X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22474

Well Details

Well ID: 37-115-22474
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 144968
Farm/Lease Name: CARPENETTI R 008
License Status:
Spud Date:
Permit Date: 2018-03-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.662764
Longitude: -75.819803

For data sources see[1][2][3]

Well History

Date Event
2018-03-23 New Permit Application
2018-05-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-15 2019-04-04 7,509 14,540,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.5696 15,940,000.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00007632 105.147
Water 7732-18-5 85 0.000432468 595.833
Acid Inhibitor, KAI-12 Keane Acid Inhibitor formic acid 64-18-6 10 0.00007297 100.539
Cinnamaldehyde 104-55-2 10 0.00007297 100.539
isoproyl alcohol 67-63-0 5 0.00003649 50.269
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000145946 201.078
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007297 100.539
Ethoxylated alcohol 68131-39-5 10 0.00007297 100.539
Ethylene glycol 107-21-1 40 0.000291893 402.156
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000619261 853.188
Acetic acid 64-19-7 5 0.00010321 142.198
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0335541 46229.2
Water 7732-18-5 85 0.19014 261966
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.0693 121,338,000.0
Friction Reducer, KFR-16FW Keane Friction Reducer Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0217553 29973.4
Ammonium Chloride 12125-02-9 1.5 0.00163165 2248
oleic acid diethanolamide 93-83-4 1.5 0.00163165 2248
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00108776 1498.67
Water 7732-18-5 60 0.0652659 89920.1
Scale Inhibitor, KSI-19 Keane Scale Inhibitor Water 7732-18-5 65 0.0107205 14770.2
Methanol 67-56-1 20 0.00329863 4544.69
organic phosphonic salts 15827-60-8 15 0.00247397 3408.51
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471101 649.059
didecyldimethylammonium chloride 7173-51-5 8 0.000707094 974.2
ethanal 64-17-5 2.8 0.000248415 342.253
Glutaral 111-30-8 26.7 0.00236881 3263.63
Water 7732-18-5 56.7 0.00503217 6933.08
Other Chemical(s) Listed Above See Trade Name(s) List Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0217553 29973.4
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007297 100.539
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00108776 1498.67
Glutaral 111-30-8 26.7 0.00236881 3263.63
formic acid 64-18-6 10 0.00007297 100.539
Citric acid 77-92-9 30 0.000619261 853.188
Ammonium Chloride 12125-02-9 1.5 0.00163165 2248
Methanol 67-56-1 20 0.00329863 4544.69
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000145946 201.078
organic phosphonic salts 15827-60-8 15 0.00007632 105.147
oleic acid diethanolamide 93-83-4 1.5 0.00163165 2248
didecyldimethylammonium chloride 7173-51-5 8 0.000707094 974.2
organic phosphonic salts 15827-60-8 15 0.00247397 3408.51
Ethoxylated alcohol 68131-39-5 10 0.00007297 100.539
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471101 649.059
ethanal 64-17-5 2.8 0.000248415 342.253
Water 7732-18-5 85 0.19014 261966
isoproyl alcohol 67-63-0 5 0.00003649 50.269
Cinnamaldehyde 104-55-2 10 0.00007297 100.539

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 2,503,049.00 249 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 3.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,543.73 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 70.70 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.15 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 32.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 3,288.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.08 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 6,921.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2732862 Primary Facility 2018-05-18 Preoperation Inspection No Violations Noted The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch.

For data sources see[8]

References