If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22466 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.659844,"lon":-75.860581,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155066 | |
Farm/Lease Name: DIAZ M 055 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-03-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.659844 | |
Longitude: -75.860581 |
Date | Event |
---|---|
2018-03-23 | New Permit Application |
2018-09-15 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 18,229.00 | 2 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 2.81 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Drill Cuttings | 448.41 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.37 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 3,215.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 849.36 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 17.68 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 10.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 2.39 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 45.48 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.93 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 0.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2770574 | Primary Facility | 2018-08-30 | Preoperation Inspection | No Violations Noted | The site is under construction. I conducted the inspection accompanied by Casey Baldwin (WQS/ET) Perimeter BMPs have been installed in accordance with the approved permit. No violations were noted. If you have any questions, please contact me. |
2833422 | Primary Facility | 2019-01-30 | Drilling/Alteration | No Violations Noted | Arrived on location at 09:30. Weather: 13 degs., Clear, recent snow fall ~ 6". Onsite to perform inspection of (8) newly drilled wells on this pad, the Diaz 051, 052, 053, 054, 055, 056, 057 & 058.
All (8) wells have had the top-hole intervals, surface and intermediate casings, drilled, cased and cemented by the PD #181 rig. Night caps have been installed atop all wells wellheads. (8) annular poly vent tanks and lines have been installed at edge of pad. Operator will be moving Directional Rig onto location in near future to complete drilling these wells to TD. Liner and drill mats were covered with snow restricting access at time of inspection. No obvious concerns or violations were noted. Left location at 11:00. |
For data sources see[7]