X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394221714000

Well Details

Well ID: 0394221714000
Loading map...
Location: 00/14-17-039-22W4/0
Location Alias: 00/14-17-39-22 W4M
Location Alias 2: 00/14-17-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 17
County/Municipality: Lacombe County
Well Name: RESMAN NEVIS 14-17-39-22
Operator Name: Resman Holdings Ltd.
License Number: 0104323
License Date: 1983-11-25
License Status: RecCertified
Spud Date: 1983-11-27
Final Drill Date: 1983-12-03
Well Total Depth: 1450.00 m
Surface Hole Latitude: 52.360204
Surface Hole Longitude: -113.139649

For data sources see[1][2]

Well History

Date Event
1983-11-25 Obtained License
1983-12-03 Finished Drilling
1983-12-03 Well Log Performed
1983-12-03 Well Mode changed to Drilled and Cased
1983-12-04 Drill Stem Test Performed
1983-12-05 Production Casing Operation Performed
1983-12-28 Perforation Treatment Performed - Jet Perforation
1983-12-28 Well Log Performed
1983-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-30 Perforation Treatment Performed - Jet Perforation
1983-12-30 Well Log Performed
1984-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-03 Perforation Treatment Performed - Jet Perforation
1984-01-03 Well Log Performed
1984-01-05 Perforation Treatment Performed - Fractured
1984-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-12 Perforation Treatment Performed - Cement Squeeze
1984-01-16 Perforation Treatment Performed - Jet Perforation
1984-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-11 Well Began Production
1984-02-11 Well Fluid changed to Crude Oil
1984-02-11 Well Mode changed to Pumping
1984-06-27 Well Log Performed
1984-06-28 Perforation Treatment Performed - Fractured
1986-11-26 Perforation Treatment Performed - Fractured
1986-11-28 Well Log Performed
1989-07-19 Perforation Treatment Performed - Fractured
1989-07-20 Perforation Treatment Performed - Alcohol Squeeze
1990-03-29 Perforation Treatment Performed - Chemical Squeeze
1991-07-15 Perforation Treatment Performed - Cement Squeeze
1991-07-17 Well Log Performed
1991-07-18 Perforation Treatment Performed - Jet Perforation
1991-07-23 Perforation Treatment Performed - Fractured
1991-07-24 Well Log Performed
1992-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-06 Plug Back Performed
1992-08-06 Well Log Performed
1992-08-07 Perforation Treatment Performed - Jet Perforation
1992-08-07 Well Log Performed
1992-08-08 Perforation Treatment Performed - Remedial Casing
1992-08-10 Perforation Treatment Performed - Jet Perforation
1992-08-10 Perforation Treatment Performed - Remedial Casing
1992-08-10 Well Log Performed
1992-08-11 Perforation Treatment Performed - Cement Plug
1992-08-11 Perforation Treatment Performed - Jet Perforation
1992-08-11 Perforation Treatment Performed - Remedial Casing
1992-08-11 Well Fluid changed to Crude Oil
1992-08-11 Well Log Performed
1992-08-11 Well Mode changed to Abandoned
1992-08-13 Well Abandoned
2011-10-21 Perforation Treatment Performed - Jet Perforation
2011-10-23 Perforation Treatment Performed - Cement Squeeze
2011-10-24 Perforation Treatment Performed - Cement Plug
2011-10-24 Plug Back Performed
2012-09-21 Well Log Performed
2012-10-09 Perforation Treatment Performed - Jet Perforation
2012-10-10 Perforation Treatment Performed - Jet Perforation
2012-10-15 Perforation Treatment Performed - Remedial Casing
2012-10-22 Perforation Treatment Performed - Jet Perforation
2012-10-24 Perforation Treatment Performed - Jet Perforation
2012-10-24 Perforation Treatment Performed - Remedial Casing
2014-11-24 Well Log Performed
2014-11-25 Well Log Performed
2014-12-09 Perforation Treatment Performed - Cement Plug
2014-12-09 Plug Back Performed
2014-12-11 Perforation Treatment Performed - Jet Perforation
