If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45456 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.601206,"lon":-79.548411,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Allegheny Township | |
Operator Name: PENNFIELD ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: T L WRIGHT1717 | |
License Status: Plugged and Abandoned | |
Spud Date: 2014-02-10 | |
Permit Date: 2013-11-13 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.601206 | |
Longitude: -79.548411 |
Date | Event |
---|---|
2013-11-13 | New Permit Application |
2014-02-10 | Performed Spud Operation |
2014-02-15 | Drilling Completion |
2014-02-28 | Perforation |
2014-03-01 | Performed Stage 1 of Stimulation |
2014-03-01 | Performed Stage 2 of Stimulation |
2014-03-01 | Performed Stage 3 of Stimulation |
2014-03-01 | Performed Stage 4 of Stimulation |
2014-03-01 | Performed Stage 5 of Stimulation |
2014-03-01 | Performed Stage 6 of Stimulation |
2014-03-01 | Performed Stage 7 of Stimulation |
2014-03-01 | Performed Stage 8 of Stimulation |
2014-03-01 | Performed Stage 9 of Stimulation |
2015-02-10 | Newly Drilled |
2018-03-09 | Begin Plugging |
2018-03-09 | Finished Plugging |
2019-04-08 | Fully Plugged |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-03-01 | 1 | Sand | 0 | 1,360 | 1,510 |
2014-03-01 | 2 | Sand | 0 | 2,000 | 3,750 |
2014-03-01 | 3 | Sand | 0 | 1,720 | 3,125 |
2014-03-01 | 4 | Sand | 0 | 2,750 | 3,140 |
2014-03-01 | 5 | Sand | 0 | 2,840 | 3,900 |
2014-03-01 | 6 | Sand | 0 | 2,585 | 4,000 |
2014-03-01 | 7 | Sand | 0 | 1,600 | 2,360 |
2014-03-01 | 8 | Sand | 0 | 1,980 | 2,100 |
2014-03-01 | 9 | Sand | 0 | 2,400 | 2,200 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | SYLVAN ENERGY LLC | 0.00 | 0 | 94.53 | 246 | 0.00 | 0 |
2015 | TRIMONT ENERGY LLC | 0.00 | 0 | 5.13 | 7 | 0.00 | 0 |
2016 | TRIMONT ENERGY LLC | 0.00 | 0 | 20.00 | 25 | 0.00 | 0 |
2017 | PENNFIELD ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | SYLVAN ENERGY LLC | Produced Fluid | 1,318.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SYLVAN ENERGY LLC | Produced Fluid | 1,394.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2014 | SYLVAN ENERGY LLC | Produced Fluid | 1,394.00 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | TRIMONT ENERGY LLC | Produced Fluid | 110.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | TRIMONT ENERGY LLC | Produced Fluid | 110 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2244207 | Primary Facility | 2014-02-10 | Routine/Complete Inspection | No Violations Noted | |
2244246 | Primary Facility | 2014-02-10 | Drilling/Alteration | No Violations Noted | |
2244479 | Primary Facility | 2014-02-11 | Drilling/Alteration | Violation(s) Noted | |
2245791 | Primary Facility | 2014-02-14 | Routine/Complete Inspection | No Violations Noted | |
2249417 | Primary Facility | 2014-02-28 | Routine/Partial Inspection | No Violations Noted | |
2249915 | Primary Facility | 2014-02-25 | Routine/Complete Inspection | No Violations Noted | |
2249924 | Primary Facility | 2014-02-28 | Routine/Complete Inspection | No Violations Noted | |
2328729 | Primary Facility | 2014-12-15 | Administrative/File Review | No Violations Noted | |
2357916 | Primary Facility | 2015-04-02 | Routine/Complete Inspection | No Violations Noted | |
2426743 | Primary Facility | 2015-11-20 | Site Restoration | No Violations Noted | |
2493984 | Primary Facility | 2016-06-15 | Site Restoration | No Violations Noted | |
2655870 | Primary Facility | 2017-11-01 | Routine/Partial Inspection | No Violations Noted | Inspection shows well equipped with rods, tubing, & pump jack with no motor. Annulus equipped to produce gas into sales line and produce gas to pump jack motor. Zero pounds indicated on gauge equipped on the annulus. Appearance of equipment would indicate well has not been produced for a while. |
2693540 | Primary Facility | 2018-02-12 | Routine/Partial Inspection | No Violations Noted | NOI received on 2/12/18. Operator to notify OGI of scheduled plugging. On site to verify information and coordinates. |
2704116 | Primary Facility | 2018-03-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | NOI received 2/12/18. Inspection shows contractor tearing down after setting the cement plugs. No pit on site fluids contained in a steel tank. |
2706032 | Primary Facility | 2018-03-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Previous reports showed cement plugs set. I received a call from Matt Ducket on 3/13/18 that a wire was run in the well bore and determined that cement top was not where it needed to be. Rig was scheduled to set back up over the well bore on 3/14/18 and add additional cement. Inspection shows well has been top holed with monument buried below the surface. Pump jack remains on site with no pit on location. |
2729442 | Primary Facility | 2018-05-09 | Administrative/File Review | No Violations Noted | Certificate of Plugging received April 19, 2018. Certificate did not have all the required signatures required under 78.124. Emailed Matt Duckett concerning the signature. Received the required signatures on Certificate of Plugging on May 2, 2018. Operator supplied logs in meeting with Matt Duckett, Doug Welsh, and myself to verify where the cement plugs were set. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2244479 | 688632 | 02/11/2014 | 2014-02-11 | OGA 3211(F1) - Failure to notify DEP or surface landowner or local political subdivision 24 hours prior to commencement of drilling. Failure to electronically notify DEP. Failure to re-notify DEP. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
688632 | 307570 | NOV - Notice of Violation | Administrative Close Out | 2014-02-20 |
For data sources see[8]