X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28098

Well Details

Well ID: 37-125-28098
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Nottingham Township
Operator Name: EQT PROD CO
Well Pad ID: 149501
Farm/Lease Name: HARBISON 592595
License Status:
Spud Date:
Permit Date: 2016-11-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.228969
Longitude: -80.031944

For data sources see[1][2][3]

Well History

Date Event
2016-11-16 New Permit Application
2016-12-05 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-14 2017-11-08 7,660 7,755,470 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-16 Keane Friction Reducer Listed Below
Hydrochloric Acid (15%) Keane Acidizing Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 50 0.0307558 23353.2
Water Keane Carrier/Base Fluid Water 7732-18-5 100 85.2342 64,719,400.0
KWG-111L Keane Gelling Agent Water 7732-18-5 50 0.0307558 23353.2
Sand (Proppant) Keane Proppant Listed Below
KWBO-2 Keane Breaker Listed Below
BrOX Dirk Thomas Bacteria Treatment Listed Below
KSI-19 Keane Scale Inhibitor Listed Below
KFR-23 Keane Friction Reducer Water 7732-18-5 60 0.00975319 7405.72
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001308 9.932
Trade Secret Proprietary 10 0.00005174 39.288
Isoproyl Alcohol 67-63-0 5 0.00001308 9.932
Ammonium Chloride 12125-02-9 1.5 0.00024383 185.143
Oleic Acid Diethanolamide 93-83-4 1.5 0.00024383 185.143
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001308 9.932
Isoproyl Alcohol 67-63-0 5 0.00001308 9.932
Xylene 1330-20-7 5 0.00001308 9.932
Alcohols, C12-16, ethoxylated 68551-12-2 1 0.000162553 123.429
Trade Secret Proprietary 10 0.00005174 39.288
Alcohols, C12-16, ethoxylated 68551-12-2 1 0.000162553 123.429
Fatty Imidazoline 61790-69-0 5 0.00001308 9.932
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00123023 934.13
Xylene 1330-20-7 5 0.00001308 9.932
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00123023 934.13
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.0123023 9341.3
Oleic Acid Diethanolamide 93-83-4 2 0.00123023 934.13
Oleic Acid Diethanolamide 93-83-4 2 0.00123023 934.13
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.0123023 9341.3
Distilates (Petroleum), Hydrotreated Light 64742-47-8 20 0.00325106 2468.57
Sodium Hydroxide 1310-73-2 5 0.000458175 347.898
Guar Gum 9000-30-0 60 0.000310451 235.73
Methanol 67-56-1 30 0.0063233 4801.36
Solvent Naphtha (Petroleum) Heavy Aliph 64742-96-7 60 0.000310451 235.73
Sodium Persulfate 7775-27-1 99 0.00007312 55.518
Copolymer of 2-propenamide 69418-26-4 20 0.0123023 9341.3
Solvent Naphtha (Petroleum) Heavy Aliph 64742-96-7 60 0.000310451 235.73
Methanol 67-56-1 30 0.0063233 4801.36
Hydrochloric Acid 7647-01-0 15 0.0257657 19564.2
Copolymer of 2-propenamide 69418-26-4 20 0.0123023 9341.3
Methanol 67-56-1 90 0.000235448 178.778
Prop-2-yn-1-ol 107-19-7 5 0.00001308 9.932
Sodium Hypochlorite 7681-52-9 16 0.00146616 1113.28
Ethylbenzene 100-41-4 1 0.00000262 1.986
Ethylbenzene 100-41-4 1 0.00000262 1.986
Prop-2-yn-1-ol 107-19-7 5 0.00001308 9.932
Fatty Imidazoline 61790-69-0 5 0.00001308 9.932
Guar Gum 9000-30-0 60 0.000310451 235.73
Silica Substrate 14808-60-7 100 14.4852 10,998,800.0
Sodium Persulfate 7775-27-1 99 0.00007312 55.518
Methanol 67-56-1 90 0.000235448 178.778
KAI-12 Keane Acid Corrosion Inhibitor Water 7732-18-5 89.7 0.00821967 6241.3

