X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344012202002

Well Details

Well ID: 0344012202002
Loading map...
Location: 00/02-22-034-01W4/2
Location Alias: 00/02-22-34-01 W4M
Location Alias 2: 00/02-22-034-01 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 01
Section: 22
County/Municipality: Special Areas No. 4
Well Name: PALOMA ET AL ALTARIO 2-22-34-1
Operator Name: Freehold Royalties Ltd.
License Number: 0131539
License Date: 1988-01-20
License Status: Abandoned
Spud Date: 1988-01-25
Final Drill Date: 1988-01-29
Well Total Depth: 925.00 m
Surface Hole Latitude: 51.928374
Surface Hole Longitude: -110.059821

For data sources see[1][2]

Well History

Date Event
1988-01-20 Obtained License
1988-01-26 Surface Casing Operation Performed
1988-01-29 Drill Stem Test Performed
1988-01-29 Finished Drilling
1988-01-29 Well Log Performed
1988-01-29 Well Mode changed to Drilled and Cased
1988-01-30 Production Casing Operation Performed
1988-01-31 Rig Released
1988-02-09 Well Log Performed
1988-02-12 Well Log Performed
1988-02-13 Perforation Treatment Performed - Jet Perforation
1988-02-15 Well Log Performed
1988-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-16 Plug Back Performed
1988-02-17 Perforation Treatment Performed - Jet Perforation
1989-09-08 Well Log Performed
1989-09-09 Perforation Treatment Performed - Cement Squeeze
1989-09-09 Perforation Treatment Performed - Jet Perforation
1989-09-13 Well Log Performed
1989-09-14 Perforation Treatment Performed - Jet Perforation
1989-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-15 Plug Back Performed
1989-11-15 Well Log Performed
1989-11-16 Perforation Treatment Performed - Jet Perforation
1990-01-09 Well Began Production
1990-01-09 Well Fluid changed to Gas
1990-01-09 Well Mode changed to Flowing
1990-02-28 Well Fluid changed to Gas
1990-02-28 Well Mode changed to Suspended
1992-08-25 Well Log Performed
1992-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-26 Plug Back Performed
1992-08-26 Well Abandoned
1992-08-26 Well Fluid changed to Gas
1992-08-26 Well Log Performed
1992-08-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-13 Perforation 887.00 888.00 13
1989-11-16 Perforation 809.00 811.00 7
1992-08-26 Packing Device Capped w/Cement 782.00 790.00 0
1988-02-16 Packing Device Capped w/Cement 877.50 885.50 0
1988-02-17 Perforation 866.00 867.50 7
1989-09-09 Perforation 870.00 870.50 7
1989-09-09 Cement Squeeze 870.00 870.50 0
1989-09-14 Perforation 866.00 867.00 7
1989-11-15 Packing Device Capped w/Cement 855.00 863.00 0
1989-11-16 Perforation 793.50 797.00 7
1989-11-16 Perforation 800.00 801.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 532 0.0 0.0 0.0

For data sources see[5]

References