If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22520 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.813375,"lon":-75.617019,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Gibson Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155277 | |
Farm/Lease Name: PAVELSKI J 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-06-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.813375 | |
Longitude: -75.617019 |
Date | Event |
---|---|
2018-06-22 | New Permit Application |
2018-11-23 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 523,053.00 | 120 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 3.04 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 43.65 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,474.46 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 17.53 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 32,865.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 3.41 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 5,062.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.20 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.39 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2805083 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a pre-operational inspection. Wash rack is installed with water source and power washer on-site. Construction still occurring on access road and well pad. In general, well pad is about 70% complete. As Photo #5 and #6 show, tank/well pad slopes are still under construction and have not had erosion control matting installed yet. Approximately 80% of site covered in snow. All E&S BMP's appear to be installed as per plan. No violations noted. |
2806970 | Primary Facility | 2018-11-27 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection. Met with Tim Magee of United Drilling. United Drilling was on site to drill and run the conductor pipe in the 1H, 3H, 5H and 7H wells. All four wells were drilled to a TD of 94'. The 20" conductor pipe was run in the 1H and 3H wells. They were running the conductor pipe in the 5H when I arrived on site. They plan to run the conductor pipe in the 5H and 7H today and cement all four wells tomorrow. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2844015 | Primary Facility | 2019-02-25 | Drilling/Alteration | No Violations Noted | At time of inspection.
Met with company man Will Dean. PD 181 was on site to drill and run the surface and intermediate casings. There are seven wells to be drilled. The 7H, 5H and 1H wells were drilled with the surface and intermediate casings set and cemented. They were drilling the hole for the intermediate casing of the 3H when I arrived on site. The 2H, 4H and 6H were conductors only. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[7]