X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28491

Well Details

Well ID: 37-129-28491
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149242
Farm/Lease Name: SCAIFE 8451H
License Status:
Spud Date:
Permit Date: 2010-12-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.338836
Longitude: -79.131725

For data sources see[1][2][3]

Well History

Date Event
2010-12-14 New Permit Application
2011-12-14 Performed Spud Operation
2012-05-21 Drilling Completion
2012-09-06 Perforation
2014-03-25 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-26 2012-09-26 8,508 5,051,483

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Diethylene glycol monobutyl ether 112-34-5 50.00 0.00018000
Other -(non hazardous) 50.00 0.00018000
100.00
Acid - 7.5 HCl Acid PPG Industries Acid Hydrochloric acid 7647-01-0 7.50 0.03
Other -(non hazardous) 92.50 0.46
Water Water 7732-18-5 100.00 86.84
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor
Other -(non hazardous) 100.00 0.02
Biocide - MC 8520 Multi-Chem Group Biocide 2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00007000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00067000
Clay Stabilizer - ClaChek G Shrieve Clay Stabilizer Water 7732-18-5 30.00 0.02
Not hazardous 70.00 0.05
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer
Other -(non hazardous) 70.00 0.03
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Sand Proppant Quartz 14808-60-7 100.00 12.47
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00400000
Other -(non hazardous) 40.00 0.00270000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 337,287.00 126 0.00 0 0.00 0
2013 XTO ENERGY INC 834,785.00 361 0.00 0 0.00 0
2014 XTO ENERGY INC 453,116.00 332 0.00 0 0.00 0
2015 XTO ENERGY INC 340,523.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 216,144.00 364 0.00 0 0.00 0
2017 XTO ENERGY INC 184,682.00 317 0.00 0 0.00 0
2018 XTO ENERGY INC 181,512.05 365 0.00 0 0.00 0
2019 XTO ENERGY INC 148,302.78 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Produced Fluid 109.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Fracing Fluid Waste 4,240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 211.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Produced Fluid 313.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Drill Cuttings 515.14 Tons LANDFILL 100081
2012 XTO ENERGY INC Produced Fluid 1,316.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Drill Cuttings 419.52 Tons LANDFILL 100434
2012 XTO ENERGY INC Produced Fluid 99.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 91.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 1,050.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 XTO ENERGY INC Produced Fluid 101.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 817.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Fracturing Fluid Waste 35.47 Tons LANDFILL 100434
2013 XTO ENERGY INC Produced Fluid 817.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 934.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 294.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 294.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 1,135.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 365.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 468.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 485.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 160.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 3.44 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 608.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 202.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 350.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2008845 Primary Facility 2011-09-09 Routine/Complete Inspection No Violations Noted Inspection was a request from Randy Cutlip to make minor change to the plans for the well pad access road.
2018967 Primary Facility 2011-11-04 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2026807 Primary Facility 2011-12-15 Routine/Complete Inspection No Violations Noted Spud Inspected. No E&S issues noted.
2026829 Primary Facility 2011-12-15 Routine/Complete Inspection No Violations Noted This was a Spud inspection. No E &S issues noted
2026942 Primary Facility 2011-12-14 Routine/Complete Inspection No Violations Noted ccess road was built/rocked/stable. Some turnouts and piping was added due to concerns of land owner. These minor changes had been marked on the site plans.
2033461 Primary Facility 2011-12-28 Drilling/Alteration No Violations Noted CELLAR, CONDUCTOR, AND 13 3/8 set. RIG GONE, WAITING ON BIG RIG.
2033464 Primary Facility 2011-01-05 Drilling/Alteration No Violations Noted CELLAR, CONDUCTOR, AND 13 3/8 set. RIG GONE, WAITING ON BIG RIG.
2033469 Primary Facility 2011-12-14 Drilling/Alteration No Violations Noted PHILLIPS RIG RIGGING UP TO SPUD
2037035 Primary Facility 2012-01-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2049107 Primary Facility 2012-03-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052152 Primary Facility 2012-03-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2054065 Primary Facility 2012-03-27 Routine/Complete Inspection No Violations Noted No E&S violations noted.
2061727 Primary Facility 2012-04-10 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2066089 Primary Facility 2012-04-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2067739 Primary Facility 2012-05-09 Routine/Complete Inspection No Violations Noted On 5/8/12, Ran 9 5/8" casing to 2223'. TD of hole =2250'; Cement with 761 sks of class A cmt.; 1%CaCl2 ; 15.6 #/gal; Yield-1.19 cuft/sk; 5.19 gal/sk; cement returns; 35 % excess calculated; 30 bbls back to surface; plug down and bumped at 1250psi. 8 hrs wait on cement; On 5/9, tripping back in hole; drilling on air @ 3929'. FYI: RTD - 13571' and KOP- 7750'
2068984 Primary Facility 2012-05-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2070097 Primary Facility 2012-05-23 Drilling/Alteration No Violations Noted UDI rig 61 moving off of pad.
2073323 Primary Facility 2012-06-05 Routine/Complete Inspection No Violations Noted Well is drilled; location is cleared and being prepped for fracing; E&S controls in place;
2077452 Primary Facility 2012-05-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2093019 Primary Facility 2012-08-20 Routine/Complete Inspection No Violations Noted Routine inspection. Advised XT to water the roads to control road dust.
2106218 Primary Facility 2012-10-10 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2121182 Primary Facility 2012-12-05 Routine/Complete Inspection No Violations Noted
2171875 Primary Facility 2013-06-04 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2199130 Primary Facility 2013-08-28 Site Restoration No Violations Noted On 8/28/13 this one well pad was inspected. The site has one producing Marcellus well.
2203235 Primary Facility 2012-09-06 Routine/Complete Inspection No Violations Noted
2487652 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2681004 Primary Facility 2018-01-10 Routine/Partial Inspection No Violations Noted Routine partial inspection due to snow cover. Well appears equipped for production. Well head surrounded by cement barriers and security fence
2688069 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.

For data sources see[8]

References