If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-26052 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.401611,"lon":-79.349078,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: RUFFNER 8073 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2005-11-17 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.401611 | |
Longitude: -79.349078 |
Date | Event |
---|---|
2005-11-17 | New Permit Application |
2006-06-27 | Performed Spud Operation |
2006-06-29 | Drilling Completion |
2006-07-06 | Perforation |
2007-04-24 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | LINN OPR INC | 14042.00 | 180 | 0.00 | 0 | 0.00 | 0 |
2007 | LINN OPR INC | 16067.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | XTO ENERGY INC | 9425.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 9099.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 6,846.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 4,561.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 5,515.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 5,013.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 5,495.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 3,097.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 3,921.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 2,905.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 3,848.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2006 | LINN OPR INC | Fracking Fluid | 165.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2006 | LINN OPR INC | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2006 | LINN OPR INC | Drilling | 400.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2008 | XTO ENERGY INC | Brine | 90.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 68.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2431897 | Primary Facility | 2015-12-04 | Routine/Complete Inspection | No Violations Noted | Department records indicated that the Restoration Report was received on 8/4/2006. At the time of inspection well appears equipped for production. Site permanently stabilized. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally sound. No E&S issues in relation to site and/or access road. |
For data sources see[7]