If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384263209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.312129,"lon":-113.67425,"icon":""}]} |
Location: 00/09-32-038-26W4/0 | |
Location Alias: 00/09-32-38-26 W4M | |
Location Alias 2: 00/09-32-038-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Lacombe County | |
Well Name: JOFFRE B #2 | |
Operator Name: Suncor Energy Inc. | |
License Number: 0009988 | |
License Date: 1955-08-15 | |
License Status: RecCertified | |
Spud Date: 1955-08-17 | |
Final Drill Date: 1955-09-16 | |
Well Total Depth: 1624.90 m | |
Surface Hole Latitude: 52.312129 | |
Surface Hole Longitude: -113.674250 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-08-15 | Obtained License |
1955-09-16 | Finished Drilling |
1955-09-16 | Well Mode changed to Drilled and Cased |
1955-09-17 | Production Casing Operation Performed |
1955-10-05 | Perforation Treatment Performed - Jet Perforation |
1955-10-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-10-16 | Well Began Production |
1955-10-16 | Well Fluid changed to Crude Oil |
1955-10-16 | Well Mode changed to Pumping |
1963-10-05 | Perforation Treatment Performed - Cement Plug |
1963-10-17 | Well Abandoned |
1963-10-17 | Well Fluid changed to Crude Oil |
1963-10-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-10-05 | Perforation | 1606.30 | 1610.90 | 13 |
1955-10-06 | Acid Treatment | 1606.30 | 1610.90 | 0 |
1963-10-05 | Cement Plug | 1565.10 | 1623.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]