X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27684

Well Details

Well ID: 37-125-27684
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Fallowfield Township
Operator Name: EQT PROD CO
Well Pad ID: 145606
Farm/Lease Name: KEVECH 593729
License Status:
Spud Date:
Permit Date: 2015-06-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.166883
Longitude: -79.981067

For data sources see[1][2][3]

Well History

Date Event
2015-06-25 New Permit Application
2015-07-07 Performed Spud Operation
2015-08-16 Drilling Completion
2015-09-29 Perforation
2015-09-29 Performed Stimulation
2016-03-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-29 2015-10-04 7,595 6,814,960 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 NALCO FFR730 Keane Group Friction Reducer Oxyalkylated Alcohol A Proprietary 5 0.00298159 1895.71
EC6330A Keane Group Scale Inhibitor Sodium Phosphate, Tribasic 7601-54-9 5 0.00122797 780.751
Ethylene Glycol 107-21-1 5 0.00122797 780.751
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 89.447 56,870,900.0
MC MX 437-5 Multi-Chem Group Calcium nitrate solution Calcium Nitrate 10124-37-5 60 0.0571039 36307
AI 250 Keane Group Acid Corrosion Inhibitor Glycol ethers 111-76-2 40 0.000193608 123.097
Isopropyl alcohol 67-63-0 40 0.000193608 123.097
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00004840 30.774
Propargyl alcohol 107-19-7 40 0.000193608 123.097
Ethoxylated nonylphenol 68412-54-4 13 0.00006292 40.007
Sand (Proppant) Keane Group Proppant Silica Substrate 14808-60-7 100 10.1639 6,462,260.0
Hydrochloric Acid (15%) Keane Group Acidizing Hydrochloric Acid 7647-01-0 15 0.0313842 19954.2

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-29 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 EQT PROD CO 355,784.00 79 0.00 0 0.00 0
2016 EQT PROD CO 2,141,013.00 366 0.00 0 0.00 0
2017 EQT PROD CO 1,157,990.00 365 0.00 0 0.00 0
2018 EQT PROD CO 707,340.00 359 0.00 0 0.00 0
2019 EQT PROD CO 386,860.00 152 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Fracturing Fluid Waste 4.07 Tons LANDFILL SWF 1032-WV0109
2015 EQT PROD CO Drilling Fluid Waste 2,900.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracturing Fluid Waste 37.49 Tons LANDFILL 101571
2015 EQT PROD CO Drill Cuttings 486.22 Tons LANDFILL 100419
2015 EQT PROD CO Drill Cuttings 492.07 Tons LANDFILL 100663
2015 EQT PROD CO Fracing Fluid Waste 5,110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 500.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Drilling Fluid Waste 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 130.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Fracturing Fluid Waste 100.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 1,796.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Synthetic Liner Materials 17.51 Tons LANDFILL 100419
2017 EQT PROD CO Other Oil & Gas Wastes 44.98 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Other Oil & Gas Wastes 90.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Other Oil & Gas Wastes 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 270.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Soil Contaminated by Oil & Gas Related Spills 12.81 Tons LANDFILL 100277
2017 EQT PROD CO Synthetic Liner Materials 11.39 Tons LANDFILL 100277
2017 EQT PROD CO Soil Contaminated by Oil 12.81 Tons LANDFILL 100277
2017 EQT PROD CO Produced Fluid 316.90 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 236.75 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 464.87 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 146.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 4.62 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Other Oil & Gas Wastes 31.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 9.23 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Other Oil & Gas Wastes 8.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 26.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 49.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 0.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 924.83 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 7.29 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 91.13 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Synthetic Liner Materials 29.98 Tons LANDFILL 100419

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2387137 Primary Facility 2015-07-10 Drilling/Alteration No Violations Noted Himes Diversified auger rig
2393142 Primary Facility 2015-07-24 Drilling/Alteration No Violations Noted Alpha Hunter Drilling Rig #8
2394031 Primary Facility 2015-07-23 Routine/Complete Inspection No Violations Noted On 7/23/15, I inspected the Kevech pad as a routine inspection and made the following observations:
2398188 Primary Facility 2015-08-13 Drilling/Alteration No Violations Noted Orion Drilling Rig #17
2513617 Primary Facility 2016-02-05 Complaint Inspection No Violations Noted On 2/5/16, I performed an incident inspection at the Kevech pad in response to a complaint concerning the site and made the following observations:

•Per the complainant:

    -The pad was built ten feet higher than permitted in order to not breach a coal seam which resulted in the cut slopes of the pad being steeper than permitted.
    -Multiple other pad features were suspected to be improperly constructed and maintained.
    -Concerns were also voiced about the grading and maintenance of the site access road.

