X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28477

Well Details

Well ID: 37-129-28477
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 147700
Farm/Lease Name: AIKENS 5D
License Status:
Spud Date:
Permit Date: 2010-12-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.503869
Longitude: -79.560331

For data sources see[1][2][3]

Well History

Date Event
2010-12-03 New Permit Application
2011-03-10 Performed Spud Operation
2011-04-01 Drilling Completion
2012-02-08 Perforation
2012-08-15 DEVIATED
2013-08-16 REWORKED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-04-03 2012-04-03 7,492 5,675,756

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DWP-690 Calfrac Well Services Friction Reducer Breaker Hydrogen peroxide 7722-84-1 7.00 0.00082000
Hydrochloric Acid Calfrac Well Services Acid Hydrochloric acid 7647-01-0 3.00 1.00
DWP-901 Calfrac Well Services Gel Breaker
Peroxydisulfuric acid, diammonium salt 7727-54-0 95.00 0.00015000
Sand Calfrac Well Services Proppant Sand 100.00 5.03
DWP-204 Clay Control Calfrac Well Services Buffer Formic acid 64-18-6 13.00 0.00019000
Acetic Acid Calfrac Well Services Acid Acetic acid 64-19-7 99.00 0.05
DWP-111 Calfrac Well Services Viscosity Additive Polysaccharide Suspension 0.02
Water Calfrac Well Services Carrier Water 100.00 93.74
DWP-612 Calfrac Well Services Friction Reduction Long Chain Polyacrylamide 0.10
DAP-923 Calfrac Well Services Corrosion Inhibitor Olefin 5.00 0.00003000
Methanol 67-56-1 60.00 0.00030000
Propargyl alcohol 107-19-7 10.00 0.00005000
Fatty Acids 30.00 0.00015000
Polyoxyalkylenes 30.00 0.00015000
Thiourea polymer 68527-49-1 30.00 0.00015000
DWP-944 Calfrac Well Services Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00229000
Polyethylene glycol 25322-68-3 60.00 0.00688000
DAP-901 Calfrac Well Services Scale Inhibitor Methanol 67-56-1 30.00 0.00496000
Phosphoric Acid Ammonium Salt 5.00 0.00083000
Amine Salt 5.00 0.00083000
Organic Phosphonate 30.00 0.00496000
Ammonium chloride 12125-02-9 10.00 0.00165000
Oxyalkylated Polyamine 5.00 0.00083000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2011 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 796,078.00 232 0.00 0 0.00 0
2013 CNX GAS CO LLC 631,274.49 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 464,624.36 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 415,907.56 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 317,213.50 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 241,883.68 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 267,082.40 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 222,987.16 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CONSOL GAS CO Drilling Fluid Waste 1,430.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 CONSOL GAS CO Produced Fluid 37.50 Bbl INJECTION DISPOSAL WELL PAS2D912BSOM
2012 CNX GAS CO LLC Produced Fluid 194.58 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012 CNX GAS CO LLC Fracing Fluid Waste 16.72 Bbl LANDFILL CID: 29084
2012 CNX GAS CO LLC Fracing Fluid Waste 11.02 Bbl LANDFILL 79-00-04
2012 CNX GAS CO LLC Produced Fluid 301.45 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 CNX GAS CO LLC Fracing Fluid Waste 11,825.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 1,462.44 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 100.62 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 CNX GAS CO LLC Produced Fluid 100.62 Bbl INJECTION DISPOSAL WELL 34-007-22038
2013 CNX GAS CO LLC Produced Fluid 221.13 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 CNX GAS CO LLC Produced Fluid 198.90 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Produced Fluid 100.62 Bbl INJECTION DISPOSAL WELL 34-155-23584
2013 CNX GAS CO LLC Produced Fluid 324.07 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 CNX GAS CO LLC Produced Fluid 1,691.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Produced Fluid 141.38 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 CNX GAS CO LLC Produced Fluid 37.44 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 CNX GAS CO LLC Produced Fluid 124.02 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 CNX GAS CO LLC Produced Fluid 120.51 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 CNX GAS CO LLC Produced Fluid 839.98 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 104.13 Bbl INJECTION DISPOSAL WELL 34-119-28776
2015 CNX GAS CO LLC Produced Fluid 334.22 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 1,343.68 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 1,059.76 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC Other Oil & Gas Wastes 112.00 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 225.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 39.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 45.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CNX GAS CO LLC Produced Fluid 48.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 291.36 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 973.69 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 10.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 105.02 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Other Oil & Gas Wastes 46.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Other Oil & Gas Wastes 80.31 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 535.72 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 419.15 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 6,440.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 1,614.84 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes 8.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 726.12 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 102.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2019 CNX GAS CO LLC Produced Fluid 1.53 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Produced Fluid 2,561.99 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 325.59 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Other Oil & Gas Wastes 14.30 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 157.66 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 37.54 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 1,054.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Other Oil & Gas Wastes 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 70.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 152.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 1,049.93 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1957741 Primary Facility 2011-03-15 Drilling/Alteration No Violations Noted Drillers LLC rigging up Speedstar in preparation to drill 26" hole at time of inspection. Previously set 40' of 30" conductor.
