X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22570

Well Details

Well ID: 37-115-22570
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Brooklyn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148161
Farm/Lease Name: WILLIAMS D 007
License Status:
Spud Date:
Permit Date: 2018-10-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.763772
Longitude: -75.799783

For data sources see[1][2][3]

Well History

Date Event
2018-10-23 New Permit Application
2019-05-10 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 2,204,315.00 67 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 CABOT OIL & GAS CORP Filter Socks 0.13 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Drill Cuttings 1,692.67 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.25 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 17.37 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 16.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.74 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 170.98 Tons LANDFILL 100933
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 93.56 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 17,329.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 8.10 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2815347 Primary Facility 2018-12-04 Routine/Complete Inspection No Violations Noted Frank Hoehle, DEP O&G WQS out of the Scranton District Office and I, arrived at the well pad section of the site at 12:42. The weather conditions are partly cloudy skies, breezy and quite chilly with temps in the upper 20's. Cabot was in the process of performing an expansion of the well pad, and preparing the well pad for drilling operations scheduled to take place in the spring of 2019. Steve Catalfamo, Professional Geologist and Senior Environmental Health and Safety Specialist of Cabot Oil and Gas, accompanied Mr. Hoehle and I during the inspection. The well pad surface was quite muddy due to recent precipitation events and snow melt. There are a total of (4) wells in production on the well pad, the D Williams 1H, 2H, 3H and 4H. I recorded elevated conductivity levels in water in the production fluid tanks containment structure, and water in the skid sump/collection pan beneath the glycol drain as part of the 1H natural gas production unit (GPU). Staining/corrosion is observed on the production fl

For data sources see[7]

References