X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384240802000

Well Details

Well ID: 0384240802000
Loading map...
Location: 00/02-08-038-24W4/0
Location Alias: 00/02-08-38-24 W4M
Location Alias 2: 00/02-08-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 08
County/Municipality: Lacombe County
Well Name: PETROMK RR HB JOFFRE 2-8-38-24
Operator Name: Prodeco Oil & Gas Co. Ltd.
License Number: 0055344
License Date: 1975-10-10
License Status: RecCertified
Spud Date: 1975-10-12
Final Drill Date: 1975-10-17
Well Total Depth: 1417.30 m
Surface Hole Latitude: 52.248259
Surface Hole Longitude: -113.392178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-10 Obtained License
1975-10-17 Drill Stem Test Performed
1975-10-17 Finished Drilling
1975-10-18 Production Casing Operation Performed
1975-10-22 Perforation Treatment Performed - Jet Perforation
1975-11-01 Well Mode changed to Drilled and Cased
1976-09-17 Well Began Production
1976-09-17 Well Fluid changed to Crude Oil
1976-09-17 Well Mode changed to Pumping
1978-12-13 Perforation Treatment Performed - Jet Perforation
1981-09-25 Well Began Injection
1981-09-25 Well Fluid changed to Water
1981-09-25 Well Type changed to Injection
1992-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-11 Plug Back Performed
1992-07-13 Perforation Treatment Performed - Jet Perforation
1992-07-13 Well Log Performed
1992-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-14 Perforation Treatment Performed - Remedial Casing
1992-07-14 Well Fluid changed to Water
1992-07-14 Well Mode changed to Abandoned
1992-07-14 Well Type changed to Injection
1992-07-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-22 Perforation 1396.60 1397.20 7
1978-12-13 Perforation 1391.70 1392.60 3
1978-12-13 Perforation 1394.80 1396.60 7
1992-07-11 Packing Device Capped w/Cement 968.00 1380.00 0
1992-07-13 Perforation 806.00 807.00 13
1992-07-14 Remedial Casing Cementing 806.00 807.00 0
1992-07-14 Packing Device Capped w/Cement 791.00 791.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 921 0.0 0.0 0.0
1977 5572 0.0 0.0 0.0
1978 5848 0.0 0.0 0.0
1979 6774 0.0 0.0 0.0
1980 6890 0.0 0.0 0.0
1981 4827 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References