If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-23362 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.409216,"lon":-80.310248,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Robinson Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: DANIELS 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-10-31 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.409216 | |
Longitude: -80.310248 |
Date | Event |
---|---|
2008-10-31 | New Permit Application |
2008-11-06 | Performed Spud Operation |
2008-11-11 | Drilling Completion |
2009-04-29 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | PENNECO OIL CO INC | 7555.00 | 213 | 29.00 | 213 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 17,652.00 | 334 | 16.45 | 334 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 18,792.00 | 365 | 7.00 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 18,720.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 16,262.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 14,686.00 | 365 | 11.45 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 14,753.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 8,046.00 | 182 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 924.00 | 335 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | PENNECO OIL CO INC | Drilling | 400.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | PENNECO OIL CO INC | Brine | 20.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 77.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Produced Fluid | 38.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | PENNECO OIL CO INC | Produced Fluid | 77.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Produced Fluid | 86.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 86 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 60 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 84.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 84 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2598164 | Primary Facility | 2015-12-17 | Routine/Complete Inspection | No Violations Noted | Visited site w/ representative of RETTEW as part of the Southern Beltway Project. Wellhead is intact and not leaking; tubinghead w/ 2 1/2" tubing. Well compressor operating, tank fluid level good. Location is flat and graveled just off access road. (Natural well completed 2008) |
2598171 | Primary Facility | 2017-03-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Penneco removed all production equipment. Pad is ready for rig mob. |
2598175 | Primary Facility | 2017-04-12 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Met w/ Yost personnel at site. Rig scheduled to mob in near future. |
2598180 | Primary Facility | 2017-04-17 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost is blowing down the well to prepare for site preparation and rig mob. |
2598189 | Primary Facility | 2017-04-18 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost mobilized rig, doghouse, w/ more to arrive. Had to use rig mats, due to spongy location. |
2598192 | Primary Facility | 2017-04-24 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost in process of TIH w/ tubing to tag TOC of bottom hole plug that was set. |
2598195 | Primary Facility | 2017-04-25 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost loaded hole, then rigged up TIMCO, who tagged TOC @1031 feet. Bond logs run on 7" casing seem to indicate poor bond, so Yost will attempt to pull casing after getting sub for 7" casing. (Were unable to pull casing, so will perf before cementing to surface.) |
2598198 | Primary Facility | 2017-04-27 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost is rigged down after plugging well to surface. |
For data sources see[7]