X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384230714000

Well Details

Well ID: 0384230714000
Loading map...
Location: 00/14-07-038-23W4/0
Location Alias: 00/14-07-38-23 W4M
Location Alias 2: 00/14-07-038-23 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 23
Section: 07
County/Municipality: Lacombe County
Well Name: PETROREP ET AL MIKWAN 14-7-38-23
Operator Name: Petrorep (Canada) Ltd.
License Number: 0111168
License Date: 1984-11-29
License Status: RecCertified
Spud Date: 1984-12-18
Final Drill Date: 1984-12-27
Well Total Depth: 1790.00 m
Surface Hole Latitude: 52.256431
Surface Hole Longitude: -113.282186

For data sources see[1][2]

Well History

Date Event
1984-11-29 Obtained License
1984-12-18 Surface Casing Operation Performed
1984-12-27 Finished Drilling
1984-12-27 Well Mode changed to Drilled and Cased
1984-12-28 Well Log Performed
1984-12-29 Drill Stem Test Performed
1984-12-31 Production Casing Operation Performed
1984-12-31 Rig Released
1985-02-24 Well Log Performed
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-01 Perforation Treatment Performed - Cement Squeeze
1985-03-03 Well Log Performed
1985-03-04 Perforation Treatment Performed - Jet Perforation
1985-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-07 Well Log Performed
1985-03-08 Perforation Treatment Performed - Cement Squeeze
1985-03-10 Well Log Performed
1985-03-11 Perforation Treatment Performed - Jet Perforation
1985-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-01 Well Began Production
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Flowing
1985-10-01 Well Fluid changed to Crude Oil
1985-10-01 Well Mode changed to Suspended
1987-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-04 Plug Back Performed
1987-11-04 Well Abandoned
1987-11-04 Well Fluid changed to Crude Oil
1987-11-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-25 Perforation 1729.00 1730.50 13
1985-03-16 Acid Treatment 1720.70 1723.60 0
1987-11-04 Packing Device Capped w/Cement 1705.60 1712.60 0
1985-02-26 Acid Treatment 1729.00 1730.50 0
1985-03-01 Cement Squeeze 1729.00 1730.50 0
1985-03-04 Perforation 1720.70 1723.60 13
1985-03-05 Acid Treatment 1720.70 1723.60 0
1985-03-08 Cement Squeeze 1720.70 1723.60 0
1985-03-11 Perforation 1720.70 1723.60 13
1985-03-12 Acid Treatment 1720.70 1723.60 0
1985-03-13 Acid Treatment 1720.70 1723.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1320 0.0 0.0 0.0

For data sources see[5]

References