X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28955

Well Details

Well ID: 37-129-28955
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Upper Burrell Township
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC
Well Pad ID: 154469
Farm/Lease Name: ZEUS
License Status: Active
Spud Date: 2019-02-07
Permit Date: 2017-10-17
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 40.579353
Longitude: -79.668440

For data sources see[1][2][3]

Well History

Date Event
2017-10-17 New Permit Application
2018-09-11 MOD
2018-12-20 Performed Spud Operation
2019-03-12 Drilling Completion
2019-04-03 Perforation
2019-04-03 Performed Stage 1 of Stimulation
2019-04-03 Performed Stage 2 of Stimulation
2019-04-03 Performed Stimulation
2019-04-04 Perforation
2019-04-04 Performed Stage 3 of Stimulation
2019-04-04 Performed Stage 4 of Stimulation
2019-04-04 Performed Stage 5 of Stimulation
2019-04-04 Performed Stage 6 of Stimulation
2019-04-05 Perforation
2019-04-05 Performed Stage 10 of Stimulation
2019-04-05 Performed Stage 7 of Stimulation
2019-04-05 Performed Stage 8 of Stimulation
2019-04-05 Performed Stage 9 of Stimulation
2019-04-06 Perforation
2019-04-06 Performed Stage 11 of Stimulation
2019-04-06 Performed Stage 12 of Stimulation
2019-04-06 Performed Stage 13 of Stimulation
2019-04-07 Perforation
2019-04-07 Performed Stage 14 of Stimulation
2019-04-07 Performed Stage 15 of Stimulation
2019-04-07 Performed Stage 16 of Stimulation
2019-04-07 Performed Stage 17 of Stimulation
2019-04-08 Perforation
2019-04-08 Performed Stage 18 of Stimulation
2019-04-08 Performed Stage 19 of Stimulation
2019-04-08 Performed Stage 20 of Stimulation
2019-04-08 Performed Stage 21 of Stimulation
2019-04-08 Performed Stage 22 of Stimulation
2019-04-09 Perforation
2019-04-09 Performed Stage 23 of Stimulation
2019-04-09 Performed Stage 24 of Stimulation
2019-04-09 Performed Stage 25 of Stimulation
2019-04-09 Performed Stage 26 of Stimulation
2019-04-10 Perforation
2019-04-10 Performed Stage 27 of Stimulation
2019-04-10 Performed Stage 28 of Stimulation
2019-04-10 Performed Stage 29 of Stimulation
2019-04-10 Performed Stage 30 of Stimulation
2019-04-11 Perforation
2019-04-11 Performed Stage 31 of Stimulation
2019-04-11 Performed Stage 32 of Stimulation
2019-04-11 Performed Stage 33 of Stimulation
2019-04-11 Performed Stage 34 of Stimulation
2019-04-12 Perforation
2019-04-12 Performed Stage 35 of Stimulation
2019-04-12 Performed Stage 36 of Stimulation
2019-04-12 Performed Stage 37 of Stimulation
2019-04-12 Performed Stage 38 of Stimulation
2019-04-12 Performed Stage 39 of Stimulation
2019-04-13 Perforation
2019-04-13 Performed Stage 40 of Stimulation
2019-04-13 Performed Stage 41 of Stimulation
2019-04-13 Performed Stage 42 of Stimulation
2019-04-13 Performed Stage 43 of Stimulation
2019-04-14 Perforation
2019-04-14 Performed Stage 44 of Stimulation
2019-04-14 Performed Stage 45 of Stimulation
2019-04-14 Performed Stage 46 of Stimulation
2019-04-14 Performed Stage 47 of Stimulation
2019-04-15 Perforation
2019-04-15 Performed Stage 48 of Stimulation
2019-04-15 Performed Stage 49 of Stimulation
2019-04-16 Perforation
2019-04-16 Performed Stage 50 of Stimulation
2019-04-16 Performed Stage 51 of Stimulation
2019-04-16 Performed Stage 52 of Stimulation
2019-04-16 Performed Stage 53 of Stimulation
2019-04-17 Perforation
2019-04-17 Performed Stage 54 of Stimulation
2019-04-17 Performed Stage 55 of Stimulation
2019-04-17 Performed Stage 56 of Stimulation
2019-04-17 Performed Stage 57 of Stimulation
2019-04-18 Perforation
2019-04-18 Performed Stage 58 of Stimulation
2019-04-18 Performed Stage 59 of Stimulation
2019-04-18 Performed Stage 60 of Stimulation
2019-12-05 Deviated

