If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-26764 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.430491,"lon":-79.323388,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: JACK KABO 3 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-02-15 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.430491 | |
Longitude: -79.323388 |
Date | Event |
---|---|
2007-02-15 | New Permit Application |
2007-07-09 | Performed Spud Operation |
2007-07-13 | Drilling Completion |
2007-07-18 | Perforation |
2007-11-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | PHILLIPS EXPLORATION INC | 2661.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 13263.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 8086.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 8,727.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 6,189.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 6,841.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 5,254.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 4,679.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 4,147.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 3,157.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 2,315.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 3,300.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 28 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 28.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1639930 | Primary Facility | 2007-07-17 | Drilling/Alteration | No Violations Noted | PIT/FREEBOARD, E&S CONTROLS IN PLACE AND OK. |
1837765 | Primary Facility | 2009-10-20 | Routine/Complete Inspection | No Violations Noted | Drilling completed 7/13/2007. The well appears to be in production at the time of inspection. There is approximately 100% perrenial vegetation. No E&S concerns present at the time of inspection. Brine tank is sound and well is in production. The operator should monitor the well site and access road for erosion and sedimentation. |
2512886 | Primary Facility | 2016-08-18 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was shut. Well head casing-equipment-grounded 100 bbl plastic tank looked ok. |
2643143 | Primary Facility | 2017-10-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank tank appears to be structurally sound. NoE&S issues. |
For data sources see[7]