Well Details

Well ID: 37-125-28042
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: EALY 593338
License Status:
Spud Date:
Permit Date: 2016-09-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.008608
Longitude: -80.393303

For data sources see[1][2][3]

Well History

Date Event
2016-09-28 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2589224 Primary Facility 2017-04-26 Routine/Complete Inspection No Violations Noted On April 26, 2017, the Department performed an inspection of the EQT Ealy well pad site. The site is located in East Finley Twp., Washington Co. The inspection was a routine inspection during construction of the site.

The operator has installed the perimeter E&S BMPs. Two sections of stacked silt sock near the entrance to the site have failed and have become damaged. The operator indicated that Filtrex was coming to the site to repair and improve the failing silt sock. No sediment appeared to have left the site during the damage to the silt sock. The completed slopes of the access road where being stabilized with seed and mulch at time of inspection. Construction of the access road is close to being completed and the operator has started construction of the well pad.

12 wells have been permitted for the site, but have not been drilled yet.

2616002 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted On June 15, 2017, the Department performed an inspection of the EQT Ealy well pad site. Present at time of inspection was Jeff Osburn (EQT). The site is located in East Finley Twp., Washington Co. The inspection was related to a request by the operator for a pre-operational inspection prior to the commencement of drilling on the site.

The Act 9 site ID sign was in place and legible.

The access road to the well pad has been constructed. The operator has completed construction of the well pad and fill slope. During the inspection the operator was in process of stoning the pad in preparation of drilling on site. The operator has started construction of the freshwater impoundment for the site.

All perimeter E&S BMPs have been installed for the site and are functional.

12 wells have been permitted for the site, but have not been drilled yet.

For data sources see[5]