If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22565 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.670681,"lon":-75.932719,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155338 | |
Farm/Lease Name: HAUSER J 020 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-10-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.670681 | |
Longitude: -75.932719 |
Date | Event |
---|---|
2018-10-31 | New Permit Application |
2018-11-08 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 2,203,456.00 | 173 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 4.31 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Drill Cuttings | 367.97 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 34,500.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,300.68 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 93.07 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 228.97 Bbl | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 24.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 17.36 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 3.68 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.09 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 31.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2833520 | Primary Facility | 2019-01-04 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:00. The Weather, partly sunny skies, a light breeze, with temperatures near 40 degrees. Nabors Drilling Rig X36 is currently drilling the 6H well at a depth of (1,395.97) feet. Precision Drilling Rig #181 drilled the tophole sections of the Hauser 2H, 4H, 6H, 8H, 10H, 12H, 14H, 18H and 20H wells. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department in reference to the 6H well on 12/31/19. The notification indicates that Nabors X36 would resume drilling on the 6H well at 6:30 PM on 1/1/19. The 6H well is the first well on the pad the Nabors rig has resumed drilling since the Precision rig demobilized from the site.
I met with Tony Ketterling, site company man and consultant of Cabot. The Department received a complaint on 1/3/19. The complainant alleged they had observed oil blowing off a pipe on a truck hauling pipes. The complainant and truck were driving north on State Route 29 in between Lake Walter and Springville on 1/3/1 |
2835903 | Primary Facility | 2019-02-05 | Drilling/Alteration | No Violations Noted | Arrived on location at 12:00. Met w/ Cabot Co. Man, Tony Ketterling. The Nabors X36 Rig was RU on the Hauser 18H well. Rig is presently drilling prod. hole at a depth of 15,480' to a projected TD of 16,067'. Tony anticipates reaching TD and running 5 1/2" prod. casing starting this evening. Casing and cement notice has been received through Greenport system.
- This well is the 6th of 10 wells to be drilled on this pad. The Hauser 2H, 10H, 6H, 16H & 20H wells have been TD'd. After this well is TD'd, the 8H, 14H, 4H & 12H wells will have production intervals drilled and cased to TD. I did not collect any casing or cement info. for any of the previously TD'd wells at time of inspection. Well Records will be submitted. - The top hole sections, surface and intermediate casings, of all 10 wells where previously drilled and cased by the PD 181 Rig. - Review of The 18H wells drillers log and previously set, casing tallies and cement reports did not reveal any obvious concerns or violations noted. Overall, well and l |
For data sources see[7]