{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.508433,"lon":-79.559208,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148391 | |
Farm/Lease Name: GAUT 4A | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.508433 | |
Longitude: -79.559208 |
Date | Event |
---|---|
2011-07-05 | New Permit Application |
2011-08-09 | Performed Spud Operation |
2011-09-08 | Drilling Completion |
2011-10-04 | New Permit Application |
2012-03-04 | Drilling Completion |
2012-04-25 | Perforation |
2012-08-15 | DEVIATED |
2013-11-08 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-05-16 | 2012-05-16 | 7,504 | 9,325,106 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acetic Acid | Calfrac Well Services | Acid | Acetic acid | 64-19-7 | 99.00 | 0.04 | |
Sand | Calfrac Well Services | Proppant | Sand | 100.00 | 5.00 | |||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00138000 | ||
Phosphoric Acid Ammonium Salt | 5.00 | 0.00069000 | ||||||
Oxyalkylated Polyamine | 5.00 | 0.00069000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00413000 | |||||
Organic Phosphonate | 30.00 | 0.00413000 | ||||||
Amine Salt | 5.00 | 0.00069000 | ||||||
DWP-690 | Calfrac Well Services | Friction Reducer Breaker | Hydrogen peroxide | 7722-84-1 | 7.00 | 0.00064000 | ||
DAP-925 | Calfrac Well Services | Corrosion Inhibitor | Fatty Acids | 30.00 | 0.00014000 | |||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00005000 | |||||
Olefin | 5.00 | 0.00002000 | ||||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00014000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00028000 | |||||
Polyoxyalkylenes | 30.00 | 0.00014000 | ||||||
Water | Calfrac Well Services | Carrier | Water | 100.00 | 93.87 | |||
DWP-612 | Calfrac Well Services | Friction Reduction | Long Chain Polyacrylamide | 0.10 | ||||
Hydrochloric Acid | Calfrac Well Services | Acid | Hydrochloric acid | 7647-01-0 | 3.00 | 0.93 | ||
DWP-944 | Calfrac Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.00564000 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00188000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 668,864.00 | 194 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 792,040.18 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 555,847.54 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 467,410.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 380,951.15 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 245,114.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 251,519.36 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CNX GAS CO LLC | 231,993.14 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CNX GAS CO LLC | Produced Fluid | 550.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 0250050885 |
2012 | CNX GAS CO LLC | Produced Fluid | 281.91 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2012 | CNX GAS CO LLC | Produced Fluid | 59.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CNX GAS CO LLC | Drill Cuttings | 248.38 Tons | LANDFILL | 100434 |
2012 | CNX GAS CO LLC | Drilling Fluid Waste | 726.98 Bbl | LANDFILL | 100280 |
2012 | CNX GAS CO LLC | Produced Fluid | 99.22 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2012 | CNX GAS CO LLC | Produced Fluid | 560.34 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | CNX GAS CO LLC | Fracing Fluid Waste | 10,010.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CNX GAS CO LLC | Drilling Fluid Waste | 239.75 Bbl | LANDFILL | 0250050885 |
2012 | CNX GAS CO LLC | Drill Cuttings | 856.40 Tons | LANDFILL | 100280 |
2013 | CNX GAS CO LLC | Produced Fluid | 28,948.44 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CNX GAS CO LLC | Produced Fluid | 114.66 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | CNX GAS CO LLC | Produced Fluid | 317.79 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2013 | CNX GAS CO LLC | Produced Fluid | 301.41 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | CNX GAS CO LLC | Produced Fluid | 508.76 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2013 | CNX GAS CO LLC | Produced Fluid | 805.00 Bbl | INJECTION DISPOSAL WELL | 34-167-23862 |
2013 | CNX GAS CO LLC | Produced Fluid | 355.18 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2013 | CNX GAS CO LLC | Produced Fluid | 1,028.77 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2013 | CNX GAS CO LLC | Fracing Fluid Waste | 67,431.32 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CNX GAS CO LLC | Produced Fluid | 435.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | CNX GAS CO LLC | Produced Fluid | 102.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2013 | CNX GAS CO LLC | Produced Fluid | 201.24 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | CNX GAS CO LLC | Produced Fluid | 3,235.47 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2014 | CNX GAS CO LLC | Produced Fluid | 3,035.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CNX GAS CO LLC | Produced Fluid | 104.35 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | CNX GAS CO LLC | Produced Fluid | 32.79 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2014 | CNX GAS CO LLC | Produced Fluid | 121.68 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | CNX GAS CO LLC | Produced Fluid | 316.20 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | CNX GAS CO LLC | Produced Fluid | 445.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | CNX GAS CO LLC | Produced Fluid | 33.93 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | CNX GAS CO LLC | Produced Fluid | 1,256.07 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | CNX GAS CO LLC | Produced Fluid | 18.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2015 | CNX GAS CO LLC | Produced Fluid | 4.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2015 | CNX GAS CO LLC | Produced Fluid | 6.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2015 | CNX GAS CO LLC | Produced Fluid | 829.34 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | CNX GAS CO LLC | Produced Fluid | 4.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2015 | CNX GAS CO LLC | Produced Fluid | 108.51 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2015 | CNX GAS CO LLC | Produced Fluid | 12.00 Bbl | INJECTION DISPOSAL WELL | 34-167-23862 |
2015 | CNX GAS CO LLC | Produced Fluid | 238.22 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | CNX GAS CO LLC | Produced Fluid | 4.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2015 | CNX GAS CO LLC | Produced Fluid | 2,309.28 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Produced Fluid | 2,303.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Produced Fluid | 369.41 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017 | CNX GAS CO LLC | Produced Fluid | 121.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 1,438.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CNX GAS CO LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CNX GAS CO LLC | Produced Fluid | 311.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017 | CNX GAS CO LLC | Produced Fluid | 115.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2017 | CNX GAS CO LLC | Produced Fluid | 116.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-16 |
