X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384243415000

Well Details

Well ID: 0384243415000
Loading map...
Location: 00/15-34-038-24W4/0
Location Alias: 00/15-34-38-24 W4M
Location Alias 2: 00/15-34-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 34
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 15-34-38-24
Operator Name: Ember Resources Inc.
License Number: 0152857
License Date: 1992-06-19
License Status: Issued
Spud Date: 1992-06-22
Final Drill Date: 1992-06-28
Well Total Depth: 1613.00 m
Surface Hole Latitude: 52.316194
Surface Hole Longitude: -113.349316

For data sources see[1][2]

Well History

Date Event
1992-06-19 Obtained License
1992-06-23 Surface Casing Operation Performed
1992-06-28 Finished Drilling
1992-06-28 Well Log Performed
1992-06-28 Well Mode changed to Drilled and Cased
1992-06-29 Drill Stem Test Performed
1992-06-30 Production Casing Operation Performed
1992-07-01 Rig Released
1992-07-19 Perforation Treatment Performed - Jet Perforation
1992-07-19 Well Log Performed
1992-08-07 Well Began Production
1992-08-07 Well Fluid changed to Crude Oil
1992-08-07 Well Mode changed to Pumping
2000-12-19 Well Log Performed
2000-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-20 Plug Back Performed
2000-12-20 Well Log Performed
2000-12-21 Perforation Treatment Performed - Jet Perforation
2000-12-21 Perforation Treatment Performed - Remedial Casing
2000-12-28 Well Log Performed
2001-01-04 Well Log Performed
2001-01-05 Perforation Treatment Performed - Jet Perforation
2001-01-10 Well Fluid changed to Crude Oil
2001-01-10 Well Mode changed to Pumping
2001-01-31 Well Fluid changed to Crude Oil
2001-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-19 Perforation 1513.00 1514.80 13
2000-12-20 Packing Device Capped w/Cement 1501.00 1509.00 0
2000-12-21 Perforation 770.00 771.00 39
2000-12-21 Remedial Casing Cementing 770.00 771.00 0
2001-01-05 Perforation 749.00 753.00 17
2001-01-05 Perforation 753.00 757.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3538 0.0 0.0 0.0
1993 2158 0.0 0.0 0.0
1994 1920 0.0 0.0 0.0
1995 7357 0.0 0.0 0.0
1996 4424 0.0 0.0 0.0
1997 8158 0.0 0.0 0.0
1998 8299 0.0 0.0 0.0
1999 7970 0.0 0.0 0.0
2000 1920 0.0 0.0 0.0
2001 75 0.0 0.0 0.0

For data sources see[5]

References