If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45312 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.34005,"lon":-79.589431,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Pinegrove Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: STOLTZFUS 2 4040 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-07-10 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.340050 | |
Longitude: -79.589431 |
Date | Event |
---|---|
2013-07-10 | New Permit Application |
2013-09-30 | Performed Spud Operation |
2013-10-01 | Drilling Completion |
2015-02-10 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 0.00 | 0 | 948.37 | 150 | 0 | 150 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 23.89 | 61 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 11.76 | 31 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 129.35 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 23.35 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 2,488.35 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2014 | CATALYST ENERGY INC | Produced Fluid | 2,488.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 9.23 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 9.23 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 42.31 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 428.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | ROAD SPREADING | |
2016 | CATALYST ENERGY INC | Produced Fluid | 428.85 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 9.23 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 42.31 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 944.59 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 172.31 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 130.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2210308 | Primary Facility | 2013-10-03 | Routine/Complete Inspection | No Violations Noted | |
2218131 | Primary Facility | 2013-10-30 | Routine/Complete Inspection | No Violations Noted | |
2376481 | Primary Facility | 2015-06-04 | Site Restoration | No Violations Noted | |
2552470 | Primary Facility | 2017-01-11 | Routine/Complete Inspection | No Violations Noted | |
2552472 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | |
2557593 | Primary Facility | 2017-01-26 | Routine/Complete Inspection | No Violations Noted | |
2557602 | Primary Facility | 2017-01-30 | Routine/Complete Inspection | No Violations Noted | |
2560757 | Primary Facility | 2017-02-06 | Routine/Complete Inspection | No Violations Noted | |
2560792 | Primary Facility | 2017-02-08 | Routine/Complete Inspection | No Violations Noted | |
2563495 | Primary Facility | 2017-02-22 | Routine/Complete Inspection | No Violations Noted | On site for a follow-up inspection. New sorbents have been placed over the area of the release. The leftover material appears to have the consistency of grease. The release is contained and there is no threat of further migration. |
2568492 | Primary Facility | 2017-03-07 | Routine/Complete Inspection | No Violations Noted | Onsite for a follow-up inspection.The release of oil appears to be stable and not migrating. New sorbents have been placed. The remaining petroleum product appears to be a heavy grease like substance. It maybe most beneficial to shovel this substance up to remove it. |
2580990 | Primary Facility | 2017-04-06 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There continues to be a small amount of weathered crude oil seeping from the well site. The cleanup at the well site should continue. |
2584333 | Primary Facility | 2017-04-18 | Routine/Complete Inspection | No Violations Noted | Met with Randy Baker (Catalyst) onsite. The area of the spill has been tilled and fertilizer placed on it. The area should routinely be tilled. The well is producing, labeled, and the annulus is vented. The siphon dam should be removed. |
2602032 | Primary Facility | 2017-06-06 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The area of the release has been seeded and mulched. Vegetation is established. |
2623656 | Primary Facility | 2017-08-08 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. The sorbents that were used to cleanup a previous oil release are still on location and should be disposed of. There are no E&S issues. |
For data sources see[7]