X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20121

Well Details

Well ID: 37-131-20121
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Meshoppen Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 145622
Farm/Lease Name: HOPE 2H
License Status:
Spud Date: 2011-01-02
Permit Date: 2010-12-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.605744
Longitude: -76.079708

For data sources see[1][2][3]

Well History

Date Event
2010-12-27 New Permit Application
2011-01-06 Performed Spud Operation
2011-02-20 Drilling Completion
2011-09-18 Perforation
2011-09-18 Performed Stimulation
2012-08-15 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-09-18 2011-09-18 7,194 5,824,434

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor - Gyptron T-390 Scale Inhibitor
Methanol 67-56-1 10.00 0.00111000
Scale Inhibitor - Gyptron T-390 Champion Technologies Scale Inhibitor
10.1 - 15 HCL Frac Tech Services (FTS) Acid Water 7732-18-5 85.00 0.39
Hydrochloric acid 7647-01-0 15.00 0.06
Surfatron DW, IBC, P330-1W Champion Technologies Surfactant Ethoxylated nonylphenol 30.00 0.00181000
Methanol 67-56-1 30.00 0.00181000
Fresh Water Carrier/Base Fluid 70.41
Recycled Produced Water Carrier/Base Fluid 16.79
Biocide - Bactron K 139 Champion Technologies Antibacterial Agent Ethanol 64-17-5 5.00 0.00150000
Glutaraldehyde 111-30-8 5.00 0.00150000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 10.00 0.00299000
FE 100L (Iron Chelator) Frac Tech Services (FTS) Iron Control Agent No Hazardous Components 0.00
CI-150 (Corrosion Inhibitor) Frac Tech Services (FTS) Corrosion Inhibitor Organic Amineresin Salt 30.00 0.00036000
N,N-Dimethylformamide 68-12-2 10.00 0.00012000
Isopropanol 67-63-0 60.00 0.00072000
Aromatic Aldehyde 10.00 0.00012000
Quaternary Ammonium Compounds 10.00 0.00012000
FRW-200 Frac Tech Services (FTS) Friction Reducer No Hazardous Components 0.00
Sand (Proppant) Proppant 12.19

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-09-18 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 1,886,933.00 241 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 3,629,011.00 364 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 2,476,467.00 356 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 1,471,025.00 343 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 1,542,890.00 366 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,185,294.00 365 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 439,051.00 117 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 962,699.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 1,180.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 3,901.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 632.51 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 476.60 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 538.88 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 290.81 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 636.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 150.79 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 15.00 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 108.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 328.12 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.50 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 667.95 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 559.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.50 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 3,529.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 117.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 36.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 5.34 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 36.01 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1950460 Primary Facility 2011-02-16 Drilling/Alteration No Violations Noted
1952695 Primary Facility 2011-02-01 Drilling/Alteration No Violations Noted Fishing at approx 535'
1954676 Primary Facility 2011-03-04 Site Restoration No Violations Noted Well drilled. Rig moved off. Clean up of site in progress.
1992503 Primary Facility 2011-08-01 Routine/Complete Inspection No Violations Noted Security at gate.
1995121 Primary Facility 2011-08-10 Routine/Complete Inspection No Violations Noted Water in cellar. No bubbles.
1998935 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted Doing some E&S work. Otherwise, no activity. Fence w/ lock around well.
2002544 Primary Facility 2011-09-14 Routine/Complete Inspection No Violations Noted Tanks on site. Preparing to frac. Doing some E&S work.
2133338 Primary Facility 2013-01-22 Routine/Complete Inspection No Violations Noted Producing well. Cellar is water filled.
2254975 Primary Facility 2014-03-19 Routine/Complete Inspection No Violations Noted Producing well. Cellar full of water- no bubbles.
2361395 Primary Facility 2015-04-15 Routine/Complete Inspection No Violations Noted
2393537 Primary Facility 2015-07-21 Routine/Complete Inspection No Violations Noted
2687819 Primary Facility 2018-01-25 Routine/Complete Inspection No Violations Noted Arrive on location: 13:45. Weather: Clear, cold, ~ 20 degs. On location to perform "New Spud" inspection, accompanied by DEP OGI, Ulyana Trynovich. Upon arrival, Express Energy Services has set 20" Conductor and 16" mouseholes for (2) new wells on pad, the Hope 5H and 6H. Both new wells conductors have been set at ~ 80' and cemented to surface. - One (1) existing well was present on pad, the Hope 2H. This well has been disconnected from all previous production equipment and has been temporarily shut in, in preparation for drilling new wells on pad. The 2H well was capped with a 5K master valve. (3) 2" annuli vents were present and plumbed to surface. The (5/P) and (9x5) annuli were shut in to analog gauges, both reading 0 psi. The (13x9) vent was open and venting to atmosphere through a "vent check" fitting. Gas check performed at the (13x9) "vent check" opening showed 0 % LEL, 0 % CH4. Gas check was performed using an MSA Altair 5X gas meter calibrated on 1/22/18. No obvious concerns or violations were note
2716039 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted Arrived on location: 08:45. Weather: Overcast, light rain, ~ 40 degs. Upon arrival met with Chesapeake "CHK" Reps. Chris Schmaltz, Drilling Superintendent; Terry Hooper, Well-site Super; and Isabelle Leon, Drilling Engineer. The Patterson #572 Rig has recently moved on location to drill (2) new wells on pad, the Hope 5H & 6H. Rig has TD'd the 17 1/2" Surface interval of the 5H well at 550' and is presently running 13 3/8" casing in hole. When set, this surface casing string will be cemented to surface by Schlumberger using their CemCrete blend later this afternoon.

- I confirmed with Mr. Schmaltz that CBLs will be ran on the Surface and Intermediate casing strings of both wells being drilled on this pad to assess cement jobs. I requested a .pdf copy of these CBLs be emailed to me when obtained. - CHK will continue drilling the 5H well to TD prior to skidding to the 6H well. The 20" conductor was set for the 6H well on ~ 1/16/18. - One (1) existing well was present on pad, the Hope 2H. This well has been dis

2762730 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted The site was prepared for the commencement of hydraulic fracturing operations. Inspection is related to e-Facts Inspection ID: 2762723. If you have any questions, please contact me.

For data sources see[9]

References