If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384242809003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.299283,"lon":-113.368006,"icon":""}]} |
Location: 00/09-28-038-24W4/3 | |
Location Alias: 00/09-28-38-24 W4M | |
Location Alias 2: 00/09-28-038-24 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 28 | |
County/Municipality: Lacombe County | |
Well Name: EMBER HAYNES 9-28-38-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0202692 | |
License Date: 1997-06-19 | |
License Status: Suspension | |
Spud Date: 1997-06-21 | |
Final Drill Date: 1997-07-01 | |
Well Total Depth: 1925.00 m | |
Surface Hole Latitude: 52.299283 | |
Surface Hole Longitude: -113.368006 |
Date | Event |
---|---|
1997-06-19 | Obtained License |
1997-06-22 | Surface Casing Operation Performed |
1997-07-01 | Finished Drilling |
1997-07-01 | Well Mode changed to Drilled and Cased |
1997-07-02 | Well Log Performed |
1997-07-03 | Production Casing Operation Performed |
1997-07-04 | Rig Released |
1997-07-09 | Well Log Performed |
1997-07-10 | Perforation Treatment Performed - Jet Perforation |
1997-07-10 | Well Log Performed |
1997-07-15 | Perforation Treatment Performed - Cement Squeeze |
1997-07-15 | Perforation Treatment Performed - Jet Perforation |
1997-07-15 | Well Log Performed |
1997-07-17 | Perforation Treatment Performed - Jet Perforation |
1997-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-18 | Well Log Performed |
1997-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-11-24 | Well Log Performed |
1997-11-25 | Perforation Treatment Performed - Jet Perforation |
1997-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-26 | Well Log Performed |
2001-05-12 | Perforation Treatment Performed - Jet Perforation |
2001-05-12 | Well Log Performed |
2001-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-14 | Plug Back Performed |
2001-05-15 | Perforation Treatment Performed - Jet Perforation |
2001-05-15 | Well Log Performed |
2001-05-17 | Perforation Treatment Performed - Jet Perforation |
2001-05-17 | Well Log Performed |
2001-06-08 | Perforation Treatment Performed - Jet Perforation |
2001-06-08 | Well Log Performed |
2001-08-28 | Well Began Production |
2001-08-28 | Well Fluid changed to Gas |
2001-08-28 | Well Mode changed to Flowing |
2001-12-31 | Well Log Performed |
2002-01-02 | Well Log Performed |
2002-02-09 | Perforation Treatment Performed - Cement Squeeze |
2002-02-09 | Plug Back Performed |
2002-02-11 | Well Log Performed |
2002-02-12 | Perforation Treatment Performed - Jet Perforation |
2002-02-12 | Well Log Performed |
2002-02-13 | Perforation Treatment Performed - Remedial Casing |
2002-02-15 | Perforation Treatment Performed - Jet Perforation |
2002-02-16 | Perforation Treatment Performed - Remedial Casing |
2002-02-20 | Well Log Performed |
2002-02-21 | Perforation Treatment Performed - Jet Perforation |
2002-02-21 | Well Log Performed |
2002-02-22 | Perforation Treatment Performed - Remedial Casing |
2011-10-01 | Well Fluid changed to Gas |
2011-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-10 | Perforation | 1896.00 | 1897.50 | 13 |
2001-05-13 | Acid Treatment | 1867.00 | 1870.50 | 0 |
2001-05-14 | Packing Device Capped w/Cement | 1865.00 | 1873.00 | 0 |
2001-05-14 | Packing Device Capped w/Cement | 1857.00 | 1865.00 | 0 |
2001-05-15 | Perforation | 1607.00 | 1608.50 | 13 |
2001-05-17 | Perforation | 1608.50 | 1610.00 | 13 |
2001-06-08 | Perforation | 1541.50 | 1543.00 | 17 |
2002-02-09 | Cement Squeeze | 1541.50 | 1543.00 | 0 |
2002-02-12 | Perforation | 1508.00 | 1509.00 | 20 |
2002-02-13 | Remedial Casing Cementing | 1508.00 | 1509.00 | 0 |
2002-02-15 | Perforation | 833.00 | 834.00 | 20 |
1997-07-15 | Perforation | 1904.80 | 1906.20 | 13 |
2002-02-16 | Remedial Casing Cementing | 833.00 | 834.00 | 0 |
2002-02-21 | Perforation | 513.00 | 515.00 | 20 |
2002-02-22 | Remedial Casing Cementing | 513.00 | 515.00 | 0 |
1997-07-15 | Cement Squeeze | 1896.00 | 1906.20 | 0 |
1997-07-17 | Perforation | 1896.00 | 1897.50 | 14 |
1997-07-18 | Acid Treatment | 1896.00 | 1897.50 | 0 |
1997-11-23 | Packing Device Capped w/Cement | 1876.00 | 1884.00 | 0 |
1997-11-25 | Perforation | 1874.00 | 1878.00 | 18 |
1997-11-26 | Acid Treatment | 1874.00 | 1878.00 | 0 |
2001-05-12 | Perforation | 1867.00 | 1870.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 2785 | 0.0 | 0.0 | 0.0 |
2002 | 3731 | 0.0 | 0.0 | 0.0 |
2003 | 4533 | 0.0 | 0.0 | 0.0 |
For data sources see[5]