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2019-04-03 1 Sand 13,582,115 8,586 5,998
2019-04-03 2 Sand 13,582,115 8,559 5,804
2019-04-04 3 Sand 13,582,115 8,550 5,718
2019-04-04 4 Sand 13,582,115 8,608 5,682
2019-04-04 5 Sand 13,582,115 8,530 5,539
2019-04-04 6 Sand 13,582,115 8,652 5,979
2019-04-05 7 Sand 13,582,115 8,663 6,210
2019-04-05 8 Sand 13,582,115 8,638 5,616
2019-04-05 9 Sand 13,582,115 8,679 5,721
2019-04-05 10 Sand 13,582,115 8,730 5,850
2019-04-06 11 Sand 13,582,115 8,672 6,081
2019-04-06 12 Sand 13,582,115 8,620 5,823
2019-04-06 13 Sand 13,582,115 8,570 5,885
2019-04-07 14 Sand 13,582,115 8,672 5,898
2019-04-07 15 Sand 13,582,115 8,593 6,103
2019-04-07 16 Sand 13,582,115 8,606 5,928
2019-04-07 17 Sand 13,582,115 8,463 5,847
2019-04-08 18 Sand 13,582,115 8,456 5,769
2019-04-08 19 Sand 13,582,115 8,269 5,742
2019-04-08 20 Sand 13,582,115 8,458 5,544
2019-04-08 21 Sand 13,582,115 8,201 5,413
2019-04-08 22 Sand 13,582,115 8,199 5,550
2019-04-09 23 Sand 13,582,115 8,352 5,861
2019-04-09 24 Sand 13,582,115 8,232 5,539
2019-04-09 25 Sand 13,582,115 8,198 5,609
2019-04-09 26 Sand 13,582,115 8,242 5,632
2019-04-10 27 Sand 13,582,115 8,341 5,908
2019-04-10 28 Sand 13,582,115 8,403 5,729
2019-04-10 29 Sand 13,582,115 8,374 5,553
2019-04-10 30 Sand 13,582,115 8,252 5,686
2019-04-11 31 Sand 13,582,115 8,255 5,760
2019-04-11 32 Sand 13,582,115 8,009 5,396
2019-04-11 33 Sand 13,582,115 7,973 5,575
2019-04-11 34 Sand 13,582,115 7,885 5,634
2019-04-12 35 Sand 13,582,115 8,199 5,763
2019-04-12 36 Sand 13,582,115 8,145 6,808
2019-04-12 37 Sand 13,582,115 7,992 5,472
2019-04-12 38 Sand 13,582,115 7,964 6,468
2019-04-12 39 Sand 13,582,115 8,080 5,825
2019-04-13 40 Sand 13,582,115 7,879 5,555
2019-04-13 41 Sand 13,582,115 7,626 5,214
2019-04-13 42 Sand 13,582,115 7,765 5,296
2019-04-13 43 Sand 13,582,115 7,861 5,687
2019-04-14 44 Sand 13,582,115 8,003 6,225
2019-04-14 45 Sand 13,582,115 8,038 5,619
2019-04-14 46 Sand 13,582,115 7,817 5,576
2019-04-14 47 Sand 13,582,115 8,018 5,974
2019-04-15 48 Sand 13,582,115 8,170 6,093
2019-04-15 49 Sand 13,582,115 8,212 6,169
2019-04-16 50 Sand 13,582,115 8,420 5,873
2019-04-16 51 Sand 13,582,115 7,782 5,479
2019-04-16 52 Sand 13,582,115 7,748 5,652
2019-04-16 53 Sand 13,582,115 7,955 5,970
2019-04-17 54 Sand 13,582,115 7,782 6,133
2019-04-17 55 Sand 13,582,115 7,827 6,008
2019-04-17 56 Sand 13,582,115 7,686 5,869
2019-04-17 57 Sand 13,582,115 7,672 5,948
2019-04-18 58 Sand 13,582,115 7,395 5,754
2019-04-18 59 Sand 13,582,115 7,807 5,795
2019-04-18 60 Sand 13,582,115 7,390 5,907

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC 2,101,539.00 214 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 116.79 Tons LANDFILL 100280
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drilling Fluid Waste 1,245.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Other Oil & Gas Wastes 137.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 7,351.98 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 878.13 Tons LANDFILL 100280
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 139.98 Tons LANDFILL 100172
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 1,410.00 Bbl REUSE (AT WELL PAD)
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 304.07 Tons LANDFILL 100594
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 237.53 Tons LANDFILL 100277
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 42.76 Tons LANDFILL 100280
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Synthetic Liner Materials 6.68 Tons LANDFILL 100280

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2819795 Primary Facility 2018-12-27 Routine/Complete Inspection No Violations Noted Conductor and cellar set.
2827341 Primary Facility 2019-01-16 Routine/Complete Inspection No Violations Noted Conductor and cellar set.

1/16/19 - Preparing to move rig on site.

2843582 Primary Facility 2019-02-22 Routine/Complete Inspection No Violations Noted At the time of inspection drill rig on site, with drilling activity ongoing. All equipment and material located on secondary containment. Secondary containment appears structurally sound. No E&S issues.

For data sources see[8]

References