X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20146

Well Details

Well ID: 37-131-20146
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 145313
Farm/Lease Name: SICKLER 6H
License Status:
Spud Date: 2011-04-12
Permit Date: 2011-03-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.608525
Longitude: -75.973233

For data sources see[1][2][3]

Well History

Date Event
2011-03-22 New Permit Application
2011-03-28 Performed Spud Operation
2011-10-23 Drilling Completion
2012-03-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-06-24 2012-06-24 7,928 7,836,738

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-14 Baker Hughes Corrosion Inhibitor Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00006000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00035000
Methanol 67-56-1 100.00 0.00116000
Fatty acids, tall-oil 61790-12-3 10.00 0.00012000
Propargyl alcohol 107-19-7 5.00 0.00006000
Water Operator Carrier Water 7732-18-5 100.00 88.11
Sand, White, 100 mesh Baker Hughes Proppant Quartz 14808-60-7 100.00 0.75
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Baker Hughes Surfactant Poly (acrylamide-co-acrylic acid) 0.02
Water 7732-18-5 0.06
Sorbitan Monooleate 0.00441629
Hydrochloric acid 7647-01-0
Formalin 50-00-0
Sodium chloride 7647-14-5 0.00000454
Thiourea polymer 68527-49-1
Salt 0.00441629
Polyacrylate 0.00302666
Potassium chloride 7447-40-7 0.00000757
Ethoxylated Alcohol 0.00176651
Alpha 1427 Baker Hughes Biocide Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00220000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.00 0.00110000
Ethanol 64-17-5 5.00 0.00110000
Glutaraldehyde 111-30-8 30.00 0.00659000
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 4.25
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 60.00 0.00303000
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00454000
Calcium chloride 10043-52-4 5.00 0.00076000
Hydrochloric Acid 5.1-7.5 Baker Hughes Acidizing Hydrochloric acid 7647-01-0 7.50 0.06
Water 7732-18-5 92.50 0.75
Sand, White, 30/50 Baker Hughes Proppant Quartz 14808-60-7 100.00 5.52
Hydrochloric Acid 10.1-15 Baker Hughes Acidizing Water 7732-18-5 85.00 0.31
Hydrochloric acid 7647-01-0 15.00 0.05
InFlo 250W Baker Hughes Surfactant Surfactants 80.00 0.00107000
Methanol 67-56-1 30.00 0.00040000
2-Butoxyethanol 111-76-2 5.00 0.00007000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 423,971.00 61 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 2,895,108.00 309 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 1,011,886.54 173 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 602,596.17 143 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 1,439,783.68 309 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 1,932,856.86 365 0.00 0 0.00 0
2018 BKV OPR LLC 1,287,272.94 364 0.00 0 0.00 0
2019 BKV OPR LLC 1,179,302.27 362 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CARRIZO (MARCELLUS) LLC Drilling Fluid Waste 3,872.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CARRIZO (MARCELLUS) LLC Drilling Fluid Waste 1,190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 850.00 Tons LANDFILL NY STATE #32S11
2012 CARRIZO (MARCELLUS) LLC Produced Fluid 666.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 860.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 154.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 605.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 320.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 132.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 86.96 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CARRIZO (MARCELLUS) LLC Basic Sediment 62.70 Bbl LANDFILL THR029
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 187.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 106.65 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 630.90 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 71.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 232.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 65.78 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 113.19 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 337.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Basic Sediment 12.14 Bbl LANDFILL THR029
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 23.41 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 52.23 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 1.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 29.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 244.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 268.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 334.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 89.85 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Synthetic Liner Materials 0.29 Tons