1960815 Primary Facility 2011-03-22 Drilling/Alteration No Violations Noted Drilling 12 1/4" hole at 1175' at time of inspection. Pits lined and freeboard maintained. E/S controls in place and functioning as per available plan. Information per drillers log and cement job logs: 253' of 81.3 lb/ft MC-50 20" casing set in 26" hole and cemented with 451 sacks of "A" containing 3% cacl2 & 1/2# flake (yield=1.20 cu ft/sk). Cement returns to surface realized. Shut in at 08:48 03/18/11. 1126' of 54.5 lb/ft J-55 13 3/8" casing set in 17 1/2" hole and cemented with 491 sacks of "A" containing 3% gel, 4% cacl2 & 1/4# flake (yield=1.40 cu ft/sk); tailed by 300 sacks of "A" containing 3% cacl2, 0.8% c-16 fluid loss additive, 0.6% c-47 gas migration control additive, 0.2% c-35 dispersant/friction reducer additive, & 1/4# flake (yield=1.20 cu ft/sk). Cement returns to surface realized with plug landing at 04:18 03-21-11.
1960816 Primary Facility 2011-03-24 Drilling/Alteration No Violations Noted Finishing running 2102' of 36.0 lb/ft J-55 9 5/8" casing in 2130' of 12 1/4" hole at time of inspection. Cemented with 292 sacks of "A" containing 3% gel, 4% cacl2 & 1/4# flake (yield=1.40 cu ft/sk); tailed by 350 sacks of "A" containing 3% cacl2, 0.8% c-16 fluid loss additive, 0.6% c-47 gas migration control additive, 0.2% c-35 dispersant/friction reducer additive, & 1/4# flake (yield=1.20 cu ft/sk). Cement returns to surface realized. Shut in at 14:46 03-24-11. Pits lined and freeboard maintained. E/S controls in place and functioning as per available plan.
1960818 Primary Facility 2011-03-25 Drilling/Alteration No Violations Noted Drillers LLC Speedstar rig shut down waiting on annular BOP replacement at time of inspection. Pits lined and freeboard maintained. E/S controls in place and functioning as per available plan. Inspection conducted w/OGI J. Branan.
1962071 Primary Facility 2011-02-24 Routine/Complete Inspection No Violations Noted Site preparation is underway. Operator is in the process of adding rock to the access road and well pad. Site ID plan and E&S plan located. There are no signs of erosion or sedimentation on the well site or access road. Drilling will begin next week.
1963786 Primary Facility 2011-04-01 Drilling/Alteration No Violations Noted Tripping in hole at time of inspection. Bit change from Hammer bit to Tricone bit. Gas show at approximately 6000'. While tripping in hole, gas show of 1600-1800 units recorded on Pason. 8 3/4" hole at 7063' of proposed 7500' TD. Pits lined and freeboard maintained. E/S controls in place and functioning as per available plan.
2014641 Primary Facility 2011-10-28 Routine/Complete Inspection No Violations Noted Drilling was ongoing on well 129-28474 Aikens 5A. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2076889 Primary Facility 2012-06-15 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated. The Operator indicated that the well was being equipped for production. The associated brine tank and secondary containment appeared to be in sound condition. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2101706 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. The Departments notes the Operator was actively working toward restoring the well pad area as outline in the restoration plan. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2128585 Primary Facility 2013-01-04 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2136492 Primary Facility 2013-02-06 Routine/Complete Inspection No Violations Noted no violations noted
2363490 Primary Facility 2015-04-22 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2393140 Primary Facility 2015-07-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2476265 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2491572 Primary Facility 2016-06-09 Routine/Partial Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2507884 Primary Facility 2016-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2569448 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2605179 Primary Facility 2017-06-14 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. No E& S issues in relation to site and/or access road.
2619270 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted At time of inspection site ID sign on site. PPC plan, ERP, ESCGP and well permit on site.

No E&S issues observed on access road. Well pad rocked, no E&S issues observed. Well head surrounded by cement barriers. Well tag present. Well appears equipped for production. Brine tank located in secondary containment appears structurally sound.

2637360 Primary Facility 2017-09-18 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. Well site is adjacent to unconventional Utica wells that are in preparation to be fractured.
2680067 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2720535 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
2773891 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Well producing.
2836706 Primary Facility 2019-02-06 Routine/Complete Inspection No Violations Noted 2/6/19 - Well appears to be in good working condition.
2842336 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Well appears to be in good working condition.
2843340 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Ten brine tanks on site. Six frac tanks located on site.

For data sources see[8]

References