X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20316

Well Details

Well ID: 37-131-20316
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 149101
Farm/Lease Name: P&G4 P&G1 3H
License Status:
Spud Date: 2013-09-11
Permit Date: 2013-07-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.577128
Longitude: -76.044144

For data sources see[1][2][3]

Well History

Date Event
2013-07-16 New Permit Application
2013-09-13 Performed Spud Operation
2013-11-17 Drilling Completion
2014-12-08 Perforation
2014-12-09 Performed Stimulation
2015-03-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-08 2014-12-20 7,634 6,585,390

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6116A Universal Biocide 2,2-Diobromo-3-nitrilopropionamide 10222-01-2 30 0.01032 0
Plythethylene Glycol 25322-68-3 60 0.021 0
Dibromoacetonitrile 3252-43-5 5 0.00172 0
Unislick 50 Universal Friction Reducer Hydrotreated Light Distillate 64742-47-8 30 0.01 0
Scale Hib A Universal Scale Inhibitor Ethylene Glycol 107-21-1 20 0.00342 0
Acid Universal Acid Water 7732-18-5 85 0.71 0
Hydrochloric Acid 007647-01-0 15 0.13 0
Water River Carrier Water 7732-18-5 100 85.8709 0
Unihib G Universal Corrosion Inhibitor Ethoxylated Alchohol NA 0 0.0002 0
Short Chained Gycol Ether 112-34-5 20 0.0002 0
Sand Universal Poppant Silica 14808-60-7 99.9 13.1487 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-12-09 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2014 WARREN E & P INC 0.00 0 0.00 0 0.00 0
2015 WARREN E & P INC 1,399,682.45 278 0.00 0 0.00 0
2016 WARREN E & P INC 1,371,976.29 365 0.00 0 0.00 0
2017 WARREN E & P INC 803,332.51 339 0.00 0 0.00 0
2018 BKV OPR LLC 634,204.04 363 0.00 0 0.00 0
2019 BKV OPR LLC 482,402.92 346 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CITRUS ENERGY CORP Drill Cuttings 1,135.00 Tons LANDFILL THR029
2014 WARREN E & P INC Fracturing Fluid Waste 38.29 Tons LANDFILL THR029
2014 WARREN E & P INC Drill Cuttings 1.70 Tons LANDFILL THR029
2015 WARREN E & P INC Fracing Fluid Waste 98.52 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 WARREN E & P INC Fracturing Fluid Waste 40.57 Tons LANDFILL THR029
2015 WARREN E & P INC Produced Fluid 245.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 WARREN E & P INC Produced Fluid 540.98 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 53.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 52.52 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 27.07 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 249.86 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 231.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 183.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 5.99 Tons LANDFILL THR029
2017 WARREN E & P INC Other Oil & Gas Wastes 12.49 Tons LANDFILL THR029
2017 WARREN E & P INC Other Oil & Gas Wastes 16.00 Bbl REUSE (AT WELL PAD)
2017 WARREN E & P INC Other Oil & Gas Wastes 140.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 491.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 687.95 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Produced Fluid 37.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 WARREN E & P INC Produced Fluid 233.08 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 149.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Waste Water Treatment Sludge 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Waste Water Treatment Sludge 3.03 Tons LANDFILL 301358
2018 WARREN E & P INC Produced Fluid 739.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Waste Water Treatment Sludge 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Soil Contaminated by Oil 0.26 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Produced Fluid 73.33 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Synthetic Liner Materials 1.35 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Produced Fluid 4,937.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Soil Contaminated by Oil & Gas Related Spills 0.26 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2213845 Primary Facility 2013-10-18 Drilling/Alteration No Violations Noted 20" @ 80' 9/11/2013 Ziengenfuss
2218687 Primary Facility 2013-11-01 Drilling/Alteration No Violations Noted The solids control process involves the use of rig shakers and centrifuges in order to separate solids and liquids in the drill cuttings with mud. The drill cuttings are deposited into into open top containers and eventually mixed with sawdust for additional drying in preparation for landfill disposal. The fluid in the cuttings drops into a through under the shakers and is pumped to centrifuges to pull out more solids. During water based mud drilling, calcium nitrate and a polymer is injected to let the solids come together; basically used for coagulation and flocculation purposes. The chemicals are added to a poly tank and eventually pumped through a centrifuge as the centrifuge is separating solids and liquids in the drill cuttings. A request for approval of Alternative Waste Management Practice (OG-71) needs to be submitted to the Department for this process.
2219243 Primary Facility 2013-11-05 Drilling/Alteration No Violations Noted drilling at 4837'
2341743 Primary Facility 2015-01-07 Incident- Response to Accident or Event No Violations Noted Arrived at the site at 12:50. Rick Fields Operations Manager of Warren E&P Incorporated contacted me at 10:20 AM on 1/7/15 to report a flash fire that occurred on this location around 10AM on 1/7/15. Mr. Fields alleged the flash fire was immediately extinguished and there were no injuries as a result of the fire and no fluid was lost from the well. Shortly upon arrival, I met with Rick Davidson, Completions Supervisor of Warren. Mr. Davidson stated that the flash fire occurred at 9:45 AM and was extinguished at 9:46 AM. He concurred with Mr. Fields Statement regarding no injuries occurring as a result of the fire and no loss of fluid. The flash fire occurred as a result of an employee contacting a valve on a control panel on the snubbing unit forcing a puff a gas out of a bleed valve on the snubbing unit.
2359540 Primary Facility 2015-04-08 Routine/Complete Inspection No Violations Noted
2473772 Primary Facility 2016-04-08 Routine/Complete Inspection No Violations Noted
2633659 Primary Facility 2017-08-23 Routine/Complete Inspection No Violations Noted I arrived at the site at 11:47 AM. There was no activity or personnel at the site during the inspection. The weather conditions are partly cloudy skies and breezy with temperatures around 70 degrees. Warren submitted a stimulation notification to the Department on 7/28/17. The notice indicated that stimulation (hydraulic fracturing) of the Reynolds Unit P&G 4 Reynolds 3H well would commence on 7/30/17 at 12:00 PM. It is apparent that completions activities for this well have recently concluded. Completions activities would have consisted of stimulation, drilling out of hydraulic fracturing plugs and flowback of the well. Some of the equipment used for completions operations remains on the location. This equipment consists of secondary containment, berms for the containment, gas buster tanks and frac tanks. Stormwater from recent storm events has accumulated on the containment liner near the center of the pad near the wellheads, in the frac tank battery containment in the corner of the pad below the site cut
2718977 Primary Facility 2018-04-17 Administrative/File Review No Violations Noted Received & reviewed well site restoration report. No violations were noted. If you have any questions, please contact me.

For data sources see[9]

References