2019 BKV OPR LLC Produced Fluid 10.83 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Synthetic Liner Materials 1.26 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 0.29 Tons BENEFICIAL REUSE ?PERMIT
2019 BKV OPR LLC Produced Fluid 401.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1962536 Primary Facility 2011-04-01 Drilling/Alteration No Violations Noted hole wet from 40' - 60'
1965665 Primary Facility 2011-04-14 Drilling/Alteration No Violations Noted drillers log up to date
1966411 Primary Facility 2011-04-18 Drilling/Alteration No Violations Noted Rig - Falcon 14(Ingersol Rand) checked cellar - no bubbles Drillers log - checked
1968962 Primary Facility 2011-04-28 Routine/Complete Inspection No Violations Noted this well is done to intermediate csg, moved rig to the Sickler 1H
1984832 Primary Facility 2011-06-28 Follow-up Inspection No Violations Noted Inspection is in response to reported spill. Rig is in process of moving from Solanick to Sickler site.Company Man, Jeff Myers, has MSDS sheets on OB mud in trailer. Night shift topped off mud tank, then in the heat of the day, expansion caused the tank to overflow.Spill was found on 6/27/2011 around 1300. Super vac was here in about 1/2 hour. Total of about 30 gallons over the top with about 5 - 10 gallons splashing off containment. Dirt &fill was dug out and put in waste. Area was about 10' X 10' X 1' deep. Completely cleaned up at this time. Took 3 pictures. Company man had tank level lowerewd immediately so it wouldn't happen again.
1991507 Primary Facility 2011-07-28 Drilling/Alteration No Violations Noted H&P 320 , Comp Man Jeff Myers
2009958 Primary Facility 2011-10-11 Drilling/Alteration No Violations Noted H&P 320, Comp. Man - John Savage
2013430 Primary Facility 2011-10-17 Drilling/Alteration No Violations Noted H&P 320 Comp. Man - Tim Peay checked drillers log, drilling at 14600'
2029524 Primary Facility 2011-12-27 Routine/Complete Inspection No Violations Noted
2064936 Primary Facility 2012-04-23 Follow-up Inspection Pending Responding to a complaint. Had water-vac truck fill and empty cellar. Bubbles were coming up but due to well configuation unable to tell which annulus they were coming from. It was either the 20 X 13 3/8" or the 13 3/8 X 9 5/8". Bubbles were coming up in 3 spots. Also on site was Gary Byron, Jesse Bonnice, and Steve Osburne.Workover rig was on site on the 2H to clean out and perf in prep for frac. Need to get containment in shape.
2341050 Primary Facility 2015-02-04 Routine/Partial Inspection No Violations Noted
2382664 Primary Facility 2015-06-26 Routine/Partial Inspection No Violations Noted
2426467 Primary Facility 2015-11-09 Routine/Complete Inspection No Violations Noted
2489933 Primary Facility 2016-05-31 Administrative/File Review No Violations Noted This administration inspection is created to document a spill of production fluid that occurred at the site on 5/11/16. The Department received an e-mail in reference to the spill incident from the PADEP Northeast Regional Office Emergency Response Team on 5/17/16 at 10:33 AM. Matt Shope and Frank Hoehle, DEP O&G WQS, and I responded to the spill incident on 5-17-16 at 13:30. There was no activity or personnel at the site during the inspection. It had been apparent the spill had been remediated. Stone was placed over the original pad material on the pad surface impacted by the production fluid spill. Conductivity of water in the production fluid tanks containment structure near the containment wall and one of the tanks was (9) milliSiemens/cm³. I did not record any elevated soil conductivity readings of concern in the general area of the pad surface where the spill occurred. There is staining/discoloration of water and /or fluid on the side walls of the production fluid tanks and the containment l
2537145 Primary Facility 2016-11-15 Routine/Partial Inspection No Violations Noted
2599600 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted There was no activity occurring at the site. No further comments.
2641322 Primary Facility 2017-09-14 Routine/Partial Inspection No Violations Noted There was no activity occurring at the site during the inspection. There were no violations noted. If you have any questions, please contact me.
2661530 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted Arrived on location to perform routine inspection and update status of wells. 6 wells on location. 6 treaters, 6 separators and 4 tanks. All cellars filled with water with no apparent bubbling. Prod casing pressures are as follows: 1H = 500psi, 2H = 500psi, 3 = 600psi, 4 = 400psi, 5 = 600psi, 6 = 500psi. No issues or concerns at time of inspection.

For data sources see[8]

References