If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385033203003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.304954,"lon":-114.383638,"icon":""}]} |
Location: 00/03-32-038-03W5/3 | |
Location Alias: 00/03-32-38-03 W5M | |
Location Alias 2: 00/03-32-038-03 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 03 | |
Section: 32 | |
County/Municipality: Lacombe County | |
Well Name: NAL ET AL HZ MEDRIVER 8-32-38-3 | |
Operator Name: NAL Resources Limited | |
License Number: 0201813 | |
License Date: 1997-05-28 | |
License Status: Amended | |
Spud Date: 1997-06-03 | |
Final Drill Date: 1997-07-26 | |
Well Total Depth: 2990.30 m | |
Surface Hole Latitude: 52.304954 | |
Surface Hole Longitude: -114.383638 |
Date | Event |
---|---|
1997-05-28 | Obtained License |
1997-06-06 | Surface Casing Operation Performed |
1997-06-15 | Direction Drilling Operation Performed - Horizontal |
1997-06-24 | Production Casing Operation Performed |
1997-07-15 | Direction Drilling Operation Performed - Horizontal |
1997-07-20 | Lost Circulation Occurred |
1997-07-23 | Well Log Performed |
1997-07-26 | Finished Drilling |
1997-07-26 | Perforation Treatment Performed - Open-Hole Completion |
1997-07-26 | Well Log Performed |
1997-07-26 | Well Structure changed to Drain |
1997-07-30 | Rig Released |
1997-08-15 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-06-15 | 2107.00 | Horizontal |
1997-07-15 | 2276.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-26 | Open Hole/Barefoot Completion | 2257.00 | 2990.30 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-07-20 | Lost Circulation | 2589.50 | 2589.50 |
For data sources see[6]