If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-25641 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.627778,"lon":-79.627083,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Allegheny Township | |
| Operator Name: PATRIOT EXPLORATION CORP | |
| Well Pad ID: | |
| Farm/Lease Name: MASTARONE UNIT 2 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2005-02-03 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.627778 | |
| Longitude: -79.627083 |
| Date | Event |
|---|---|
| 2005-02-03 | New Permit Application |
| 2005-03-29 | Performed Spud Operation |
| 2005-04-04 | Drilling Completion |
| 2005-12-23 | NEWLY DRILLED |
| 2015-09-03 | Drilling Completion |
| 2016-06-07 | FULLY PLUGGED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2005 | PATRIOT EXPLORATION CORP | 1340 | 150 | 0.00 | 0 | 0.00 | 0 |
| 2006 | PATRIOT EXPLORATION CORP | 3507.00 | 373 | 0.00 | 0 | 0.00 | 0 |
| 2007 | PATRIOT EXPLORATION CORP | 2649.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2008 | PATRIOT EXPLORATION CORP | 2291.00 | 358 | 0.00 | 0 | 0.00 | 0 |
| 2009 | PATRIOT EXPLORATION CORP | 1565.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | PATRIOT EXPLORATION CORP | 31.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | PATRIOT EXPLORATION CORP | 20.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | PATRIOT EXPLORATION CORP | 62.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2013 | PATRIOT EXPLORATION CORP | 137.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | PATRIOT EXPLORATION CORP | 16.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | PATRIOT EXPLORATION CORP | 307.00 | 245 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2015 | PATRIOT EXPLORATION CORP | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
| 2015 | PATRIOT EXPLORATION CORP | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1816960 | Primary Facility | 2009-07-30 | Routine/Complete Inspection | No Violations Noted | Well site appears to be in production. There is no evidence of accelerated erosion or sedimentation on the access road or the well site. There is no brine tank located on-site. The operator should continue to monitor the site for erosion and sedimentation. |
| 2000188 | Primary Facility | 2011-08-30 | Complaint Inspection | No Violations Noted | Well appeared to be equipped for production. Observed no accelerated erosion or sedimentation in relation to the well-site or access road. It was noted that the access road to this well and the Mastarone Unit 1 required routine maintenance. |
| 2317065 | Primary Facility | 2014-10-22 | Routine/Complete Inspection | No Violations Noted | Well is piped for operation off 7” x 2” swage and is properly identified. |
| 2408707 | Primary Facility | 2015-09-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Cement and pump trucks arrived at location during time of inspection. Setting cement plugs according to plugging procedure. Tanks (no pit) utilized in plugging. Inspection conducted w/OGI J. Branan. |
For data sources see[7]