If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-46147 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.382247,"lon":-79.770036,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Franklin City | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW LOT 82 | |
License Status: Active | |
Spud Date: 2017-06-26 | |
Permit Date: 2017-03-09 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.382247 | |
Longitude: -79.770036 |
Date | Event |
---|---|
2016-06-28 | Drilling Completion |
2017-03-09 | New Permit Application |
2017-06-26 | Performed Spud Operation |
2017-08-09 | Performed Stage 1 of Stimulation |
2017-08-09 | Performed Stage 7 of Stimulation |
2017-08-09 | Performed Stage 8 of Stimulation |
2019-06-03 | Newly Drilled |
2019-08-07 | Performed Stage 2 of Stimulation |
2019-08-07 | Performed Stage 3 of Stimulation |
2019-08-07 | Performed Stage 4 of Stimulation |
2019-08-07 | Performed Stage 5 of Stimulation |
2019-08-07 | Performed Stage 6 of Stimulation |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-08-09 | 1 | Sand | 36,288 | 1,400 | 2,600 |
2019-08-07 | 2 | Sand | 36,288 | 1,500 | 3,400 |
2019-08-07 | 3 | Sand | 36,288 | 1,600 | 3,100 |
2019-08-07 | 4 | Sand | 36,288 | 1,600 | 4,000 |
2019-08-07 | 5 | Sand | 36,288 | 1,900 | 3,900 |
2019-08-07 | 6 | Sand | 36,288 | 1,700 | 3,300 |
2017-08-09 | 7 | Sand | 36,288 | 1,400 | 1,900 |
2017-08-09 | 8 | Sand | 36,288 | 1,300 | 2,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CATALYST ENERGY INC | Produced Fluid | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,102.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 358.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 198.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 94.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 125.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2603575 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
2607869 | Primary Facility | 2017-06-27 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. Currently drilling the well utilizing a lined pit. The pit has greater than two feet of freeboard. The site is stable and has been temporarily stabilized. There are areas of the access road that are soft and rutted. The roads and sites should be monitored to prevent sediment from entering the ditches. |
2608149 | Primary Facility | 2017-06-27 | Drilling/Alteration | No Violations Noted | |
2609260 | Primary Facility | 2017-06-29 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The well is drilled utilizing a lined pit that has greater than two feet of freeboard. The site is stable, there are no E&S issues. |
2609626 | Primary Facility | 2017-06-28 | Drilling/Alteration | No Violations Noted | |
2616939 | Primary Facility | 2017-07-19 | Administrative/File Review | No Violations Noted | |
2617962 | Primary Facility | 2017-07-24 | Administrative/File Review | No Violations Noted | |
2623431 | Primary Facility | 2017-08-08 | Drilling/Alteration | No Violations Noted | |
2623677 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently stimulating the well, fluids are being properly handled. The pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues. |
For data sources see[8]