X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-22586

Well Details

Well ID: 37-125-22586
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: PATRIOT EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: D SPESAK 5
License Status: ACTIVE
Spud Date:
Permit Date: 2007-02-15
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.165218
Longitude: -79.938931

For data sources see[1][2][3]

Well History

Date Event
2007-02-15 New Permit Application
2007-03-28 Performed Spud Operation
2007-04-02 Drilling Completion
2008-01-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 PATRIOT EXPLORATION CORP 2511.00 365 0.00 0 0.00 0
2008 PATRIOT EXPLORATION CORP 2005.00 359 0.00 0 0.00 0
2009 PATRIOT EXPLORATION CORP 716.00 365 0.00 0 0.00 0
2010 PATRIOT EXPLORATION CORP 914.00 365 0.00 0 0.00 0
2011 PATRIOT EXPLORATION CORP 285.00 365 0.00 0 0.00 0
2012 PATRIOT EXPLORATION CORP 42.00 365 0.00 0 0.00 0
2013 PATRIOT EXPLORATION CORP 16.00 365 0.00 0 0.00 0
2014 PATRIOT EXPLORATION CORP 16.00 365 0.00 0 0.00 0
2015 PATRIOT EXPLORATION CORP 7.00 176 0.00 0 0.00 0
2016 PATRIOT EXPLORATION CORP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PATRIOT EXPLORATION CORP Produced Fluid 19 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 PATRIOT EXPLORATION CORP Produced Fluid 19.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1704549 Primary Facility 2008-05-02 Routine/Complete Inspection No Violations Noted follow up to 4-11-08 inspection. recieved call that work was completed. visit to confirm, final stabilization is complete.
1704972 Primary Facility 2008-04-11 Site Restoration No Violations Noted site restoration insp. equipped for production, tag ok, site restored small issues to be addressed.

For data sources see[7]

References