If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-22357 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.082591,"lon":-80.012473,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: West Pike Run Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: | |
Farm/Lease Name: DEEMS 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2006-05-22 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.082591 | |
Longitude: -80.012473 |
Date | Event |
---|---|
2006-05-22 | New Permit Application |
2006-10-11 | Performed Spud Operation |
2006-10-17 | Drilling Completion |
2014-07-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | RICHARD H BURKLAND | 3,385.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | RICHARD H BURKLAND | 3,032.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | 3,072.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2014 | 2,481.50 | 365 | 0.00 | 0 | 0.00 | 0 | |
2015 | 1,014.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2016 | 2,120.00 | 363 | 0.00 | 0 | 0.00 | 0 | |
2017 | RICE DRILLING B LLC | 1,795.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,602.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 706.00 | 184 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1638132 | Primary Facility | 2006-10-13 | Drilling/Alteration | No Violations Noted | PIT & E&S OK. |
1765414 | Primary Facility | 2009-01-21 | Site Restoration | No Violations Noted | permanent stabilization complete |
1880640 | Primary Facility | 2010-04-20 | Routine/Complete Inspection | No Violations Noted | producing gas, tag e/s ok |
For data sources see[6]