2014-12-13 Perforation Treatment Performed - Cement Plug
2014-12-13 Perforation Treatment Performed - Remedial Casing
2014-12-13 Plug Back Performed
2015-01-15 Perforation Treatment Performed - Jet Perforation
2015-01-28 Perforation Treatment Performed - Remedial Casing
2015-01-30 Perforation Treatment Performed - Cement Plug
2015-01-30 Plug Back Performed
2015-10-27 Perforation Treatment Performed - Jet Perforation
2015-10-27 Perforation Treatment Performed - Remedial Casing
2015-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-04 Perforation Treatment Performed - Jet Perforation
2015-11-04 Plug Back Performed
2015-11-05 Perforation Treatment Performed - Jet Perforation
2015-11-05 Perforation Treatment Performed - Remedial Casing
2015-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-07 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-28 Perforation 1415.50 1417.30 13
1984-01-10 Acid Treatment 1392.80 1403.70 0
1984-01-12 Cement Squeeze 1392.80 1403.70 0
1984-01-16 Perforation 1399.10 1401.30 13
1984-01-16 Perforation 1402.30 1403.50 13
1984-01-17 Acid Treatment 1399.10 1403.50 0
1984-06-28 Fracture 1399.10 1403.50 0
1986-11-26 Fracture 1399.10 1403.60 0
1989-07-19 Fracture 1399.10 1403.70 0
1989-07-20 Alchohol Squeeze 1399.10 1403.70 0
1990-03-29 Chemical Squeeze 1399.10 1403.70 0
1983-12-29 Acid Treatment 1415.50 1417.30 0
1991-07-15 Cement Squeeze 1392.80 1397.00 0
1991-07-18 Perforation 1399.10 1401.30 13
1991-07-18 Perforation 1402.30 1403.50 13
1991-07-23 Fracture 1399.10 1417.30 0
1992-08-06 Packing Device Capped w/Cement 1374.00 1382.00 0
1992-08-07 Perforation 700.00 700.50 13
1992-08-08 Remedial Casing Cementing 700.00 700.50 0
1992-08-10 Perforation 505.00 505.50 13
1992-08-10 Remedial Casing Cementing 505.00 505.50 0
1992-08-11 Perforation 222.00 222.50 13
1983-12-30 Perforation 1392.80 1394.30 13
1992-08-11 Remedial Casing Cementing 222.00 222.50 0
1992-08-11 Cement Plug 172.00 222.00 0
2011-10-21 Perforation 431.00 432.00 17
2011-10-23 Cement Squeeze 431.00 432.00 0
2011-10-24 Cement Plug 393.40 451.20 0
2012-10-09 Perforation 335.00 336.00 17
2012-10-10 Perforation 285.00 286.00 17
2012-10-15 Remedial Casing Cementing 335.00 336.00 0
2012-10-15 Remedial Casing Cementing 285.00 286.00 0
2012-10-22 Perforation 282.00 286.00 20
1983-12-30 Perforation 1395.20 1396.20 13
2012-10-24 Perforation 230.00 235.00 20
2012-10-24 Remedial Casing Cementing 282.00 286.00 0
2012-10-24 Remedial Casing Cementing 230.00 235.00 0
2014-12-09 Cement Plug 1380.50 1412.00 0
2014-12-11 Perforation 1253.00 1254.00 17
2014-12-13 Remedial Casing Cementing 1253.00 1254.00 0
2014-12-13 Cement Plug 1239.00 1270.00 0
2015-01-15 Perforation 713.50 714.80 17
2015-01-28 Remedial Casing Cementing 713.00 714.80 0
2015-01-30 Cement Plug 698.00 725.00 0
1984-01-02 Acid Treatment 1392.80 1396.50 0
2015-10-27 Perforation 402.00 403.30 13
2015-10-27 Remedial Casing Cementing 402.00 403.30 0
2015-11-04 Packing Device Capped w/Cement 322.00 330.00 0
2015-11-04 Perforation 290.00 291.30 13
2015-11-05 Perforation 218.00 219.30 13
2015-11-05 Remedial Casing Cementing 218.00 219.30 0
2015-11-07 Packing Device Capped w/Cement 280.00 288.00 0
1984-01-03 Perforation 1398.50 1400.00 13
1984-01-03 Perforation 1400.80 1401.40 13
1984-01-03 Perforation 1402.20 1403.70 13
1984-01-05 Fracture 1392.80 1403.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6240 0.0 0.0 0.0
1985 7732 0.0 0.0 0.0
1986 7720 0.0 0.0 0.0
1987 7432 0.0 0.0 0.0
1988 7923 0.0 0.0 0.0
1989 7859 0.0 0.0 0.0
1990 5797 0.0 0.0 0.0
1991 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-10-24 No Incident Encountered 0.00 0.00
2015-01-30 No Incident Encountered 0.00 0.00
2015-11-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References