•Pad elevation was measured to be 1080-1094 feet above sea level via multiple GPS devices, permitted pad height is 1085. •Site vegetation was noted to be sparse in areas, particularly north and east of the pad as well as on the southern and western cut slopes. •Badly damaged and partially destroyed remnants of super silt fence were found north and east of the pad. The filter fabric was entirely removed with pieces scattered around the surrounding area, the chain link fencing was also pulled from th

2523983 Primary Facility 2016-04-25 Follow-up Inspection No Violations Noted On 4/25/16, I performed a follow up inspection of the Kevech site accompanied by DEP engineer Emmanuel Nwaobilo in response to complaint 317639 from 2/3/16 (initial inspection took place on 2/5/16) and made the following observations:

•Per DEP engineer Emmanuel Nwaobilo the site’s contours and elevation appeared to be built to permitted plan specification. No violation. •Several heavily vegetated soil piles noted around the base of the pad not found in site plans were added as minor modifications and redlined into plans. No violation. •A corrugated drain pipe was found leading from just below the south east corner of the pad down to the vegetated channel at the bottom of the slope. Erosion channels were found in two separate locations along this pipe. No violation, remediation recommended. •A moderate erosion channel was found entering a ponded area of the diversion channel. •The operator has noted that a number of minor modifications had previously been made and accepted by DEP personnel but documentati

2609286 Primary Facility 2017-06-08 Complaint Inspection No Violations Noted On 6/8/17 an RTNC inspection of the Kevech well site and impoundment in response to a report of waste water being dumped in the freshwater impoundment. The following was observed:

>>No evidence was found at the impoundment of improper dumping.

>>Live fish were seen swimming in the impoundment indicating water remains uncontaminated.

>>The Kevech pad was being used as a staging point for the nearby Harold Haywood pad at the time of inspection.

2728624 Primary Facility 2018-05-10 Routine/Complete Inspection No Violations Noted This well has been completed and is producing.
2742944 Primary Facility 2018-05-09 Routine/Complete Inspection No Violations Noted On 5/9/18 a routine partial inspection of the Kevech pad was conducted in response to drilling notifications and reports of significant activity at the site. The following was observed:

>>Construction of an AST pad was being conducted at the time of inspection. Multiple sections of CFS located around the construction area were noted to be poorly installed leaving gaps underneath or between sections. No violation, immediate remediation is encouraged due to heavy storms predicted for the area.

>>Large amounts of accumulated clay dust on the access road between the area of the new construction and the existing pad may present a safety hazard when wet as well as increased risk of sedimentation in runoff.

>>At the time of inspection operator personnel reported initial cement work had just been completed prior to cellar installation.

2756483 Primary Facility 2018-05-24 Follow-up Inspection No Violations Noted On 5/24/18 a follow up inspection of the Kevech pad was conducted in relation to issues noted in a previous inspection. The following was observed:

>>Deficiencies in implementation of site BMPs had been addressed and satisfactorily remedied. No further concerns were found.

>>Construction of site accessory areas was ongoing at the time of inspection.

>>A section of redundant silt fence was noted to be constructed along an exposed fill slope above the access road, consultation with EQT's Jason Tyler indicated that the fence had been put in place to catch "clumpies". The fence did not change function or flow of water on site. No violation.

2757104 Primary Facility 2018-07-26 Drilling/Alteration No Violations Noted On 7/26/18 a routine complete inspection was conducted of the Kevech well site. The following was observed:

>>A large soil stockpile near the impoundment area of the site was lacking stabilization and appeared to be suffering minor erosion damage in the area used to access the pile. No controls directly down gradient from the access could allow runoff and material to enter the access road and leave the site. Remediation strongly encouraged.

>>Substantial sediment was found accumulated in the collection channel between the large soil stockpile and main access road. Any runoff would likely carry sediment into the pictured under road culvert and into the vegetated strip on the side of the road. Compromised CFS with excess sediment overtopping the control was found directly up gradient along the channel. It is likely the source of the the accumulated sediment. Remediation recommended.

>>Cleanup from drilling activities were ongoing at the time of inspection.

>>Black mud in containment where panels w

2757139 Primary Facility 2018-07-27 Follow-up Inspection No Violations Noted On 7/27/18 a follow up inspection of the Kevech well site was conducted in response to issues noted during a previous inspection. The following was observed:

>>The access point to the large soil stock pile was being stabilized at the time of inspection.

>>CFS between the stock pile and the access road had been cleaned and repaired with added surface matting added above it.

>>The production fluids remained in the containment unit but spilled fluids and contaminated pad materials had been removed.

2853211 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Well appears to be well maintained. Well is temporarily shut in due to low pressure.

For data sources see[9]

References