2017 | CNX GAS CO LLC | Produced Fluid | 14.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 40.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017 | CNX GAS CO LLC | Produced Fluid | 146.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017 | CNX GAS CO LLC | Produced Fluid | 675.71 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017 | CNX GAS CO LLC | Produced Fluid | 125.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-32 |
2018 | CNX GAS CO LLC | Produced Fluid | 262.50 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 7.86 Bbl | REUSE (AT WELL PAD) | |
2018 | CNX GAS CO LLC | Produced Fluid | 196.14 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 4.82 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | OHR000015792 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 31.42 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Produced Fluid | 73.07 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018 | CNX GAS CO LLC | Produced Fluid | 1,656.75 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Produced Fluid | 513.65 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 13.85 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Produced Fluid | 248.89 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Produced Fluid | 79.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Produced Fluid | 244.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CNX GAS CO LLC | Produced Fluid | 58.83 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Produced Fluid | 306.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CNX GAS CO LLC | Produced Fluid | 161.42 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Produced Fluid | 925.32 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1996467 | Primary Facility | 2011-08-16 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Conductor pipe had been drilled into place for thewell. Site had been constructed as outlined in the E&S plan within the ESCGP. Operator had also implemented hay bales behind the silt socks on the side of the well pad closest to Beaver Run Reservoir. The operator should conitnue to monitor all site and access road erosion controls to insure their continued effectiveness until well development activities are completed. |
1997056 | Primary Facility | 2011-08-16 | Drilling/Alteration | No Violations Noted | Location and preparation work for rigging up Whipstock Rig#22 Speedstar ongoing at time of inspection. Well spud in 08-11-11. Pit unlined and not in use. |
2003034 | Primary Facility | 2011-09-06 | Drilling/Alteration | No Violations Noted | Whipstock Rig#22 Speedstar drilling 8 3/4" hole at 3699' at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. |
2004649 | Primary Facility | 2011-09-19 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2010336 | Primary Facility | 2011-10-07 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conduction w/OGI S. Banks. |
2013351 | Primary Facility | 2011-10-20 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conduction w/OGI S. Banks. |
2014627 | Primary Facility | 2011-10-28 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. A small pit had been constructed onsite and it appeared to contain drill fluids. The pit was properly lined and it had more than the required two feet of lined freeboard. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2047771 | Primary Facility | 2012-03-05 | Incident- Response to Accident or Event | No Violations Noted | Drilling had been completed on 03/04/12. WQS Higgins was notified via phone of a small drilling mud spill to the containement around the drilling rig. Onsite inspection found this to be the case and CNX representative Ryan Coffman confirmed that the spill was approximately 2 barrels (84 gallons) and was effectively addressed by the time of the inspection. |
2076914 | Primary Facility | 2012-06-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and in the beginning phases of stimulation. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum. |
2092865 | Primary Facility | 2012-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and stimulated and being actively equipped for production. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum. |
2101726 | Primary Facility | 2012-09-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and the Operator was actively working to equip the well for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2108703 | Primary Facility | 2012-10-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4A well was drilled and equipped for production. The associated well apparatus and brine tanks located appear to be in sound condition. During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2110428 | Primary Facility | 2012-10-16 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2115657 | Primary Facility | 2012-11-14 | Routine/Complete Inspection | No Violations Noted | No violations noted |
2116164 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2127478 | Primary Facility | 2013-01-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be drilled and equipped for production. The associated well apparatus, brine tanks, and production heaters appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2232486 | Primary Facility | 2013-12-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be plugged while the Operator prepares the site to drill additional wells. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2244025 | Primary Facility | 2014-02-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2250118 | Primary Facility | 2014-02-25 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2268234 | Primary Facility | 2014-05-05 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2363132 | Primary Facility | 2015-04-21 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2368804 | Primary Facility | 2015-05-11 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2376329 | Primary Facility | 2015-06-05 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2377793 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2393129 | Primary Facility | 2015-07-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2439756 | Primary Facility | 2016-01-07 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2477489 | Primary Facility | 2016-04-22 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production unit equipment-tank battery and dike look ok. |
2479386 | Primary Facility | 2016-04-28 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road. |
2491597 | Primary Facility | 2016-06-09 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2569440 | Primary Facility | 2017-03-06 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2627166 | Primary Facility | 2017-08-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Brine tank located within secondary containment and appears to be structurally sound. No E&S issues. |
2682113 | Primary Facility | 2018-01-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2740751 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | 6-13-18 Well producing. |
2773820 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | 9/12/18 Well producing. |
2842314 | Primary Facility | 2019-02-21 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
2842487 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. It appears that temporary BMP's (new, unused) are being stored on-site. Nine brine tanks on site. |