on t |
2568528 | Primary Facility | 2017-03-04 | Drilling/Alteration | No Violations Noted | Inspection of Cabot’s Howell G pad in Auburn Twp. Susquehanna County conducted Friday March 4th 2017 at 1:00 pm. Keane was rigged up on the pad to frack 4 wells; the 8H, 6H, 4H, 2H. The crew was tied into the 8H at the time of inspection, the first well of four on the pad, about to come on line for the first stage. I met with the Companyman. He said they began to rig up on Tuesday. At that time, they shut in the (9 5/8” x 5 ½”) annulus for digital monitoring during operations. I went in the frack van to take a look at rate and pressures as they come on-line to pump this first stage. Pressures observed before coming online are as follows; (8H) (current well); 235 PSI casing, -4.93 annulus (6H) 0 PSI casing, -22.88 PSI annulus (4H) 19.29 PSI casing, 19.29 PSI annulus and (2H) 28.34 PSI casing, 3.36 PSI annulus. The crew pressure tested @12K, no issues, open wellhead pressure 632 PSI, came online for first stage and took it up to ~4500PSI, no significant increase in pressure on the annulus just a few PSI attrib |
2575926 | Primary Facility | 2017-03-16 | Follow-up Inspection | No Violations Noted | |
2586268 | Primary Facility | 2017-04-11 | Follow-up Inspection | Pending | |
2592165 | Primary Facility | 2017-04-21 | Follow-up Inspection | No Violations Noted | |
2601859 | Primary Facility | 2017-05-22 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:45. The weather conditions were cloudy skies with light to moderate rain falling with temperatures in the lower 60's. I met with Jim Restly, site company man, consultant of Cabot. Mr. Restly stated the following. "Deep Well Services Rig #4 is in the process of squeezing cement on the 6H well. Hydraulic fracturing and frac plug drill outs have been completed on the 2H, 4H, 6H and 8H wells. This particular rig has been here for about a month squeezing the cement, drilling out the cement and running segmented bond logs on the 4H and 6H wells. Currently, only freshwater is being used to squeeze and drill out cement. There are (2) cast iron bridge plugs set in place in the 4H and 6H wells at around (5,800)and (5,900) feet, to hold gas in place while drilling out cement. It has not yet been determined as to when this project will be completed. Once this project is completed, then flowback of the (4) wells should commence." Prior to departing the site, Resource Environmental informed m |
2622938 | Primary Facility | 2017-08-07 | Administrative/File Review | No Violations Noted | Restoration Extension Request received on 3AUG2017. |
2725251 | Primary Facility | 2018-05-01 | Routine/Complete Inspection | No Violations Noted | I inspected the Howell on May 1, 2018 for a routine complete inspection. The wells associated with this site are as follows: 115-22172, 115-22173, 115-22174, 115-22175. The wells were properly labeled.
The fill slope was stable but repaired with riprap in various locations. It was well vegetated elsewhere. The cut slope was well vegetated. The pad surface and access road were stable and the entrance showed evidence of recent minor repair. There were no erosional issues apparent. There were no violations |
For data sources see[8]