If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-28501 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.607494,"lon":-79.679761,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Allegheny Township | |
| Operator Name: BARON GROUP INC | |
| Well Pad ID: | |
| Farm/Lease Name: STEWART 8 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2010-12-30 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.607494 | |
| Longitude: -79.679761 |
| Date | Event |
|---|---|
| 2010-12-30 | New Permit Application |
| 2011-08-30 | Performed Spud Operation |
| 2011-09-07 | Drilling Completion |
| 2011-09-20 | Perforation |
| 2012-03-28 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2010 | BARON GROUP INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | BARON GROUP INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | BARON GROUP INC | 7,110.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | BARON GROUP INC | 6,023.55 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | BARON GROUP INC | 5,540.92 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | BARON GROUP INC | 2,763.00 | 171 | 0.00 | 0 | 0.00 | 0 |
| 2016 | BARON GROUP INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | BARON GROUP INC | 7,141.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | BARON GROUP INC | 6,476.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | BARON GROUP INC | Fracing Fluid Waste | 1,154.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
| 2011 | BARON GROUP INC | Drilling Fluid Waste | 2,841.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
| 2012 | BARON GROUP INC | Produced Fluid | 10.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
| 2019 | BARON GROUP INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2001433 | Primary Facility | 2011-09-06 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Drill pit located onsite and it had more than the required two feet of lined freeboard. E&S controls had been implemented properly and no accelerated erosion or sedimentation was observed in relation to the well-site or access road. Verification that the E&S plan is located onsite could not be made due to the fact the tube could not be opened. The operator should monitor the access road closely to insure no accelerated erosion issues occur with the road due to the current and near future weather. |
| 2010427 | Primary Facility | 2011-10-12 | Drilling/Alteration | No Violations Noted | Well shut in on 4 1/2" x 2" swage. 7" x 4 1/2" annulus open. Well site restored, seeded and mulched. |
| 2021080 | Primary Facility | 2011-11-21 | Routine/Complete Inspection | No Violations Noted | Drilling was completed, well was equipped for and in production. Brine tank located onsite and it appeared to be in sound condition. The site had been regraded and vegetation had begun to grow. The vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the access road or well-site. |
| 2053765 | Primary Facility | 2012-03-26 | Site Restoration | No Violations Noted | Well appears to drilled and equipped for production. Well apparatus and brine tank located on site appear to be in sound condition. There was no accelerated erosion observed on well pad or access road. The Department suggests the Operator continue to monitor the site until the 70% vegetative coverage criteria met. |
| 2647113 | Primary Facility | 2017-10-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within earthen dike and appears to be structurally sound. No E&S issues. |
For data sources see[7]