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 758,632.00 47 0.00 0 0.00 0
2018 EQT PROD CO 2,128,598.00 340 0.00 0 0.00 0
2019 EQT PROD CO 1,089,796.00 348 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Drill Cuttings 801.96 Tons LANDFILL 100277
2017 EQT PROD CO Synthetic Liner Materials 13.18 Tons LANDFILL 100277
2017 EQT PROD CO Waste Water Treatment Sludge 2.96 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Drilling Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2017 EQT PROD CO Other Oil & Gas Wastes 130.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 635.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 420.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 EQT PROD CO Produced Fluid 14,155.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 114.10 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Synthetic Liner Materials 2.56 Tons LANDFILL 100663
2017 EQT PROD CO Drilling Fluid Waste 1,430.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 874.97 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 172.75 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Synthetic Liner Materials 1.41 Tons LANDFILL 100419
2018 EQT PROD CO Other Oil & Gas Wastes 11.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 9.89 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Other Oil & Gas Wastes 6.15 Tons LANDFILL 100419
2018 EQT PROD CO Other Oil & Gas Wastes 210.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 417.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EQT PROD CO Produced Fluid 298.24 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 393.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 27.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EQT PROD CO Produced Fluid 46.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 16.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 6.83 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 EQT PROD CO Other Oil & Gas Wastes 5.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 2.94 Bbl INJECTION DISPOSAL WELL 34-119-28776
2019 EQT PROD CO Other Oil & Gas Wastes 5.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 48.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 106.72 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 1,762.54 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 53.09 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 55.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2542745 Primary Facility 2016-12-07 Drilling/Alteration No Violations Noted Cellar Tech auger rig

Drilled a 30” wellbore and set 26” conductor casing at 40 ft. on 12/6/16.

2546016 Primary Facility 2016-12-19 Drilling/Alteration No Violations Noted Alpha Hunter Drilling Rig #6

Moved onto this well on 12/18/16 and resumed drilling at 54 ft. KB. Currently at 157 ft. and drilling ahead.

2546708 Primary Facility 2016-12-22 Drilling/Alteration No Violations Noted Alpha Hunter Drilling Rig #6

The 18 5/8” casing was set at 243 ft. on 12/19/16 and cemented to surface with 30 bbls returned. The 13 3/8” casing was set at 341 ft. on 12/20/16 and grouted to surface above a basket. Coal was found from 287 ft. to 293 ft. A basket was set at 261 ft. Currently at 850 ft. Finished running gyro and picking up MWD tool prior to TIH.

2548589 Primary Facility 2016-12-29 Drilling/Alteration No Violations Noted Alpha Hunter Drilling Rig #6

The 9 5/8” casing was set at 1562 ft. on 12/23/16 and cemented to surface with 43 bbls returned. TD was at 1610 ft. on 12/23/16.

2560628 Primary Facility 2017-02-10 Drilling/Alteration No Violations Noted Fountain Quail Energy Services Rig #6

Reentered this well on 2/5/17 and resumed drilling at 1610 ft. TD was at 5368 ft. on 2/9/17.

2602692 Primary Facility 2017-06-07 Routine/Complete Inspection No Violations Noted
2628017 Primary Facility 2017-08-01 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #277

Moved onto this well on 7/17/17 and resumed drilling at 5383 ft. KB. KOP was at 5383 ft. EOB was at 8983 ft. MD (7522 ft. TVD). TD was at 14,043 ft. MD (7370 ft. TVD) on 7/24/17. The 5 ½” casing was set at 14,030 ft. The estimated TOC is at 4200 ft.

2685550 Primary Facility 2018-01-10 Administrative/File Review No Violations Noted Production crew working on well.
2700231 Primary Facility 2018-02-26 Routine/Complete Inspection No Violations Noted This well has been completed and is now producing.
2720101 Primary Facility 2018-04-19 Incident- Response to Accident or Event In Compliance with Policy On 4/19/18 an incident inspection of the Vivian Harbison Well Site was conducted in response to CTS ID: 333587. The following was observed:

>>On 4/13/18 EQT's Mike Cromley reported a ten gallon spill with cleanup beginning immediately as a vacc truck was present on site at the time of the spill.

>>Further communication with operator personnel indicated a spill of 10 gallons of produced water near the offloading point near the production tanks and that the spill cleanup was completed the same day.

>>Site inspection found no visible evidence of contamination, cleanup appears to have been fully completed in compliance with policy.

For data sources see[8]

References